{"description":"Documents matching 'DeepGreen'","count":1,"total_pages":1,"results":[{"title":"DeepGreen Western Passage SPV LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications","type":"Notice","abstract":null,"document_number":"2026-17254","html_url":"https://www.federalregister.gov/documents/2026/08/25/2026-17254/deepgreen-western-passage-spv-llc-notice-of-preliminary-permit-application-accepted-for-filing-and","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2026-08-25/pdf/2026-17254.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2026-17254.pdf?1787575514","publication_date":"2026-08-25","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Federal Energy Regulatory Commission","name":"Federal Energy Regulatory Commission","id":167,"url":"https://www.federalregister.gov/agencies/federal-energy-regulatory-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/167","parent_id":136,"slug":"federal-energy-regulatory-commission"}],"excerpts":"On February 11, 2026, and supplemented and amended on June 8, 2026 and July 30, 2026, <span class=\"match\">DeepGreen</span> Western Passage SPV LLC, filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the <span class=\"match\">DeepGreen</span> Western Passage Subsea-Compute &amp; Infrastructure Hub Project No. 15424-000 (project), to be located in the Western Passage of the Bay of Fundy in the North Atlantic Ocean near the Town of Eastport, Washington County, Maine. The sole purpose of a preliminary permit, if issued"}]}