{"description":"Documents from Southwestern Power Administration","count":126,"total_pages":7,"next_page_url":"https://www.federalregister.gov/api/v1/documents?conditions%5Bagencies%5D%5B%5D=southwestern-power-administration&format=json&page=2&search_after_cursor=WzE1Njk4MDE2MDAwMDAsIjIwMTktMjEwNDEiXQ","results":[{"title":"Robert D. Willis Power Rate","type":"Notice","abstract":"Southwestern Power Administration (Southwestern) proposes to revise the existing Robert Douglas Willis Hydropower Project (Robert D. Willis) Rate Schedule to increase annual revenues by 28.6% from $1,282,836 to $1,650,648 effective August 1, 2025, through September 30, 2027. Interested persons may review the proposed rate and supporting studies on Southwestern's website and submit comments. Southwestern will evaluate all comments received in this process.","document_number":"2025-08740","html_url":"https://www.federalregister.gov/documents/2025/05/16/2025-08740/robert-d-willis-power-rate","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-05-16/pdf/2025-08740.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-08740.pdf?1747313117","publication_date":"2025-05-16","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southwestern Power Administration","name":"Southwestern Power Administration","id":472,"url":"https://www.federalregister.gov/agencies/southwestern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/472","parent_id":136,"slug":"southwestern-power-administration"}],"excerpts":"Southwestern Power Administration (Southwestern) proposes to revise the existing Robert Douglas Willis Hydropower Project (Robert D. Willis) Rate Schedule to increase annual revenues by 28.6% from $1,282,836 to $1,650,648 effective August 1, 2025,..."},{"title":"Integrated System-Rate Order No. SWPA-87","type":"Notice","abstract":"The Administrator of the Southwestern Power Administration (Southwestern) has confirmed, approved, and placed into effect on an interim basis Rate Order No. SWPA-87 (Rate Order), which provides the following Integrated System rate schedules: Wholesale Rates for Hydro Peaking Power (P-23), Wholesale Rates for Non-Federal Service (NFS-23), and Wholesale Rates for Excess Energy (EE-23). These new rate schedules replace the existing power rates under Rate Schedules P-13B, NFTS-13A, and EE-13 which expire on September 30, 2025. Rate Schedules P-23, NFS- 23, and EE-23 increase the annual wholesale power rate for the Integrated System by 22.8 percent.","document_number":"2025-07350","html_url":"https://www.federalregister.gov/documents/2025/04/29/2025-07350/integrated-system-rate-order-no-swpa-87","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-04-29/pdf/2025-07350.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-07350.pdf?1745844314","publication_date":"2025-04-29","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southwestern Power Administration","name":"Southwestern Power Administration","id":472,"url":"https://www.federalregister.gov/agencies/southwestern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/472","parent_id":136,"slug":"southwestern-power-administration"}],"excerpts":"The Administrator of the Southwestern Power Administration (Southwestern) has confirmed, approved, and placed into effect on an interim basis Rate Order No. SWPA-87 (Rate Order), which provides the following Integrated System rate schedules: Wholesale..."},{"title":"Integrated System Power Rates","type":"Notice","abstract":"Southwestern Power Administration (Southwestern) proposes to revise the existing Integrated System rate schedules to meet the identified average annual revenue need of $237,821,129, an increase of $44,230,649 (22.8 percent), effective April 1, 2025, through September 30, 2027. Interested persons may review the proposed rate and supporting studies on Southwestern's website, request to participate in a public forum, and submit comments. Southwestern will evaluate all comments received in this process.","document_number":"2024-26144","html_url":"https://www.federalregister.gov/documents/2024/11/12/2024-26144/integrated-system-power-rates","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2024-11-12/pdf/2024-26144.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2024-26144.pdf?1731073589","publication_date":"2024-11-12","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southwestern Power Administration","name":"Southwestern Power Administration","id":472,"url":"https://www.federalregister.gov/agencies/southwestern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/472","parent_id":136,"slug":"southwestern-power-administration"}],"excerpts":"Southwestern Power Administration (Southwestern) proposes to revise the existing Integrated System rate schedules to meet the identified average annual revenue need of $237,821,129, an increase of $44,230,649 (22.8 percent), effective April 1, 2025,..."},{"title":"Robert D. Willis Hydropower Project Rate Schedule","type":"Notice","abstract":"The Administrator, Southwestern Power Administration (Southwestern), has approved and placed into effect Rate Order No. SWPA-86, which provides a temporary extension of Southwestern's current Robert D. Willis Hydropower Project rate schedule (RDW-15) through September 30, 2025, unless superseded.","document_number":"2024-21530","html_url":"https://www.federalregister.gov/documents/2024/09/20/2024-21530/robert-d-willis-hydropower-project-rate-schedule","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2024-09-20/pdf/2024-21530.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2024-21530.pdf?1726749941","publication_date":"2024-09-20","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southwestern Power Administration","name":"Southwestern Power Administration","id":472,"url":"https://www.federalregister.gov/agencies/southwestern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/472","parent_id":136,"slug":"southwestern-power-administration"}],"excerpts":"The Administrator, Southwestern Power Administration (Southwestern), has approved and placed into effect Rate Order No. SWPA-86, which provides a temporary extension of Southwestern's current Robert D. Willis Hydropower Project rate schedule (RDW-15)..."},{"title":"Integrated System Rate Schedules","type":"Notice","abstract":"The Administrator of the Southwestern Power Administration (Southwestern) has approved and implemented Rate Order No. SWPA-85, which grants a temporary extension of Southwestern's current Integrated System rate schedules (P-13B, NFTS-13A, and EE-13) through September 30, 2025, unless superseded.","document_number":"2024-21529","html_url":"https://www.federalregister.gov/documents/2024/09/20/2024-21529/integrated-system-rate-schedules","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2024-09-20/pdf/2024-21529.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2024-21529.pdf?1726749941","publication_date":"2024-09-20","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southwestern Power Administration","name":"Southwestern Power Administration","id":472,"url":"https://www.federalregister.gov/agencies/southwestern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/472","parent_id":136,"slug":"southwestern-power-administration"}],"excerpts":"The Administrator of the Southwestern Power Administration (Southwestern) has approved and implemented Rate Order No. SWPA-85, which grants a temporary extension of Southwestern's current Integrated System rate schedules (P-13B, NFTS-13A, and EE-13)..."},{"title":"Sam Rayburn Dam-Rate Order No. SWPA-84","type":"Notice","abstract":"The Administrator, Southwestern Power Administration (Southwestern), has confirmed, approved and placed into effect on an interim basis Rate Order No. SWPA-84 (Rate Order), which provides the rate schedule Wholesale Rates for Hydro Power and Energy at Sam Rayburn Dam and Reservoir (SRD-23). This new rate schedule for the Sam Rayburn Dam and Reservoir (Rayburn) replaces the existing power rate under Rate Schedule SRD-15 which expires on September 30, 2024. Rate Schedule SRD- 23 increases the annual wholesale power rate for Rayburn by 21.1 percent.","document_number":"2024-19564","html_url":"https://www.federalregister.gov/documents/2024/08/30/2024-19564/sam-rayburn-dam-rate-order-no-swpa-84","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2024-08-30/pdf/2024-19564.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2024-19564.pdf?1724935531","publication_date":"2024-08-30","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southwestern Power Administration","name":"Southwestern Power Administration","id":472,"url":"https://www.federalregister.gov/agencies/southwestern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/472","parent_id":136,"slug":"southwestern-power-administration"}],"excerpts":"The Administrator, Southwestern Power Administration (Southwestern), has confirmed, approved and placed into effect on an interim basis Rate Order No. SWPA-84 (Rate Order), which provides the rate schedule Wholesale Rates for Hydro Power and Energy at..."},{"title":"Sam Rayburn Dam Power Rate","type":"Notice","abstract":"Southwestern Power Administration (Southwestern) proposes to revise the existing Sam Rayburn Dam Rate Schedule to increase annual revenues by approximately 21.10% from $4,563,792 to $5,526,588 effective May 1, 2024, through September 30, 2028. Interested persons may review the proposed rate and supporting studies on Southwestern's website, request to participate in a public forum, and submit comments. Southwestern will evaluate all comments received in this process.","document_number":"2023-26629","html_url":"https://www.federalregister.gov/documents/2023/12/05/2023-26629/sam-rayburn-dam-power-rate","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2023-12-05/pdf/2023-26629.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2023-26629.pdf?1701697530","publication_date":"2023-12-05","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southwestern Power Administration","name":"Southwestern Power Administration","id":472,"url":"https://www.federalregister.gov/agencies/southwestern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/472","parent_id":136,"slug":"southwestern-power-administration"}],"excerpts":"Southwestern Power Administration (Southwestern) proposes to revise the existing Sam Rayburn Dam Rate Schedule to increase annual revenues by approximately 21.10% from $4,563,792 to $5,526,588 effective May 1, 2024, through September 30, 2028...."},{"title":"Robert D. Willis Hydropower Project Rate Schedule","type":"Notice","abstract":"The Administrator, Southwestern Power Administration (Southwestern), has approved and placed into effect Rate Order No. SWPA-83, which provides a temporary extension of Southwestern's current Robert D. Willis Hydropower Project rate schedule (RDW-15) through September 30, 2024, unless superseded.","document_number":"2023-21453","html_url":"https://www.federalregister.gov/documents/2023/09/29/2023-21453/robert-d-willis-hydropower-project-rate-schedule","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2023-09-29/pdf/2023-21453.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2023-21453.pdf?1695905327","publication_date":"2023-09-29","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southwestern Power Administration","name":"Southwestern Power Administration","id":472,"url":"https://www.federalregister.gov/agencies/southwestern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/472","parent_id":136,"slug":"southwestern-power-administration"}],"excerpts":"The Administrator, Southwestern Power Administration (Southwestern), has approved and placed into effect Rate Order No. SWPA-83, which provides a temporary extension of Southwestern's current Robert D. Willis Hydropower Project rate schedule (RDW-15)..."},{"title":"Sam Rayburn Dam Rate Schedule","type":"Notice","abstract":"The Administrator, Southwestern Power Administration (Southwestern), has approved and placed into effect Rate Order No. SWPA-82, which provides a temporary extension of Southwestern's current Sam Rayburn Dam rate schedule (SRD-15) through September 30, 2024, unless superseded.","document_number":"2023-21451","html_url":"https://www.federalregister.gov/documents/2023/09/29/2023-21451/sam-rayburn-dam-rate-schedule","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2023-09-29/pdf/2023-21451.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2023-21451.pdf?1695905322","publication_date":"2023-09-29","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southwestern Power Administration","name":"Southwestern Power Administration","id":472,"url":"https://www.federalregister.gov/agencies/southwestern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/472","parent_id":136,"slug":"southwestern-power-administration"}],"excerpts":"The Administrator, Southwestern Power Administration (Southwestern), has approved and placed into effect Rate Order No. SWPA-82, which provides a temporary extension of Southwestern's current Sam Rayburn Dam rate schedule (SRD-15) through September 30,..."},{"title":"Integrated System Rate Schedules","type":"Notice","abstract":"The Administrator, Southwestern Power Administration (Southwestern), has approved and placed into effect Rate Order No. SWPA-81, which provides a temporary extension of Southwestern's current Integrated System rate schedules (P-13B, NFTS-13A, and EE-13) through September 30, 2024, unless superseded.","document_number":"2023-21449","html_url":"https://www.federalregister.gov/documents/2023/09/29/2023-21449/integrated-system-rate-schedules","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2023-09-29/pdf/2023-21449.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2023-21449.pdf?1695905321","publication_date":"2023-09-29","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southwestern Power Administration","name":"Southwestern Power Administration","id":472,"url":"https://www.federalregister.gov/agencies/southwestern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/472","parent_id":136,"slug":"southwestern-power-administration"}],"excerpts":"The Administrator, Southwestern Power Administration (Southwestern), has approved and placed into effect Rate Order No. SWPA-81, which provides a temporary extension of Southwestern's current Integrated System rate schedules (P-13B, NFTS-13A, and..."},{"title":"Integrated System Power Rates-Rate Order No. SWPA-80","type":"Notice","abstract":"The Administrator, Southwestern Power Administration (Southwestern), has approved and placed into effect on an interim basis Rate Order No. SWPA-80 (Rate Order), which provides the following Integrated System Wholesale Rates for Hydro Peaking Power (P-13B) Rate Schedule: Rate Schedule P-13B, Wholesale Rates for Hydro Peaking Power (Rate Schedule P-13B).","document_number":"2023-14401","html_url":"https://www.federalregister.gov/documents/2023/07/07/2023-14401/integrated-system-power-rates-rate-order-no-swpa-80","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2023-07-07/pdf/2023-14401.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2023-14401.pdf?1688647534","publication_date":"2023-07-07","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southwestern Power Administration","name":"Southwestern Power Administration","id":472,"url":"https://www.federalregister.gov/agencies/southwestern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/472","parent_id":136,"slug":"southwestern-power-administration"}],"excerpts":"The Administrator, Southwestern Power Administration (Southwestern), has approved and placed into effect on an interim basis Rate Order No. SWPA-80 (Rate Order), which provides the following Integrated System Wholesale Rates for Hydro Peaking Power..."},{"title":"Integrated System Power Rates","type":"Notice","abstract":"The Administrator, Southwestern Power Administration (Southwestern), is proposing to update the Peaking Energy Schedule Submission Time in Southwestern's existing Integrated System Wholesale Rates for Hydro Peaking Power (P-13A) Rate Schedule. Southwestern has determined that the shift in Peaking Energy Schedule Submission Time from the current 2:30 p.m. CPT to the proposed 8:30 a.m. CPT provides Southwestern with more flexibility and greater certainty when making replacement power purchases, and better aligns with regional energy market considerations.","document_number":"2023-07059","html_url":"https://www.federalregister.gov/documents/2023/04/05/2023-07059/integrated-system-power-rates","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2023-04-05/pdf/2023-07059.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2023-07059.pdf?1680612323","publication_date":"2023-04-05","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southwestern Power Administration","name":"Southwestern Power Administration","id":472,"url":"https://www.federalregister.gov/agencies/southwestern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/472","parent_id":136,"slug":"southwestern-power-administration"}],"excerpts":"The Administrator, Southwestern Power Administration (Southwestern), is proposing to update the Peaking Energy Schedule Submission Time in Southwestern's existing Integrated System Wholesale Rates for Hydro Peaking Power (P-13A) Rate Schedule...."},{"title":"Integrated System Rate Schedules","type":"Notice","abstract":"The Administrator, Southwestern Power Administration (Southwestern) has approved and placed into effect on an interim basis Rate Order No. SWPA-77, which extends the following existing Southwestern Integrated System rate schedules: Rate Schedule P-13A, Wholesale Rates for Hydro Peaking Power; Rate Schedule NFTS-13A, Wholesale Rates for Non-Federal Transmission/Interconnection Facilities Service; and Rate Schedule EE-13, Wholesale Rates for Excess Energy. This is an interim rate action effective October 1, 2021, extending for a period of two years through September 30, 2023.","document_number":"2021-19718","html_url":"https://www.federalregister.gov/documents/2021/09/14/2021-19718/integrated-system-rate-schedules","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2021-09-14/pdf/2021-19718.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2021-19718.pdf?1631537133","publication_date":"2021-09-14","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southwestern Power Administration","name":"Southwestern Power Administration","id":472,"url":"https://www.federalregister.gov/agencies/southwestern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/472","parent_id":136,"slug":"southwestern-power-administration"}],"excerpts":"The Administrator, Southwestern Power Administration (Southwestern) has approved and placed into effect on an interim basis Rate Order No. SWPA-77, which extends the following existing Southwestern Integrated System rate schedules: Rate Schedule P-13A,..."},{"title":"Robert D. Willis Hydropower Project Rate Schedule","type":"Notice","abstract":"The Administrator, Southwestern Power Administration (Southwestern) has approved and placed into effect on an interim basis Rate Order No. SWPA-79, which extends the following existing Southwestern Robert D. Willis Hydropower Project rate: Rate Schedule RDW-15, Wholesale Rates for Hydro Power and Energy. This is an interim rate action effective October 1, 2021, extending for a period of two years through September 30, 2023.","document_number":"2021-19396","html_url":"https://www.federalregister.gov/documents/2021/09/09/2021-19396/robert-d-willis-hydropower-project-rate-schedule","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2021-09-09/pdf/2021-19396.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2021-19396.pdf?1631105123","publication_date":"2021-09-09","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southwestern Power Administration","name":"Southwestern Power Administration","id":472,"url":"https://www.federalregister.gov/agencies/southwestern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/472","parent_id":136,"slug":"southwestern-power-administration"}],"excerpts":"The Administrator, Southwestern Power Administration (Southwestern) has approved and placed into effect on an interim basis Rate Order No. SWPA-79, which extends the following existing Southwestern Robert D. Willis Hydropower Project rate: Rate..."},{"title":"Sam Rayburn Dam Rate Schedule","type":"Notice","abstract":"The Administrator, Southwestern Power Administration (Southwestern) has approved and placed into effect on an interim basis Rate Order No. SWPA-78, which extends the following existing Southwestern Sam Rayburn Dam Hydropower Project rate schedule: Rate Schedule SRD-15, Wholesale Rates for Hydro Power and Energy. This is an interim rate action effective October 1, 2021, extending for a period of two years through September 30, 2023.","document_number":"2021-19395","html_url":"https://www.federalregister.gov/documents/2021/09/09/2021-19395/sam-rayburn-dam-rate-schedule","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2021-09-09/pdf/2021-19395.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2021-19395.pdf?1631105123","publication_date":"2021-09-09","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southwestern Power Administration","name":"Southwestern Power Administration","id":472,"url":"https://www.federalregister.gov/agencies/southwestern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/472","parent_id":136,"slug":"southwestern-power-administration"}],"excerpts":"The Administrator, Southwestern Power Administration (Southwestern) has approved and placed into effect on an interim basis Rate Order No. SWPA-78, which extends the following existing Southwestern Sam Rayburn Dam Hydropower Project rate schedule: Rate..."},{"title":"2021 Continuation of Temporary Power Sales Program","type":"Notice","abstract":"Southwestern Power Administration (Southwestern) is accepting new applications under its Temporary Power Sales Program for 2021. Electric utility organizations interested in participating in the Temporary Power Sales Program should notify Southwestern of their interest by providing the information requested in the enclosed Resource Data Form B-2 and/or Resource Data Form L-2 to Southwestern.","document_number":"2021-19239","html_url":"https://www.federalregister.gov/documents/2021/09/07/2021-19239/2021-continuation-of-temporary-power-sales-program","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2021-09-07/pdf/2021-19239.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2021-19239.pdf?1630673138","publication_date":"2021-09-07","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southwestern Power Administration","name":"Southwestern Power Administration","id":472,"url":"https://www.federalregister.gov/agencies/southwestern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/472","parent_id":136,"slug":"southwestern-power-administration"}],"excerpts":"Southwestern Power Administration (Southwestern) is accepting new applications under its Temporary Power Sales Program for 2021. Electric utility organizations interested in participating in the Temporary Power Sales Program should notify Southwestern..."},{"title":"Integrated System, Sam Rayburn Dam, and Robert D. Willis Rate Schedules","type":"Notice","abstract":"The Administrator, Southwestern Power Administration (Southwestern), is proposing a two-year extension to the currently approved rate schedules for the Integrated System, the Sam Rayburn Dam, and the Robert Douglas Willis Hydropower Project (Robert D. Willis) for the period of October 1, 2021 to September 30, 2023. Southwestern's current Integrated System rate schedules (P-13A, NFTS-13A, and EE-13), the Sam Rayburn Dam rate schedule (SRD-15), and the Robert D. Willis rate schedule (RDW-15), expire September 30, 2021.","document_number":"2021-12425","html_url":"https://www.federalregister.gov/documents/2021/06/14/2021-12425/integrated-system-sam-rayburn-dam-and-robert-d-willis-rate-schedules","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2021-06-14/pdf/2021-12425.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2021-12425.pdf?1623415535","publication_date":"2021-06-14","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southwestern Power Administration","name":"Southwestern Power Administration","id":472,"url":"https://www.federalregister.gov/agencies/southwestern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/472","parent_id":136,"slug":"southwestern-power-administration"}],"excerpts":"The Administrator, Southwestern Power Administration (Southwestern), is proposing a two-year extension to the currently approved rate schedules for the Integrated System, the Sam Rayburn Dam, and the Robert Douglas Willis Hydropower Project (Robert D...."},{"title":"Continuation of Temporary Power Sales Program","type":"Notice","abstract":"Southwestern Power Administration (Southwestern) is accepting new applications under its Temporary Power Sales Program. Electric utility organizations interested in participating in the Temporary Power Sales Program should notify Southwestern of their interest by providing the information requested in the enclosed Resource Data Form B-2 and/or Resource Data Form L-2 to Southwestern.","document_number":"2019-23373","html_url":"https://www.federalregister.gov/documents/2019/10/25/2019-23373/continuation-of-temporary-power-sales-program","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2019-10-25/pdf/2019-23373.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2019-23373.pdf?1571921128","publication_date":"2019-10-25","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southwestern Power Administration","name":"Southwestern Power Administration","id":472,"url":"https://www.federalregister.gov/agencies/southwestern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/472","parent_id":136,"slug":"southwestern-power-administration"}],"excerpts":"Southwestern Power Administration (Southwestern) is accepting new applications under its Temporary Power Sales Program. Electric utility organizations interested in participating in the Temporary Power Sales Program should notify Southwestern of their..."},{"title":"Robert D. Willis Hydropower Project Rate Schedule","type":"Notice","abstract":"The Assistant Secretary for Electricity has approved and placed into effect on an interim basis Rate Order No. SWPA-76, which extends the following existing Robert D. Willis Hydropower Project rate schedule for the Southwestern Power Administration: Rate Schedule RDW- 15, Wholesale Rates for Hydro Power and Energy. This is an interim rate action effective October 1, 2019, extending for a period of two years through September 30, 2021.","document_number":"2019-21042","html_url":"https://www.federalregister.gov/documents/2019/09/30/2019-21042/robert-d-willis-hydropower-project-rate-schedule","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2019-09-30/pdf/2019-21042.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2019-21042.pdf?1569588319","publication_date":"2019-09-30","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southwestern Power Administration","name":"Southwestern Power Administration","id":472,"url":"https://www.federalregister.gov/agencies/southwestern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/472","parent_id":136,"slug":"southwestern-power-administration"}],"excerpts":"The Assistant Secretary for Electricity has approved and placed into effect on an interim basis Rate Order No. SWPA-76, which extends the following existing Robert D. Willis Hydropower Project rate schedule for the Southwestern Power Administration:..."},{"title":"Sam Rayburn Dam Rate Schedule","type":"Notice","abstract":"The Assistant Secretary for Electricity has approved and placed into effect on an interim basis Rate Order No. SWPA-75, which extends the following existing Sam Rayburn Dam rate schedule for the Southwestern Power Administration: Rate Schedule SRD-15, Wholesale Rates for Hydro Power and Energy. This is an interim rate action effective October 1, 2019, extending for a period of two years through September 30, 2021.","document_number":"2019-21041","html_url":"https://www.federalregister.gov/documents/2019/09/30/2019-21041/sam-rayburn-dam-rate-schedule","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2019-09-30/pdf/2019-21041.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2019-21041.pdf?1569588319","publication_date":"2019-09-30","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Southwestern Power Administration","name":"Southwestern Power Administration","id":472,"url":"https://www.federalregister.gov/agencies/southwestern-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/472","parent_id":136,"slug":"southwestern-power-administration"}],"excerpts":"The Assistant Secretary for Electricity has approved and placed into effect on an interim basis Rate Order No. SWPA-75, which extends the following existing Sam Rayburn Dam rate schedule for the Southwestern Power Administration: Rate Schedule SRD-15,..."}]}