{"description":"Documents from Western Area Power Administration","count":662,"total_pages":34,"next_page_url":"https://www.federalregister.gov/api/v1/documents?conditions%5Bagencies%5D%5B%5D=western-area-power-administration&format=json&page=2&search_after_cursor=WzE3MzIwNjA4MDAwMDAsIjIwMjQtMjY5MzMiXQ","results":[{"title":"Desert Southwest Region and Western Area Lower Colorado Balancing Authority-Rate Order No. WAPA-222","type":"Notice","abstract":"The extension of the Desert Southwest Region's (DSW) existing balancing authority area and transmission provider services formula rates for Western Area Lower Colorado Balancing Authority has been confirmed, approved and placed into effect on an interim basis. The existing formula rates under Rate Schedules DSW-SD4 (Scheduling, System Control, and Dispatch), DSW-RS4 (Reactive Supply and Voltage Control), DSW-FR4 (Regulation and Frequency Response), DSW-SPR4 (Spinning Reserve), DSW-SUR4 (Supplemental Reserves), DSW-EI4 (Energy Imbalance), DSW-GI2 (Generator Imbalance), DSW-TL1 (Transmission Losses), DSW-UUI (Unreserved Use Penalties), DSW-EIM1T (Administrative Service), DSW- EIM4T (Energy Imbalance Service), and DSW-EIM9T (Generator Imbalance Service) expire on September 30, 2026. This rate extension makes no changes to the existing formula rates and extends them through September 30, 2031.","document_number":"2026-14901","html_url":"https://www.federalregister.gov/documents/2026/07/23/2026-14901/desert-southwest-region-and-western-area-lower-colorado-balancing-authority-rate-order-no-wapa-222","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2026-07-23/pdf/2026-14901.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2026-14901.pdf?1784724315","publication_date":"2026-07-23","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Western Area Power Administration","name":"Western Area Power Administration","id":525,"url":"https://www.federalregister.gov/agencies/western-area-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/525","parent_id":136,"slug":"western-area-power-administration"}],"excerpts":"The extension of the Desert Southwest Region's (DSW) existing balancing authority area and transmission provider services formula rates for Western Area Lower Colorado Balancing Authority has been confirmed, approved and placed into effect on an..."},{"title":"Boulder Canyon Project","type":"Notice","abstract":"The Desert Southwest region (DSW) of the Western Area Power Administration (WAPA) proposes the fiscal year (FY) 2027 base charge and rates for Boulder Canyon Project (BCP) electric service under Rate Schedule BCP-F11 to remain at $76.2 million, unchanged from FY 2026. The proposed base charge and rates would go into effect on October 1, 2026, and remain in effect through September 30, 2027. Publication of this Federal Register notice will initiate the public process.","document_number":"2026-12068","html_url":"https://www.federalregister.gov/documents/2026/06/16/2026-12068/boulder-canyon-project","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2026-06-16/pdf/2026-12068.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2026-12068.pdf?1781527514","publication_date":"2026-06-16","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Western Area Power Administration","name":"Western Area Power Administration","id":525,"url":"https://www.federalregister.gov/agencies/western-area-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/525","parent_id":136,"slug":"western-area-power-administration"}],"excerpts":"The Desert Southwest region (DSW) of the Western Area Power Administration (WAPA) proposes the fiscal year (FY) 2027 base charge and rates for Boulder Canyon Project (BCP) electric service under Rate Schedule BCP-F11 to remain at $76.2 million,..."},{"title":"2028 Resource Pool-Parker-Davis Project, Final Power Allocations","type":"Notice","abstract":"Western Area Power Administration (WAPA), a Federal Power Marketing Administration of the Department of Energy (DOE), announces its Parker-Davis Project (P-DP) final 2028 resource pool power allocations, developed under the requirements of the Final 2028 P-DP Power Marketing Plan. This notice also includes a summary of all comments received on WAPA's Proposed 2028 Resource Pool Allocations and WAPA's responses.","document_number":"2026-06002","html_url":"https://www.federalregister.gov/documents/2026/03/27/2026-06002/2028-resource-pool-parker-davis-project-final-power-allocations","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2026-03-27/pdf/2026-06002.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2026-06002.pdf?1774529115","publication_date":"2026-03-27","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Western Area Power Administration","name":"Western Area Power Administration","id":525,"url":"https://www.federalregister.gov/agencies/western-area-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/525","parent_id":136,"slug":"western-area-power-administration"}],"excerpts":"Western Area Power Administration (WAPA), a Federal Power Marketing Administration of the Department of Energy (DOE), announces its Parker-Davis Project (P-DP) final 2028 resource pool power allocations, developed under the requirements of the Final..."},{"title":"Collections From Central Valley Project Power Contractors To Carry Out the Restoration, Improvement and Acquisition of Environmental Habitat Provisions of the Central Valley Project Improvement Act of 1992","type":"Notice","abstract":"The collection procedures for the Sierra Nevada (SN) region have been confirmed, approved, and placed into effect. These collection procedures supersede those previously published in the Federal Register on April 16, 2003. The collection procedures remain unchanged but are being republished, for administrative purposes, to remove references to a specific Western Area Power Administration (WAPA) SN Power Marketing Plan (PMP).","document_number":"2026-03388","html_url":"https://www.federalregister.gov/documents/2026/02/20/2026-03388/collections-from-central-valley-project-power-contractors-to-carry-out-the-restoration-improvement","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2026-02-20/pdf/2026-03388.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2026-03388.pdf?1771508716","publication_date":"2026-02-20","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Western Area Power Administration","name":"Western Area Power Administration","id":525,"url":"https://www.federalregister.gov/agencies/western-area-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/525","parent_id":136,"slug":"western-area-power-administration"}],"excerpts":"The collection procedures for the Sierra Nevada (SN) region have been confirmed, approved, and placed into effect. These collection procedures supersede those previously published in the Federal Register on April 16, 2003. The collection procedures..."},{"title":"Desert Southwest Region and Western Area Lower Colorado Balancing Authority-Rate Order No. WAPA-222","type":"Notice","abstract":"The Desert Southwest Region (DSW) of the Western Area Power Administration (WAPA) proposes extending, without any changes, the existing balancing authority area and transmission provider services formula rates for Western Area Lower Colorado Balancing Authority (WALC) through September 30, 2031. The existing formula rates under Rate Schedules DSW-SD4 (Scheduling, System Control, and Dispatch), DSW- RS4 (Reactive Supply and Voltage Control), DSW-FR4 (Regulation and Frequency Response), DSW-SPR4 (Spinning Reserve), DSW-SUR4 (Supplemental Reserves), DSW-EI4 (Energy Imbalance), DSW-GI2 (Generator Imbalance), DSW-TL1 (Transmission Losses), DSW-UUI (Unreserved Use Penalties), DSW-EIM1T (Administrative Service), DSW-EIM4T (Energy Imbalance Service), and DSW-EIM9T (Generator Imbalance Service) expire on September 30, 2026.","document_number":"2026-01330","html_url":"https://www.federalregister.gov/documents/2026/01/26/2026-01330/desert-southwest-region-and-western-area-lower-colorado-balancing-authority-rate-order-no-wapa-222","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2026-01-26/pdf/2026-01330.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2026-01330.pdf?1769175909","publication_date":"2026-01-26","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Western Area Power Administration","name":"Western Area Power Administration","id":525,"url":"https://www.federalregister.gov/agencies/western-area-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/525","parent_id":136,"slug":"western-area-power-administration"}],"excerpts":"The Desert Southwest Region (DSW) of the Western Area Power Administration (WAPA) proposes extending, without any changes, the existing balancing authority area and transmission provider services formula rates for Western Area Lower Colorado Balancing..."},{"title":"Pacific Alternating Current Intertie Point-to-Point Transmission Service-Rate Order No. WAPA-211","type":"Notice","abstract":"The formula rates for the Sierra Nevada (SN) region Pacific Alternating Current Intertie (PACI) point-to-point transmission service have been confirmed, approved, and placed into effect on an interim basis (Provisional Formula Rates). These new formula rates supersede rates for short-term sales on the PACI, PACI-T4 REV, PACI-T5 REV and PACI DLAP-T6 (approved under Delegation Order No. S3-DEL-WAPA1-2023, Section 1.4.B). There are no changes from the existing formula rates for these services, and there are no material changes aside from updating the effective dates.","document_number":"2026-01329","html_url":"https://www.federalregister.gov/documents/2026/01/26/2026-01329/pacific-alternating-current-intertie-point-to-point-transmission-service-rate-order-no-wapa-211","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2026-01-26/pdf/2026-01329.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2026-01329.pdf?1769175909","publication_date":"2026-01-26","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Western Area Power Administration","name":"Western Area Power Administration","id":525,"url":"https://www.federalregister.gov/agencies/western-area-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/525","parent_id":136,"slug":"western-area-power-administration"}],"excerpts":"The formula rates for the Sierra Nevada (SN) region Pacific Alternating Current Intertie (PACI) point-to-point transmission service have been confirmed, approved, and placed into effect on an interim basis (Provisional Formula Rates). These new formula..."},{"title":"Boulder Canyon Project","type":"Notice","abstract":"The Deputy Secretary confirms, approves, and places into effect on a final basis the Western Area Power Administration (WAPA) Desert Southwest Region's (DSW) fiscal year (FY) 2026 base charge and rates for Boulder Canyon Project (BCP) electric service under Rate Schedule BCP-F11. The base charge is increasing 2.5 percent, from $74.3 million in FY 2025 to $76.2 million in FY 2026. This change is primarily due to a decrease in anticipated prior year carryover funds from FY 2025.","document_number":"2025-20296","html_url":"https://www.federalregister.gov/documents/2025/11/19/2025-20296/boulder-canyon-project","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-11-19/pdf/2025-20296.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-20296.pdf?1763473514","publication_date":"2025-11-19","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Western Area Power Administration","name":"Western Area Power Administration","id":525,"url":"https://www.federalregister.gov/agencies/western-area-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/525","parent_id":136,"slug":"western-area-power-administration"}],"excerpts":"The Deputy Secretary confirms, approves, and places into effect on a final basis the Western Area Power Administration (WAPA) Desert Southwest Region's (DSW) fiscal year (FY) 2026 base charge and rates for Boulder Canyon Project (BCP) electric service..."},{"title":"2028 Resource Pool-Parker-Davis Project, Proposed Power Allocations","type":"Notice","abstract":"Western Area Power Administration (WAPA), a Federal Power Marketing Administration of the Department of Energy (DOE), announces its Parker-Davis Project (P-DP) proposed 2028 resource pool power allocations. WAPA developed the proposed power allocations under its Final 2028 P-DP Power Marketing Plan and Call for 2028 Resource Pool Applications (Final 2028 Plan), published in the Federal Register on November 12, 2024. Applications received by the January 31, 2025, deadline were considered for a proposed resource pool power allocation. This notice provides a list of the allottees and seeks comments from the public on the proposed resource pool allocations.","document_number":"2025-16885","html_url":"https://www.federalregister.gov/documents/2025/09/03/2025-16885/2028-resource-pool-parker-davis-project-proposed-power-allocations","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-09-03/pdf/2025-16885.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-16885.pdf?1756817117","publication_date":"2025-09-03","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Western Area Power Administration","name":"Western Area Power Administration","id":525,"url":"https://www.federalregister.gov/agencies/western-area-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/525","parent_id":136,"slug":"western-area-power-administration"}],"excerpts":"Western Area Power Administration (WAPA), a Federal Power Marketing Administration of the Department of Energy (DOE), announces its Parker-Davis Project (P-DP) proposed 2028 resource pool power allocations. WAPA developed the proposed power allocations..."},{"title":"Proposed Collections From Central Valley Project Power Contractors To Carry Out the Restoration, Improvement and Acquisition of Environmental Habitat Provisions of the Central Valley Project Improvement Act of 1992","type":"Notice","abstract":"The Sierra Nevada (SN) region of the Western Area Power Administration (WAPA) proposes unchanged procedures for the Collection of Restoration Fund payments from the Central Valley Project (CVP) Power Contractors. These collection procedures supersede those previously published in the Federal Register on April 16, 2003 (68 FR 18621). The collection procedures remain unchanged but are being republished, for administrative purposes, to remove references to a specific WAPA-SN Power Marketing Plan (PMP).","document_number":"2025-15235","html_url":"https://www.federalregister.gov/documents/2025/08/12/2025-15235/proposed-collections-from-central-valley-project-power-contractors-to-carry-out-the-restoration","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-08-12/pdf/2025-15235.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-15235.pdf?1754916308","publication_date":"2025-08-12","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Western Area Power Administration","name":"Western Area Power Administration","id":525,"url":"https://www.federalregister.gov/agencies/western-area-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/525","parent_id":136,"slug":"western-area-power-administration"}],"excerpts":"The Sierra Nevada (SN) region of the Western Area Power Administration (WAPA) proposes unchanged procedures for the Collection of Restoration Fund payments from the Central Valley Project (CVP) Power Contractors. These collection procedures supersede..."},{"title":"Colorado River Storage Project-Rate Order No. WAPA-220","type":"Notice","abstract":"The formula rates for the Colorado River Storage Project (CRSP) region's transmission and ancillary services for CRSP's costs to be recovered under the Southwest Power Pool's (SPP) Open Access Transmission Tariff (Tariff) should CRSP decide to become a member of SPP, have been confirmed, approved, and placed into effect on an interim basis (Provisional Formula Rate). If CRSP decides to become a member of SPP, these new formula rates under Rate Schedules CRCMT-ATRR (transmission), CRCMT-AS1 (scheduling, system control, and dispatch), and CRCMT-PTP (firm point-to-point) will supersede the existing formula rates for transmission and ancillary services under Rate Schedules SP- NW6, SP-PTP10, SP-NFT9, SP-NFJDT, SP-UU3, SP-EI6, and SP-SSR6, which expire on December 31, 2028.","document_number":"2025-12994","html_url":"https://www.federalregister.gov/documents/2025/07/11/2025-12994/colorado-river-storage-project-rate-order-no-wapa-220","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-07-11/pdf/2025-12994.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-12994.pdf?1752151517","publication_date":"2025-07-11","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Western Area Power Administration","name":"Western Area Power Administration","id":525,"url":"https://www.federalregister.gov/agencies/western-area-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/525","parent_id":136,"slug":"western-area-power-administration"}],"excerpts":"The formula rates for the Colorado River Storage Project (CRSP) region's transmission and ancillary services for CRSP's costs to be recovered under the Southwest Power Pool's (SPP) Open Access Transmission Tariff (Tariff) should CRSP decide to become a..."},{"title":"Loveland Area Projects-Rate Order No. WAPA-219","type":"Notice","abstract":"The formula rates for the Rocky Mountain region's (RMR) Loveland Area Projects (LAP) transmission and ancillary services for RMR's costs to be recovered under the Southwest Power Pool's (SPP) Open Access Transmission Tariff (Tariff) should RMR decide to become a member of SPP, have been confirmed, approved, and placed into effect on an interim basis (Provisional Formula Rates). If RMR decides to become a member of SPP, these new formula rates under Rate Schedules LAPT-ATRR (transmission), LAPT-DCTIE-IMEU (incremental market efficiency use share), and LAPT-AS1 (scheduling, system control, and dispatch) will supersede the existing formula rates for transmission and ancillary services under Rate Schedules L-NT1, L-FPT1, L-NFPT1, L-NFJDT, L-UU1, L-AS1, L-AS2, L-AS3, L-AS4, L-AS5, L-AS6, L-AS7, and L-AS9, which expire on September 30, 2026.","document_number":"2025-12992","html_url":"https://www.federalregister.gov/documents/2025/07/11/2025-12992/loveland-area-projects-rate-order-no-wapa-219","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-07-11/pdf/2025-12992.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-12992.pdf?1752151517","publication_date":"2025-07-11","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Western Area Power Administration","name":"Western Area Power Administration","id":525,"url":"https://www.federalregister.gov/agencies/western-area-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/525","parent_id":136,"slug":"western-area-power-administration"}],"excerpts":"The formula rates for the Rocky Mountain region's (RMR) Loveland Area Projects (LAP) transmission and ancillary services for RMR's costs to be recovered under the Southwest Power Pool's (SPP) Open Access Transmission Tariff (Tariff) should RMR decide..."},{"title":"Pick-Sloan Missouri Basin Program-Eastern Division-Rate Order No. WAPA-218","type":"Notice","abstract":"The formula rates for the Upper Great Plains region's (UGP) Pick-Sloan Missouri Basin Program--Eastern Division (P-SMBP--ED) transmission and ancillary services for UGP's costs to be recovered under the Southwest Power Pool's (SPP) Open Access Transmission Tariff (Tariff) should UGP decide to expand its participation in SPP in the Western Interconnection, have been confirmed, approved, and placed into effect on an interim basis (Provisional Formula Rates). If UGP expands its participation in SPP, these new formula rates under Rate Schedules WAUGP-ATRR (transmission), WAUGP-DCTIE-IMEU (incremental market efficiency use share), and WAUGP-AS1 (scheduling, system control and dispatch) will supersede the extended formula rates for transmission and ancillary services under Rate Schedules WAUGP-ATRR, WAUGP-AS1, WAUW-AS3, WAUW-AS4, WAUW-AS5, WAUW-AS6, and WAUW-AS7, which expire on September 30, 2030.","document_number":"2025-12990","html_url":"https://www.federalregister.gov/documents/2025/07/11/2025-12990/pick-sloan-missouri-basin-program-eastern-division-rate-order-no-wapa-218","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-07-11/pdf/2025-12990.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-12990.pdf?1752151517","publication_date":"2025-07-11","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Western Area Power Administration","name":"Western Area Power Administration","id":525,"url":"https://www.federalregister.gov/agencies/western-area-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/525","parent_id":136,"slug":"western-area-power-administration"}],"excerpts":"The formula rates for the Upper Great Plains region's (UGP) Pick-Sloan Missouri Basin Program--Eastern Division (P-SMBP--ED) transmission and ancillary services for UGP's costs to be recovered under the Southwest Power Pool's (SPP) Open Access..."},{"title":"Boulder Canyon Project","type":"Notice","abstract":"The Desert Southwest region (DSW) of the Western Area Power Administration (WAPA) proposes an adjustment to the fiscal year (FY) 2026 base charge and rates for Boulder Canyon Project (BCP) electric service under Rate Schedule BCP-F11. The proposal would increase the base charge 7.9 percent, from $74.3 million in FY 2025 to $80.2 million in FY 2026. The change is due primarily to an increase in the Bureau of Reclamation's (Reclamation) operations and maintenance (O&M) expenses and a decrease in anticipated prior year carryover funds from FY 2025. The proposed base charge and rates would go into effect on October 1, 2025, and remain in effect through September 30, 2026. Publication of this Federal Register notice will initiate the public process.","document_number":"2025-07270","html_url":"https://www.federalregister.gov/documents/2025/04/28/2025-07270/boulder-canyon-project","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-04-28/pdf/2025-07270.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-07270.pdf?1745585118","publication_date":"2025-04-28","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Western Area Power Administration","name":"Western Area Power Administration","id":525,"url":"https://www.federalregister.gov/agencies/western-area-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/525","parent_id":136,"slug":"western-area-power-administration"}],"excerpts":"The Desert Southwest region (DSW) of the Western Area Power Administration (WAPA) proposes an adjustment to the fiscal year (FY) 2026 base charge and rates for Boulder Canyon Project (BCP) electric service under Rate Schedule BCP-F11. The proposal..."},{"title":"Sierra Nevada Region Pacific Alternating Current Intertie Point-to-Point Transmission Service-Rate Order No. WAPA-211","type":"Notice","abstract":"The Sierra Nevada Region (SN) of the Western Area Power Administration (WAPA) proposes new long-term formula rates to become effective October 1, 2025, through September 30, 2030 for Pacific Alternating Current Intertie (PACI) Point-to-Point (PTP) transmission services. SN is proposing a cost-based formula rate for Statutory Service and two new equitable formula rates for sale of surplus capacity for non-Statutory Service. SN also proposes to supersede certain formula rates for short-term sales on the PACI, PACI-T4 and PACI-T5, (approved under Delegation Order No. S3-DEL-WAPA1-2023, Section 1.4.B) with these proposed long-term formula rates.","document_number":"2025-06951","html_url":"https://www.federalregister.gov/documents/2025/04/23/2025-06951/sierra-nevada-region-pacific-alternating-current-intertie-point-to-point-transmission-service-rate","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-04-23/pdf/2025-06951.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-06951.pdf?1745325914","publication_date":"2025-04-23","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Western Area Power Administration","name":"Western Area Power Administration","id":525,"url":"https://www.federalregister.gov/agencies/western-area-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/525","parent_id":136,"slug":"western-area-power-administration"}],"excerpts":"The Sierra Nevada Region (SN) of the Western Area Power Administration (WAPA) proposes new long-term formula rates to become effective October 1, 2025, through September 30, 2030 for Pacific Alternating Current Intertie (PACI) Point-to-Point (PTP)..."},{"title":"Provo River Project-Rate Order No. WAPA-221","type":"Notice","abstract":"The formula rate for the Colorado River Storage Project Management Center's (CRSP MC) Provo River Project electric service has been confirmed, approved, and placed into effect on an interim basis (Provisional Formula Rate). The new formula rate under Rate Schedule PR-3 replaces the existing formula rate for these services, under Rate Schedule PR-2, which expires on March 31, 2025, and makes no changes to the existing formula rate other than updating associated contract references.","document_number":"2025-02626","html_url":"https://www.federalregister.gov/documents/2025/02/14/2025-02626/provo-river-project-rate-order-no-wapa-221","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-02-14/pdf/2025-02626.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-02626.pdf?1739454309","publication_date":"2025-02-14","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Western Area Power Administration","name":"Western Area Power Administration","id":525,"url":"https://www.federalregister.gov/agencies/western-area-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/525","parent_id":136,"slug":"western-area-power-administration"}],"excerpts":"The formula rate for the Colorado River Storage Project Management Center's (CRSP MC) Provo River Project electric service has been confirmed, approved, and placed into effect on an interim basis (Provisional Formula Rate). The new formula rate under..."},{"title":"Colorado River Storage Project-Rate Order No. WAPA-220","type":"Notice","abstract":"The Colorado River Storage Project (CRSP) Management Center (MC) of the Western Area Power Administration (WAPA) proposes new formula rates for CRSP transmission and ancillary services for CRSP MC's costs to be recovered under the Southwest Power Pool's (SPP) Open Access Transmission Tariff (Tariff) should CRSP MC decide to become a member of SPP. The proposed formula rates will become effective on the latter of CRSP MC's membership date or the go-live date of the expansion of the SPP Regional Transmission Organization (RTO) into the Western Interconnection (scheduled for April 1, 2026, as of the date of this notice) and will remain in effect for 5 years from the effective date, which with an effective date of April 1, 2026, will be March 31, 2031, or until superseded.","document_number":"2024-30863","html_url":"https://www.federalregister.gov/documents/2024/12/30/2024-30863/colorado-river-storage-project-rate-order-no-wapa-220","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2024-12-30/pdf/2024-30863.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2024-30863.pdf?1735307124","publication_date":"2024-12-30","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Western Area Power Administration","name":"Western Area Power Administration","id":525,"url":"https://www.federalregister.gov/agencies/western-area-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/525","parent_id":136,"slug":"western-area-power-administration"}],"excerpts":"The Colorado River Storage Project (CRSP) Management Center (MC) of the Western Area Power Administration (WAPA) proposes new formula rates for CRSP transmission and ancillary services for CRSP MC's costs to be recovered under the Southwest Power..."},{"title":"Pick-Sloan Missouri Basin Program-Eastern Division-Rate Order No. WAPA-218","type":"Notice","abstract":"The Upper Great Plains (UGP) region of the Western Area Power Administration (WAPA) proposes new formula rates for the Pick-Sloan Missouri Basin Program--Eastern Division (P-SMBP--ED) transmission and ancillary services for UGP's costs to be recovered under the Southwest Power Pool's (SPP) Open Access Transmission Tariff (Tariff) should UGP decide to expand its participation in SPP in the Western Interconnection. These rates will be used by UGP to provide rate data to SPP, the Regional Transmission Organization (RTO) of which UGP is a member, after SPP's planned expansion of the RTO into the Western Interconnection on April 1, 2026. The existing UGP rates for services expire on September 30, 2025, but are being extended under a separate rate process, Rate Order No, WAPA-217, to continue to provide existing rate data to SPP between October 1, 2025, and final implementation date of the planned RTO expansion into the Western Interconnection. The proposed rates will address UGP operating changes and new provisions and settlement requirements under the proposed revisions to SPP's Tariff filed with the Federal Energy Regulatory Commission (FERC) to accommodate their RTO expansion into the Western Interconnection. The proposed formula rates will become effective on the go-live date of the expansion of the SPP RTO into the Western Interconnection (scheduled for April 1, 2026, as of the date of this notice) and will remain in effect for five years from the effective date, which with an effective date of April 1, 2026, will be March 31, 2031, or until superseded.","document_number":"2024-30858","html_url":"https://www.federalregister.gov/documents/2024/12/30/2024-30858/pick-sloan-missouri-basin-program-eastern-division-rate-order-no-wapa-218","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2024-12-30/pdf/2024-30858.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2024-30858.pdf?1735307124","publication_date":"2024-12-30","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Western Area Power Administration","name":"Western Area Power Administration","id":525,"url":"https://www.federalregister.gov/agencies/western-area-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/525","parent_id":136,"slug":"western-area-power-administration"}],"excerpts":"The Upper Great Plains (UGP) region of the Western Area Power Administration (WAPA) proposes new formula rates for the Pick-Sloan Missouri Basin Program--Eastern Division (P-SMBP--ED) transmission and ancillary services for UGP's costs to be recovered..."},{"title":"Loveland Area Projects-Rate Order No. WAPA-219","type":"Notice","abstract":"The Rocky Mountain (RM) region of the Western Area Power Administration (WAPA) proposes new formula rates for the Loveland Area Projects (LAP) transmission and ancillary services for RM's costs to be recovered under the Southwest Power Pool's (SPP) Open Access Transmission Tariff (Tariff) should RM decide to become a member of SPP. The proposed formula rates will become effective on the latter of RM's membership date or the go-live date of the expansion of the SPP Regional Transmission Organization (RTO) into the Western Interconnection (scheduled for April 1, 2026, as of the date of this notice) and will remain in effect for five years from the effective date, which with an effective date of April 1, 2026, will be March 31, 2031, or until superseded.","document_number":"2024-30862","html_url":"https://www.federalregister.gov/documents/2024/12/27/2024-30862/loveland-area-projects-rate-order-no-wapa-219","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2024-12-27/pdf/2024-30862.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2024-30862.pdf?1735220725","publication_date":"2024-12-27","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Western Area Power Administration","name":"Western Area Power Administration","id":525,"url":"https://www.federalregister.gov/agencies/western-area-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/525","parent_id":136,"slug":"western-area-power-administration"}],"excerpts":"The Rocky Mountain (RM) region of the Western Area Power Administration (WAPA) proposes new formula rates for the Loveland Area Projects (LAP) transmission and ancillary services for RM's costs to be recovered under the Southwest Power Pool's (SPP)..."},{"title":"Pick-Sloan Missouri Basin Program-Eastern Division-Rate Order No. WAPA-217","type":"Notice","abstract":"The extension of the Upper Great Plains (UGP) region's existing Pick-Sloan Missouri Basin Program--Eastern Division (P-SMBP-- ED) transmission and ancillary services formula rates has been confirmed, approved, and placed into effect on an interim basis. The existing formula rates under Rate Schedules WAUGP-ATRR (Annual Transmission Revenue Requirement), WAUGP-AS1 (Scheduling, System Control, and Dispatch Service), WAUW-AS3 (Regulation and Frequency Response Service), WAUW- AS4 (Energy Imbalance Service), WAUW-AS5 (Operating Reserve--Spinning Reserve Service), WAUW-AS6 (Operating Reserve--Supplemental Reserve Service), and WAUW-AS7 (Generator Imbalance Service) are set to expire on September 30, 2025. This rate extension makes no changes to the existing formula rates and extends them through September 30, 2030.","document_number":"2024-30361","html_url":"https://www.federalregister.gov/documents/2024/12/20/2024-30361/pick-sloan-missouri-basin-program-eastern-division-rate-order-no-wapa-217","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2024-12-20/pdf/2024-30361.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2024-30361.pdf?1734615920","publication_date":"2024-12-20","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Western Area Power Administration","name":"Western Area Power Administration","id":525,"url":"https://www.federalregister.gov/agencies/western-area-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/525","parent_id":136,"slug":"western-area-power-administration"}],"excerpts":"The extension of the Upper Great Plains (UGP) region's existing Pick-Sloan Missouri Basin Program--Eastern Division (P-SMBP-- ED) transmission and ancillary services formula rates has been confirmed, approved, and placed into effect on an interim..."},{"title":"Pick-Sloan Missouri Basin Program-Eastern Division-Rate Order No. WAPA-213","type":"Notice","abstract":"The formula rates for the Upper Great Plains (UGP) region's Pick-Sloan Missouri Basin Program (P-SMBP)--Eastern Division (ED) firm power service, firm peaking power service, and sale of surplus products have been confirmed, approved, and placed into effect on an interim basis (Provisional Formula Rates). These new formula rates replace the existing formula rates for these services under Rate Schedules P-SED- F14, Firm Power Service; P-SED-FP14, Firm Peaking Power Service; and P- SED-M2, Sale of Surplus Products, which expire on December 31, 2027. The P-SMBP--ED firm power service composite rate is increasing over a 2-year period with a 7.5 percent increase on January 1, 2025, and an additional 6.2 percent increase on January 1, 2026. There are no changes to the formula rate for sale of surplus products.","document_number":"2024-26933","html_url":"https://www.federalregister.gov/documents/2024/11/20/2024-26933/pick-sloan-missouri-basin-program-eastern-division-rate-order-no-wapa-213","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2024-11-20/pdf/2024-26933.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2024-26933.pdf?1732023918","publication_date":"2024-11-20","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Western Area Power Administration","name":"Western Area Power Administration","id":525,"url":"https://www.federalregister.gov/agencies/western-area-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/525","parent_id":136,"slug":"western-area-power-administration"}],"excerpts":"The formula rates for the Upper Great Plains (UGP) region's Pick-Sloan Missouri Basin Program (P-SMBP)--Eastern Division (ED) firm power service, firm peaking power service, and sale of surplus products have been confirmed, approved, and placed into..."}]}