{"description":"Documents from Southeastern Power Administration","count":80,"total_pages":4,"next_page_url":"https://www.federalregister.gov/api/v1/documents?conditions%5Bagencies%5D%5B%5D=southeastern-power-administration&format=json&page=2&search_after_cursor=WzE1OTg0ODY0MDAwMDAsIjIwMjAtMTg4MjIiXQ","results":[{"title":"Notice of Interim Approval of the Rate Schedule for Jim Woodruff Project","type":"Notice","abstract":"The Administrator for the Southeastern Power Administration (Southeastern or SEPA) has confirmed and approved, on an interim basis, rate schedule JW-1-M for the sale of power from the Jim Woodruff Project. The rate schedule is approved on an interim basis through September 30, 2031, and is subject to confirmation and approval by the Federal Energy Regulatory Commission (FERC) on a final basis.","document_number":"2026-19342","html_url":"https://www.federalregister.gov/documents/2026/09/22/2026-19342/notice-of-interim-approval-of-the-rate-schedule-for-jim-woodruff-project","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2026-09-22/pdf/2026-19342.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2026-19342.pdf?1789994715","publication_date":"2026-09-22","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southeastern Power Administration","name":"Southeastern Power Administration","id":471,"url":"https://www.federalregister.gov/agencies/southeastern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/471","parent_id":136,"slug":"southeastern-power-administration"}],"excerpts":"The Administrator for the Southeastern Power Administration (Southeastern or SEPA) has confirmed and approved, on an interim basis, rate schedule JW-1-M for the sale of power from the Jim Woodruff Project. The rate schedule is approved on an interim..."},{"title":"Proposed Rate Adjustment, Jim Woodruff Project","type":"Notice","abstract":"Southeastern Power Administration (Southeastern or SEPA) proposes to revise existing schedules of rates and charges applicable to the sale of power from the Jim Woodruff Project, effective October 1, 2026, through September 30, 2031. Opportunities will be available for interested persons to review the present rates, supporting studies, to participate in a public forum and to submit written comments. Southeastern will evaluate all comments received in this process.","document_number":"2026-09784","html_url":"https://www.federalregister.gov/documents/2026/05/15/2026-09784/proposed-rate-adjustment-jim-woodruff-project","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2026-05-15/pdf/2026-09784.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2026-09784.pdf?1778762722","publication_date":"2026-05-15","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southeastern Power Administration","name":"Southeastern Power Administration","id":471,"url":"https://www.federalregister.gov/agencies/southeastern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/471","parent_id":136,"slug":"southeastern-power-administration"}],"excerpts":"Southeastern Power Administration (Southeastern or SEPA) proposes to revise existing schedules of rates and charges applicable to the sale of power from the Jim Woodruff Project, effective October 1, 2026, through September 30, 2031. Opportunities will..."},{"title":"Notice of Interim Approval of Rate Schedules for Cumberland System of Projects","type":"Notice","abstract":"The Administrator for the Southeastern Power Administration (Southeastern) has confirmed and approved, on an interim basis, rate schedules CBR-1-K, CSI-1-K, CEK-1-K, CM-1-K, CC-1-L, CK-1-K, CTV-1-K, CTVI-1-D, and Replacement-3. These rate schedules are applicable to Southeastern power sold to existing preference customers in Alabama, Georgia, Illinois, Kentucky, Mississippi, North Carolina, Tennessee, and Virginia. The rate schedules are approved on an interim basis through September 30, 2030, and are subject to confirmation and approval by the Federal Energy Regulatory Commission (FERC) on a final basis.","document_number":"2025-17843","html_url":"https://www.federalregister.gov/documents/2025/09/16/2025-17843/notice-of-interim-approval-of-rate-schedules-for-cumberland-system-of-projects","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-09-16/pdf/2025-17843.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-17843.pdf?1757940313","publication_date":"2025-09-16","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southeastern Power Administration","name":"Southeastern Power Administration","id":471,"url":"https://www.federalregister.gov/agencies/southeastern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/471","parent_id":136,"slug":"southeastern-power-administration"}],"excerpts":"The Administrator for the Southeastern Power Administration (Southeastern) has confirmed and approved, on an interim basis, rate schedules CBR-1-K, CSI-1-K, CEK-1-K, CM-1-K, CC-1-L, CK-1-K, CTV-1-K, CTVI-1-D, and Replacement-3. These rate schedules are..."},{"title":"Notice of Interim Approval of Rate Schedules for Kerr-Philpott System of Projects","type":"Notice","abstract":"The Administrator for the Southeastern Power Administration (Southeastern) has confirmed and approved, on an interim basis, rate schedules VA-1-E, VA-2-E, VA-3-E, VA-4-E, DEP-1-E, DEP-2-E, DEP-3-E, DEP-4-E, AP-1-E, AP-2-E, AP-3-E, AP-4-E, NC-1-E, and Replacement-2-D. These rate schedules are applicable to Southeastern power sold to existing preference customers in North Carolina and Virginia. The rate schedules are approved on an interim basis through September 30, 2030, and are subject to confirmation and approval by the Federal Energy Regulatory Commission (FERC) on a final basis.","document_number":"2025-17842","html_url":"https://www.federalregister.gov/documents/2025/09/16/2025-17842/notice-of-interim-approval-of-rate-schedules-for-kerr-philpott-system-of-projects","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-09-16/pdf/2025-17842.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-17842.pdf?1757940313","publication_date":"2025-09-16","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southeastern Power Administration","name":"Southeastern Power Administration","id":471,"url":"https://www.federalregister.gov/agencies/southeastern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/471","parent_id":136,"slug":"southeastern-power-administration"}],"excerpts":"The Administrator for the Southeastern Power Administration (Southeastern) has confirmed and approved, on an interim basis, rate schedules VA-1-E, VA-2-E, VA-3-E, VA-4-E, DEP-1-E, DEP-2-E, DEP-3-E, DEP-4-E, AP-1-E, AP-2-E, AP-3-E, AP-4-E, NC-1-E, and..."},{"title":"Proposed Rate Adjustment, Proposed Adjustment to True-Up Mechanism, Public Forum, and Opportunities for Public Review and Comment for Kerr-Philpott System","type":"Notice","abstract":"Southeastern Power Administration (Southeastern or SEPA) proposes to revise existing schedules of rates and charges applicable to the sale of power from the Kerr-Philpott System effective for a 5- year period, from October 1, 2025, through September 30, 2030. Opportunities will be available for interested persons to review the present rates and the proposed rates, supporting studies, to participate in a public forum and to submit written comments. Southeastern will evaluate all comments received in this process.","document_number":"2025-08617","html_url":"https://www.federalregister.gov/documents/2025/05/15/2025-08617/proposed-rate-adjustment-proposed-adjustment-to-true-up-mechanism-public-forum-and-opportunities-for","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-05-15/pdf/2025-08617.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-08617.pdf?1747226714","publication_date":"2025-05-15","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southeastern Power Administration","name":"Southeastern Power Administration","id":471,"url":"https://www.federalregister.gov/agencies/southeastern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/471","parent_id":136,"slug":"southeastern-power-administration"}],"excerpts":"Southeastern Power Administration (Southeastern or SEPA) proposes to revise existing schedules of rates and charges applicable to the sale of power from the Kerr-Philpott System effective for a 5- year period, from October 1, 2025, through September..."},{"title":"Proposed Rate Adjustment, Public Forum, and Opportunities for Public Review and Comment for Cumberland System of Projects","type":"Notice","abstract":"Southeastern Power Administration (Southeastern or SEPA) proposes to revise existing schedules of rates and charges applicable to the sale of power from the Cumberland System of Projects effective for a 5-year period, from October 1, 2025, through September 30, 2030. Opportunities will be available for interested persons to review the present rates and the proposed rates and supporting studies, to participate in a public forum, and to submit written comments. Southeastern will evaluate all comments received in this process.","document_number":"2025-08616","html_url":"https://www.federalregister.gov/documents/2025/05/15/2025-08616/proposed-rate-adjustment-public-forum-and-opportunities-for-public-review-and-comment-for-cumberland","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-05-15/pdf/2025-08616.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-08616.pdf?1747226714","publication_date":"2025-05-15","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southeastern Power Administration","name":"Southeastern Power Administration","id":471,"url":"https://www.federalregister.gov/agencies/southeastern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/471","parent_id":136,"slug":"southeastern-power-administration"}],"excerpts":"Southeastern Power Administration (Southeastern or SEPA) proposes to revise existing schedules of rates and charges applicable to the sale of power from the Cumberland System of Projects effective for a 5-year period, from October 1, 2025, through..."},{"title":"Revision To Power Marketing Policy Cumberland System of Projects","type":"Notice","abstract":"Southeastern Power Administration (Southeastern or SEPA) announces revision to the power marketing policy for the Cumberland System of Projects to include a procedure for distribution of renewable energy certificates (RECs). The Cumberland System power marketing policy was published on August 5, 1993, and is reflected in contracts for the sale of system power, which are maintained in Southeastern's headquarters office. Pursuant to the Procedure for Public Participation in the Formulation of Marketing Policy, published in the Federal Register on July 6, 1978, Southeastern published on October 21, 2021, a notice of intent to revise the power marketing policy to include provisions regarding RECs from the Cumberland System. The proposed revision to the Cumberland System Power Marketing Policy was published in the Federal Register on April 25, 2023. A virtual web based public information and comment forum was held on June 29, 2023, with written comments due on or before July 14, 2023.","document_number":"2023-24456","html_url":"https://www.federalregister.gov/documents/2023/11/06/2023-24456/revision-to-power-marketing-policy-cumberland-system-of-projects","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2023-11-06/pdf/2023-24456.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2023-24456.pdf?1699015616","publication_date":"2023-11-06","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southeastern Power Administration","name":"Southeastern Power Administration","id":471,"url":"https://www.federalregister.gov/agencies/southeastern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/471","parent_id":136,"slug":"southeastern-power-administration"}],"excerpts":"Southeastern Power Administration (Southeastern or SEPA) announces revision to the power marketing policy for the Cumberland System of Projects to include a procedure for distribution of renewable energy certificates (RECs). The Cumberland System power..."},{"title":"Notice of Issuance of Final Power Marketing Policy, for the Jim Woodruff System Project","type":"Notice","abstract":"The Administrator has adopted the attached Final Power Marketing Policy for the Jim Woodruff System Project. The policy will be effective thirty days after publication in the Federal Register. The policy was developed in accordance with Southeastern's Procedure for Public Participation in the Formulation of Marketing Policy published July 6, 1978, pursuant to a notice of intent to formulate a power marketing policy published in the Federal Register of August 5, 2022, and a proposed policy published in the Federal Register of April 7, 2023. A public comment forum was held via a virtual web based meeting on June 8, 2023. Comments were due on or before June 23, 2023. Twelve comments were received relative to the proposed policy. The Administrator appointed a Staff Committee to prepare a Staff Evaluation of all oral and written comments and responses received by Southeastern and to make appropriate recommendations. The Staff Evaluation was completed on Sept 5, 2023. Following the Staff Evaluation, the Administrator decided to adopt the policy as modified.","document_number":"2023-23906","html_url":"https://www.federalregister.gov/documents/2023/10/30/2023-23906/notice-of-issuance-of-final-power-marketing-policy-for-the-jim-woodruff-system-project","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2023-10-30/pdf/2023-23906.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2023-23906.pdf?1698410844","publication_date":"2023-10-30","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southeastern Power Administration","name":"Southeastern Power Administration","id":471,"url":"https://www.federalregister.gov/agencies/southeastern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/471","parent_id":136,"slug":"southeastern-power-administration"}],"excerpts":"The Administrator has adopted the attached Final Power Marketing Policy for the Jim Woodruff System Project. The policy will be effective thirty days after publication in the Federal Register. The policy was developed in accordance with Southeastern's..."},{"title":"Revision to Power Marketing Policy Cumberland System of Projects","type":"Notice","abstract":"Pursuant to its Procedure for Public Participation in the Formulation of Marketing Policy, published in the Federal Register on July 6, 1978, Southeastern Power Administration (Southeastern) published on October 21, 2021, a notice of intent to revise its power marketing policy to include provisions regarding renewable energy certificates (RECs) from its Cumberland System of Projects. The current power marketing policy was published on August 5, 1993, for the Cumberland System (System) and is reflected in contracts for the sale of system power, which are maintained in Southeastern's headquarters office. The following is the proposed revision to the Cumberland System Power Marketing Policy to include a procedure for distribution of RECs to Preference Customers. Southeastern solicits written comments in formulating the final marketing policy revision.","document_number":"2023-08633","html_url":"https://www.federalregister.gov/documents/2023/04/25/2023-08633/revision-to-power-marketing-policy-cumberland-system-of-projects","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2023-04-25/pdf/2023-08633.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2023-08633.pdf?1682340320","publication_date":"2023-04-25","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southeastern Power Administration","name":"Southeastern Power Administration","id":471,"url":"https://www.federalregister.gov/agencies/southeastern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/471","parent_id":136,"slug":"southeastern-power-administration"}],"excerpts":"Pursuant to its Procedure for Public Participation in the Formulation of Marketing Policy, published in the Federal Register on July 6, 1978, Southeastern Power Administration (Southeastern) published on October 21, 2021, a notice of intent to revise..."},{"title":"Proposed Power Marketing Policy, Public Forum, and Opportunities for Public Review and Comment for the Jim Woodruff System Project","type":"Notice","abstract":"Southeastern Power Administration (Southeastern) proposes a Power Marketing Policy for the Jim Woodruff System Project pursuant to Notice published in the Federal Register of August 5, 2022, and in accordance with Procedure for Public Participation in the Formulation of Marketing Policy published July 6, 1978. The proposed power marketing policy will be implemented through contracts for terms not to exceed 10 years. Additionally, opportunities will be available for interested persons to review the proposed Power Marketing Policy, to participate in a public forum and to submit additional written comments. Southeastern will evaluate all comments received in this process.","document_number":"2023-07379","html_url":"https://www.federalregister.gov/documents/2023/04/07/2023-07379/proposed-power-marketing-policy-public-forum-and-opportunities-for-public-review-and-comment-for-the","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2023-04-07/pdf/2023-07379.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2023-07379.pdf?1680785135","publication_date":"2023-04-07","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southeastern Power Administration","name":"Southeastern Power Administration","id":471,"url":"https://www.federalregister.gov/agencies/southeastern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/471","parent_id":136,"slug":"southeastern-power-administration"}],"excerpts":"Southeastern Power Administration (Southeastern) proposes a Power Marketing Policy for the Jim Woodruff System Project pursuant to Notice published in the Federal Register of August 5, 2022, and in accordance with Procedure for Public Participation in..."},{"title":"Revision to Power Marketing Policy Georgia-Alabama-South Carolina System of Projects","type":"Notice","abstract":"Southeastern Power Administration (Southeastern or SEPA) announces revision to the power marketing policy for the Georgia- Alabama-South Carolina System of Projects to include a procedure for distribution of renewable energy certificates (RECs). The Georgia- Alabama-South Carolina System power marketing policy was published on December 28, 1994, and is reflected in contracts for the sale of system power, which are maintained in Southeastern's headquarters office. Pursuant to the Procedure for Public Participation in the Formulation of Marketing Policy, published in the Federal Register on July 6, 1978, Southeastern published on January 14, 2022, a notice of intent to revise the power marketing policy to include provisions regarding RECs from the Georgia-Alabama-South Carolina System. The proposed revision to the Georgia-Alabama-South Carolina System Power Marketing Policy was published in the Federal Register on August 16, 2022. A virtual web based public information and comment forum was held on October 19, 2022, with written comments due on or before November 3, 2022.","document_number":"2022-27289","html_url":"https://www.federalregister.gov/documents/2022/12/16/2022-27289/revision-to-power-marketing-policy-georgia-alabama-south-carolina-system-of-projects","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2022-12-16/pdf/2022-27289.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2022-27289.pdf?1671111936","publication_date":"2022-12-16","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southeastern Power Administration","name":"Southeastern Power Administration","id":471,"url":"https://www.federalregister.gov/agencies/southeastern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/471","parent_id":136,"slug":"southeastern-power-administration"}],"excerpts":"Southeastern Power Administration (Southeastern or SEPA) announces revision to the power marketing policy for the Georgia- Alabama-South Carolina System of Projects to include a procedure for distribution of renewable energy certificates (RECs). The..."},{"title":"Notice of Interim Approval of Rate Schedules for the Georgia-Alabama-South Carolina Projects","type":"Notice","abstract":"The Administrator for the Southeastern Power Administration (Southeastern) has confirmed and approved, on an interim basis, rate schedules SOCO-1-G, SOCO-2-G, SOCO-3-G, SOCO-4-G, Duke-1-G, Duke-2-G, Duke-3-G, Duke-4-G, Santee-1-G, Santee-2-G, Santee-3-G, Santee-4-G, SCE&G-1-G, SCE&G-2-G, SCE&G-3-G, SCE&G-4-G, Pump-1-A, and Replacement- 1. These rate schedules are applicable to Southeastern power sold to existing preference customers in Alabama, Florida, Georgia, Mississippi, North Carolina, and South Carolina. The rate schedules are approved on an interim basis through September 30, 2027, and are subject to confirmation and approval by the Federal Energy Regulatory Commission (FERC) on a final basis.","document_number":"2022-18686","html_url":"https://www.federalregister.gov/documents/2022/08/30/2022-18686/notice-of-interim-approval-of-rate-schedules-for-the-georgia-alabama-south-carolina-projects","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2022-08-30/pdf/2022-18686.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2022-18686.pdf?1661777132","publication_date":"2022-08-30","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southeastern Power Administration","name":"Southeastern Power Administration","id":471,"url":"https://www.federalregister.gov/agencies/southeastern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/471","parent_id":136,"slug":"southeastern-power-administration"}],"excerpts":"The Administrator for the Southeastern Power Administration (Southeastern) has confirmed and approved, on an interim basis, rate schedules SOCO-1-G, SOCO-2-G, SOCO-3-G, SOCO-4-G, Duke-1-G, Duke-2-G, Duke-3-G, Duke-4-G, Santee-1-G, Santee-2-G,..."},{"title":"Revision to Power Marketing Policy Georgia-Alabama-South Carolina System of Projects","type":"Notice","abstract":"Pursuant to its Procedure for Public Participation in the Formulation of Marketing Policy, published in the Federal Register on July 6, 1978, Southeastern Power Administration (Southeastern) published on January 14, 2022, a notice of intent to revise its power marketing policy to include provisions regarding renewable energy certificates (RECs) from its Georgia-Alabama-South Carolina System of Projects. The current power marketing policy was published on December 28, 1994, for the Georgia-Alabama-South Carolina System (System) and is reflected in contracts for the sale of system power, which are maintained in Southeastern's headquarters office. The following is the proposed revision to the Georgia-Alabama-South Carolina System Power Marketing Policy to include a procedure for distribution of RECs to Preference Customers. Southeastern solicits written comments in formulating the final marketing policy revision.","document_number":"2022-17575","html_url":"https://www.federalregister.gov/documents/2022/08/16/2022-17575/revision-to-power-marketing-policy-georgia-alabama-south-carolina-system-of-projects","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2022-08-16/pdf/2022-17575.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2022-17575.pdf?1660567525","publication_date":"2022-08-16","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southeastern Power Administration","name":"Southeastern Power Administration","id":471,"url":"https://www.federalregister.gov/agencies/southeastern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/471","parent_id":136,"slug":"southeastern-power-administration"}],"excerpts":"Pursuant to its Procedure for Public Participation in the Formulation of Marketing Policy, published in the Federal Register on July 6, 1978, Southeastern Power Administration (Southeastern) published on January 14, 2022, a notice of intent to revise..."},{"title":"Intent to Formulate Power Marketing Policy Jim Woodruff System Project","type":"Notice","abstract":"Pursuant to its Procedure for Public Participation in the Formulation of Marketing Policy published in the Federal Register of July 6, 1978, Southeastern Power Administration (Southeastern) intends to create a marketing policy for future disposition of power from the Jim Woodruff System. Southeastern solicits written comments and proposals in formulating the proposed marketing policy.","document_number":"2022-16797","html_url":"https://www.federalregister.gov/documents/2022/08/05/2022-16797/intent-to-formulate-power-marketing-policy-jim-woodruff-system-project","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2022-08-05/pdf/2022-16797.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2022-16797.pdf?1659617126","publication_date":"2022-08-05","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southeastern Power Administration","name":"Southeastern Power Administration","id":471,"url":"https://www.federalregister.gov/agencies/southeastern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/471","parent_id":136,"slug":"southeastern-power-administration"}],"excerpts":"Pursuant to its Procedure for Public Participation in the Formulation of Marketing Policy published in the Federal Register of July 6, 1978, Southeastern Power Administration (Southeastern) intends to create a marketing policy for future disposition of..."},{"title":"Proposed Rate Adjustment, Public Forum, and Opportunities for Public Review and Comment for Georgia-Alabama-South Carolina System of Projects","type":"Notice","abstract":"Southeastern Power Administration (Southeastern) proposes to revise existing schedules of rates and charges applicable to the sale of power from the Georgia-Alabama-South Carolina System of Projects effective for a 5-year period, October 1, 2022, through September 30, 2027. Additionally, opportunities will be available for interested persons to review the present rates and the proposed rates and supporting studies, to participate in a public forum and to submit written comments. Southeastern will evaluate all comments received in this process.","document_number":"2022-06305","html_url":"https://www.federalregister.gov/documents/2022/03/25/2022-06305/proposed-rate-adjustment-public-forum-and-opportunities-for-public-review-and-comment-for","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2022-03-25/pdf/2022-06305.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2022-06305.pdf?1648125918","publication_date":"2022-03-25","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southeastern Power Administration","name":"Southeastern Power Administration","id":471,"url":"https://www.federalregister.gov/agencies/southeastern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/471","parent_id":136,"slug":"southeastern-power-administration"}],"excerpts":"Southeastern Power Administration (Southeastern) proposes to revise existing schedules of rates and charges applicable to the sale of power from the Georgia-Alabama-South Carolina System of Projects effective for a 5-year period, October 1, 2022,..."},{"title":"Intent To Revise Power Marketing Policy Georgia-Alabama-South Carolina System of Projects","type":"Notice","abstract":"Pursuant to its Procedure for Public Participation in the Formulation of Marketing Policy, published in the Federal Register of July 6, 1978, Southeastern Power Administration (Southeastern) intends to revise the Georgia-Alabama-South Carolina System of Projects marketing policy by including provisions regarding renewable energy certificates (RECs). The current power marketing policy was published on December 28, 1994, for the Georgia-Alabama-South Carolina System, and is reflected in contracts for the sale of system power, which are maintained in the Southeastern headquarters office. Southeastern solicits written comments and proposals in formulating the proposed marketing policy revision.","document_number":"2022-00668","html_url":"https://www.federalregister.gov/documents/2022/01/14/2022-00668/intent-to-revise-power-marketing-policy-georgia-alabama-south-carolina-system-of-projects","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2022-01-14/pdf/2022-00668.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2022-00668.pdf?1642081542","publication_date":"2022-01-14","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southeastern Power Administration","name":"Southeastern Power Administration","id":471,"url":"https://www.federalregister.gov/agencies/southeastern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/471","parent_id":136,"slug":"southeastern-power-administration"}],"excerpts":"Pursuant to its Procedure for Public Participation in the Formulation of Marketing Policy, published in the Federal Register of July 6, 1978, Southeastern Power Administration (Southeastern) intends to revise the Georgia-Alabama-South Carolina System..."},{"title":"Notice of Interim Approval of Rate Schedules for Jim Woodruff Project","type":"Notice","abstract":"The Administrator for the Southeastern Power Administration (Southeastern) has confirmed and approved, on an interim basis, rate schedules JW-1-L and JW-2-F for the sale of power from the Jim Woodruff Project. The rate schedules are approved on an interim basis through September 30, 2026, and are subject to confirmation and approval by the Federal Energy Regulatory Commission (FERC) on a final basis.","document_number":"2021-17747","html_url":"https://www.federalregister.gov/documents/2021/08/19/2021-17747/notice-of-interim-approval-of-rate-schedules-for-jim-woodruff-project","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2021-08-19/pdf/2021-17747.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2021-17747.pdf?1629290719","publication_date":"2021-08-19","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southeastern Power Administration","name":"Southeastern Power Administration","id":471,"url":"https://www.federalregister.gov/agencies/southeastern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/471","parent_id":136,"slug":"southeastern-power-administration"}],"excerpts":"The Administrator for the Southeastern Power Administration (Southeastern) has confirmed and approved, on an interim basis, rate schedules JW-1-L and JW-2-F for the sale of power from the Jim Woodruff Project. The rate schedules are approved on an..."},{"title":"Proposed Rate Adjustment, Jim Woodruff Project","type":"Notice","abstract":"Southeastern Power Administration (Southeastern) proposes to revise existing schedules of rates and charges applicable to the sale of power from the Jim Woodruff Project, effective October 1, 2021, through September 30, 2026. Interested persons may review the rates and supporting studies and submit written comments. Southeastern will consider all comments received in this process.","document_number":"2021-06632","html_url":"https://www.federalregister.gov/documents/2021/03/31/2021-06632/proposed-rate-adjustment-jim-woodruff-project","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2021-03-31/pdf/2021-06632.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2021-06632.pdf?1617108342","publication_date":"2021-03-31","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southeastern Power Administration","name":"Southeastern Power Administration","id":471,"url":"https://www.federalregister.gov/agencies/southeastern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/471","parent_id":136,"slug":"southeastern-power-administration"}],"excerpts":"Southeastern Power Administration (Southeastern) proposes to revise existing schedules of rates and charges applicable to the sale of power from the Jim Woodruff Project, effective October 1, 2021, through September 30, 2026. Interested persons may..."},{"title":"Revision to Power Marketing Policy Kerr-Philpott System of Projects","type":"Notice","abstract":"Southeastern Power Administration (Southeastern or SEPA) announces revision to the power marketing policy for the Kerr-Philpott System of Projects (Kerr-Philpott System). The Kerr-Philpott System power marketing policy was published on July 29, 1985, and is reflected in contracts for the sale of system power, which are maintained in Southeastern's headquarters office. Pursuant to the Procedure for Public Participation in the Formulation of Marketing Policy, published in the Federal Register of July 6, 1978, Southeastern published on November 15, 2019, a notice of intent to revise the power marketing policy to include provisions regarding renewable energy certificates (RECs) from the Kerr-Philpott System. The proposed revision to the Kerr-Philpott System Power Marketing Policy was published in the Federal Register on June 19, 2020. A virtual web based public information and comment forum was held on August 18, 2020, with written comments due on or before September 2, 2020.","document_number":"2020-23113","html_url":"https://www.federalregister.gov/documents/2020/10/19/2020-23113/revision-to-power-marketing-policy-kerr-philpott-system-of-projects","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2020-10-19/pdf/2020-23113.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2020-23113.pdf?1602852342","publication_date":"2020-10-19","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southeastern Power Administration","name":"Southeastern Power Administration","id":471,"url":"https://www.federalregister.gov/agencies/southeastern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/471","parent_id":136,"slug":"southeastern-power-administration"}],"excerpts":"Southeastern Power Administration (Southeastern or SEPA) announces revision to the power marketing policy for the Kerr-Philpott System of Projects (Kerr-Philpott System). The Kerr-Philpott System power marketing policy was published on July 29, 1985,..."},{"title":"Notice of Interim Approval of Rate Schedules for Cumberland System","type":"Notice","abstract":"The Administrator for the Southeastern Power Administration (Southeastern) has confirmed and approved, on an interim basis, new rate schedules CBR-1-J, CSI-1-J, CEK-1-J, CM-1-J, CC-1-K, CK-1-J, CTV- 1-J, CTVI-1-C, and Replacement-3. The rate schedules are approved on an interim basis through September 30, 2025, and are subject to confirmation and approval by the Federal Energy Regulatory Commission (FERC) on a final basis.","document_number":"2020-18822","html_url":"https://www.federalregister.gov/documents/2020/08/27/2020-18822/notice-of-interim-approval-of-rate-schedules-for-cumberland-system","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2020-08-27/pdf/2020-18822.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2020-18822.pdf?1598445917","publication_date":"2020-08-27","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southeastern Power Administration","name":"Southeastern Power Administration","id":471,"url":"https://www.federalregister.gov/agencies/southeastern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/471","parent_id":136,"slug":"southeastern-power-administration"}],"excerpts":"The Administrator for the Southeastern Power Administration (Southeastern) has confirmed and approved, on an interim basis, new rate schedules CBR-1-J, CSI-1-J, CEK-1-J, CM-1-J, CC-1-K, CK-1-J, CTV- 1-J, CTVI-1-C, and Replacement-3. The rate schedules..."}]}