{"description":"Documents matching 'compliance months'","count":10000,"total_pages":50,"next_page_url":"https://www.federalregister.gov/api/v1/documents?conditions%5Bterm%5D=compliance+months&format=json&page=2","results":[{"title":"Requirements for Additional Traceability Records for Certain Foods: Compliance Date Extension","type":"Proposed Rule","abstract":"The Food and Drug Administration is proposing to extend the compliance date for the final rule, \"Requirements for Additional Traceability Records for Certain Foods,\" due to concerns about the amount of time affected entities will need to implement the requirements of the rule. If finalized, this rule would extend the compliance date by 30 months from January 20, 2026, to July 20, 2028.","document_number":"2025-14967","html_url":"https://www.federalregister.gov/documents/2025/08/07/2025-14967/requirements-for-additional-traceability-records-for-certain-foods-compliance-date-extension","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-08-07/pdf/2025-14967.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-14967.pdf?1754484340","publication_date":"2025-08-07","agencies":[{"raw_name":"DEPARTMENT OF HEALTH AND HUMAN SERVICES","name":"Health and Human Services Department","id":221,"url":"https://www.federalregister.gov/agencies/health-and-human-services-department","json_url":"https://www.federalregister.gov/api/v1/agencies/221","parent_id":null,"slug":"health-and-human-services-department"},{"raw_name":"Food and Drug Administration","name":"Food and Drug Administration","id":199,"url":"https://www.federalregister.gov/agencies/food-and-drug-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/199","parent_id":221,"slug":"food-and-drug-administration"}],"excerpts":"finalized as proposed, is expected to be an Executive Order 14192 deregulatory action. \n B. Proposed <span class=\"match\">Compliance</span> Date \n The current <span class=\"match\">compliance</span> date for the Food Traceability Rule is January 20, 2026. FDA is proposing to extend the <span class=\"match\">compliance</span> date deadline by 30 <span class=\"match\">months</span> to July 20, 2028. This proposed rule is limited in scope to the Food Traceability Rule <span class=\"match\">compliance</span> date; therefore, comments should address the proposed <span class=\"match\">compliance</span> date extension. This <span class=\"match\">compliance</span> date extension does not amend, nor do we intend to amend, the requirements of the final rule, which"},{"title":"Methylene Chloride; Regulation Under the Toxic Substances Control Act (TSCA); Compliance Date Extension","type":"Rule","abstract":"The Environmental Protection Agency (EPA or Agency) is finalizing an extension to the compliance dates applicable to certain entities subject to the regulation of methylene chloride promulgated under the Toxic Substances Control Act (TSCA). Specifically, EPA is finalizing an 18-month extension of the Workplace Chemical Protection Program (WCPP) and associated recordkeeping compliance dates for industrial or commercial laboratories that are not owned or operated by Federal agencies or contractors acting on behalf of the Federal government. Under this final rule, all non-Federal laboratories will share the same compliance dates with Federal and Federally contracted laboratories. EPA is finalizing an extension of the compliance dates for associated laboratory activities detailed in this final rule to avoid disruption of important functions of non-Federal laboratories such as the use of environmental monitoring methods needed for cleanup sites and wastewater treatment, as well as activities associated with university laboratories or law enforcement laboratories.","document_number":"2025-19881","html_url":"https://www.federalregister.gov/documents/2025/11/13/2025-19881/methylene-chloride-regulation-under-the-toxic-substances-control-act-tsca-compliance-date-extension","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-11-13/pdf/2025-19881.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-19881.pdf?1762955113","publication_date":"2025-11-13","agencies":[{"raw_name":"ENVIRONMENTAL PROTECTION AGENCY","name":"Environmental Protection Agency","id":145,"url":"https://www.federalregister.gov/agencies/environmental-protection-agency","json_url":"https://www.federalregister.gov/api/v1/agencies/145","parent_id":null,"slug":"environmental-protection-agency"}],"excerpts":"additional 18 <span class=\"match\">months</span>. This amendment aligns the <span class=\"match\">compliance</span> dates for non-Federally owned or operated industrial or commercial laboratories with the <span class=\"match\">compliance</span> dates established in the 2024 risk management rule for Federal agencies and their contractors (Ref. 2). Specifically, this final rule extends three <span class=\"match\">compliance</span> dates for non-Federally owned or operated industrial or commercial laboratories. For initial monitoring, the <span class=\"match\">compliance</span> date is extended from May 5, 2025, to November 9, 2026. For establishing regulated areas and ensuring <span class=\"match\">compliance</span> with the"},{"title":"Extension of Compliance Dates for Electronic Submission of Certain Materials Under the Securities Exchange Act of 1934; Amendments Regarding the FOCUS Report","type":"Rule","abstract":"The Securities and Exchange Commission (\"Commission\") is extending by twelve months the compliance dates for certain of the rule amendments the Commission adopted on December 16, 2024, regarding the electronic submission of certain materials under the Securities Exchange Act of 1934 (\"Exchange Act\") and amendments to the FOCUS Report (Form X-17A-5), a periodic financial and operational report filed by broker-dealers and security-based swap dealers.","document_number":"2025-17402","html_url":"https://www.federalregister.gov/documents/2025/09/10/2025-17402/extension-of-compliance-dates-for-electronic-submission-of-certain-materials-under-the-securities","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-09-10/pdf/2025-17402.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-17402.pdf?1757421916","publication_date":"2025-09-10","agencies":[{"raw_name":"SECURITIES AND EXCHANGE COMMISSION","name":"Securities and Exchange Commission","id":466,"url":"https://www.federalregister.gov/agencies/securities-and-exchange-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/466","parent_id":null,"slug":"securities-and-exchange-commission"}],"excerpts":"The Commission is extending the <span class=\"match\">compliance</span> date for the Twelve <span class=\"match\">Month</span> Rules by twelve <span class=\"match\">months</span>, to help facilitate an orderly <span class=\"match\">compliance</span> with the Twelve <span class=\"match\">Month</span> Rules. This extension will give firms additional time to update, test, and develop technological infrastructure needed to comply with structured data requirements, and to develop policies and procedures that help ensure <span class=\"match\">compliance</span> in relation to the filing or submission requirements (including through engagement with the Commission and Commission staff on <span class=\"match\">compliance</span> and operational challenges)."},{"title":"Extension of Compliance Date for Required Daily Computation of Customer and Broker-Dealer Reserve Requirements Under the Broker-Dealer Customer Protection Rule","type":"Rule","abstract":"The Securities and Exchange Commission (\"Commission\") is extending the compliance date for the recently adopted amendments that require certain broker-dealers to perform daily reserve computations and make required deposits into their reserve bank accounts daily rather than weekly by six months from December 31, 2025, to June 30, 2026.","document_number":"2025-12016","html_url":"https://www.federalregister.gov/documents/2025/07/01/2025-12016/extension-of-compliance-date-for-required-daily-computation-of-customer-and-broker-dealer-reserve","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-07-01/pdf/2025-12016.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-12016.pdf?1751287520","publication_date":"2025-07-01","agencies":[{"raw_name":"SECURITIES AND EXCHANGE COMMISSION","name":"Securities and Exchange Commission","id":466,"url":"https://www.federalregister.gov/agencies/securities-and-exchange-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/466","parent_id":null,"slug":"securities-and-exchange-commission"}],"excerpts":"ACTION: \n Final rule; extension of <span class=\"match\">compliance</span> date. \n \n \n SUMMARY: \n The Securities and Exchange Commission (“Commission”) is extending the <span class=\"match\">compliance</span> date for the recently adopted amendments that require certain broker-dealers to perform daily reserve computations and make required deposits into their reserve bank accounts daily rather than weekly by six <span class=\"match\">months</span> from December 31, 2025, to June 30, 2026. \n \n \n DATES: \n \n As of July 1, 2025, the <span class=\"match\">compliance</span> date for Rule 15c3-3(e)(3)(i)(B)(\n 1 \n ), published January 13, 2025, at 90 FR 2837, is extended"},{"title":"Wagner-Peyser Act Staffing, Delay of Merit Staffing Compliance Date","type":"Rule","abstract":"The Department of Labor's (Department's) Employment and Training Administration (ETA) is delaying by 1 year the date by which State grantees, as a condition on their grant funds, must comply with the regulatory requirements in the 2023 Wagner-Peyser Act Staffing Final Rule regarding the grant-funded staffing models States must use to deliver services in the Wagner-Peyser Act Employment Service (ES). The 2023 Final Rule became effective on January 23, 2024, and provided that all States have until January 22, 2026, 24 months after the effective date of the rule, to comply with the staffing requirements. With this 1-year delay, the compliance date is now January 21, 2027.","document_number":"2026-01117","html_url":"https://www.federalregister.gov/documents/2026/01/21/2026-01117/wagner-peyser-act-staffing-delay-of-merit-staffing-compliance-date","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2026-01-21/pdf/2026-01117.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2026-01117.pdf?1768916721","publication_date":"2026-01-21","agencies":[{"raw_name":"DEPARTMENT OF LABOR","name":"Labor Department","id":271,"url":"https://www.federalregister.gov/agencies/labor-department","json_url":"https://www.federalregister.gov/api/v1/agencies/271","parent_id":null,"slug":"labor-department"},{"raw_name":"Employment and Training Administration","name":"Employment and Training Administration","id":133,"url":"https://www.federalregister.gov/agencies/employment-and-training-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/133","parent_id":271,"slug":"employment-and-training-administration"}],"excerpts":"models States must use to deliver services in the Wagner-Peyser Act Employment Service (ES). The 2023 Final Rule became effective on January 23, 2024, and provided that all States have until January 22, 2026, 24 <span class=\"match\">months</span> after the effective date of the rule, to comply with the staffing requirements. With this 1-year delay, the <span class=\"match\">compliance</span> date is now January 21, 2027. \n \n \n DATES: \n This final rule is effective on January 21, 2026. \n \n \n FOR FURTHER INFORMATION CONTACT: \n Kimberly Vitelli, Administrator, Office of Workforce Investment, U.S. Department"},{"title":"Definition of the Term “Coverage Month” for Computing the Premium Tax Credit","type":"Rule","abstract":"This document contains final regulations that amend the definition of \"coverage month\" and amend certain other rules in existing income tax regulations regarding the computation of an individual taxpayer's premium tax credit. The coverage month amendment generally provides that, in computing a premium tax credit, a month may be a coverage month for an individual if the amount of the premium paid, including by advance payments of the premium tax credit, for the month for the individual's coverage is sufficient to avoid termination of the individual's coverage for that month. The final regulations also amend the existing regulations relating to the amount of enrollment premiums used in computing the taxpayer's monthly premium tax credit if a portion of the monthly enrollment premium for a coverage month is unpaid. Finally, the final regulations clarify when an individual is considered to be not eligible for coverage under a State's Basic Health Program. The final regulations affect taxpayers who enroll themselves, or enroll a family member, in individual health insurance coverage through a Health Insurance Exchange and may be allowed a premium tax credit for the coverage.","document_number":"2024-29651","html_url":"https://www.federalregister.gov/documents/2024/12/18/2024-29651/definition-of-the-term-coverage-month-for-computing-the-premium-tax-credit","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2024-12-18/pdf/2024-29651.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2024-29651.pdf?1734443143","publication_date":"2024-12-18","agencies":[{"raw_name":"DEPARTMENT OF THE TREASURY","name":"Treasury Department","id":497,"url":"https://www.federalregister.gov/agencies/treasury-department","json_url":"https://www.federalregister.gov/api/v1/agencies/497","parent_id":null,"slug":"treasury-department"},{"raw_name":"Internal Revenue Service","name":"Internal Revenue Service","id":254,"url":"https://www.federalregister.gov/agencies/internal-revenue-service","json_url":"https://www.federalregister.gov/api/v1/agencies/254","parent_id":497,"slug":"internal-revenue-service"}],"excerpts":"report non-payment <span class=\"match\">months</span> as coverage <span class=\"match\">months</span> under one of the three scenarios described in § 1.36B-3(c)(4). \n III. Additional Scenarios for Which Non-Payment <span class=\"match\">Months</span> May Be Coverage <span class=\"match\">Months</span> \n The proposed regulations included a request for comments on whether the final regulations should include scenarios in addition to those provided in the proposed regulations regarding non-payment <span class=\"match\">months</span> that may be coverage <span class=\"match\">months</span>. One commenter suggested that the final regulations should permit all non-payment <span class=\"match\">months</span> to be coverage <span class=\"match\">months</span> as long as the amount"},{"title":"Methylene Chloride; Regulation Under the Toxic Substances Control Act (TSCA); Compliance Date Extensions","type":"Proposed Rule","abstract":"The Environmental Protection Agency (EPA or Agency) is proposing to extend the compliance date applicable to certain entities subject to the regulation of methylene chloride recently promulgated under the Toxic Substances Control Act (TSCA). Specifically, EPA is proposing to extend by 18 months the Workplace Chemical Protection Program (WCPP) and the associated recordkeeping compliance dates for laboratories that are not owned or operated by agencies or Federal contractors acting on behalf of the Federal government. Under this proposal, all laboratories, whether federal or not, would have the same compliance dates, which would be aligned with current compliance dates for Federal agencies and Federal contractors. EPA is proposing to extend the compliance dates for associated laboratory activities detailed in this proposal to avoid disruption of important functions such as the use of environmental monitoring methods needed for cleanup sites and wastewater treatment, as well as activities associated with university laboratories. The use of environmental monitoring methods, a common function of non-federal laboratories, is important to EPA's mission to ensure that the air is safe to breathe, water is safe for drinking or recreating, and disposal activities protect the environment.","document_number":"2025-09421","html_url":"https://www.federalregister.gov/documents/2025/05/27/2025-09421/methylene-chloride-regulation-under-the-toxic-substances-control-act-tsca-compliance-date-extensions","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-05-27/pdf/2025-09421.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-09421.pdf?1748004316","publication_date":"2025-05-27","agencies":[{"raw_name":"ENVIRONMENTAL PROTECTION AGENCY","name":"Environmental Protection Agency","id":145,"url":"https://www.federalregister.gov/agencies/environmental-protection-agency","json_url":"https://www.federalregister.gov/api/v1/agencies/145","parent_id":null,"slug":"environmental-protection-agency"}],"excerpts":"extend the WCPP <span class=\"match\">compliance</span> dates for the industrial or commercial use of \n \n methylene chloride as a laboratory chemical, established in the May 2024 final rule (Ref. 1), for an additional 18 <span class=\"match\">months</span> to match the <span class=\"match\">compliance</span> dates for Federal agencies and their contractors. Specifically, for laboratories not owned or operated by Federal agencies, or Federal contractors acting on behalf of the Federal government, this proposal would extend the <span class=\"match\">compliance</span> date for initial monitoring from May 5, 2025 to November 9, 2026, the <span class=\"match\">compliance</span> date for establishing"},{"title":"Final Determination: Adoption of Energy Efficiency Standards for New Construction of HUD- and USDA-Financed Housing; Extension of USDA Compliance Dates","type":"Notice","abstract":"On April 26, 2024, the Department of Housing and Urban Development (HUD) and the Department of Agriculture (USDA) published the \"Final Determination: Adoption of Energy Efficiency Standards for New Construction of HUD- and USDA-Financed Housing\" notice (Final Determination) in the Federal Register. The Final Determination provides compliance dates for HUD and USDA programs covered by the Final Determination. This notice delays compliance dates by six months over the published compliance dates for covered projects in the following USDA programs: Section 502 (Guaranteed Loans, Direct Loans) and Section 523 (Self Help Loans).","document_number":"2025-05864","html_url":"https://www.federalregister.gov/documents/2025/04/04/2025-05864/final-determination-adoption-of-energy-efficiency-standards-for-new-construction-of-hud--and","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-04-04/pdf/2025-05864.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-05864.pdf?1743684324","publication_date":"2025-04-04","agencies":[{"raw_name":"DEPARTMENT OF AGRICULTURE","name":"Agriculture Department","id":12,"url":"https://www.federalregister.gov/agencies/agriculture-department","json_url":"https://www.federalregister.gov/api/v1/agencies/12","parent_id":null,"slug":"agriculture-department"}],"excerpts":"extension of <span class=\"match\">compliance</span> dates. \n \n \n SUMMARY: \n \n On April 26, 2024, the Department of Housing and Urban Development (HUD) and the Department of Agriculture (USDA) published the “Final Determination: Adoption of Energy Efficiency Standards for New Construction of HUD- and USDA-Financed Housing” notice (Final Determination) in the \n Federal Register \n . The Final Determination provides <span class=\"match\">compliance</span> dates for HUD and USDA programs covered by the Final Determination. This notice delays <span class=\"match\">compliance</span> dates by six <span class=\"match\">months</span> over the published <span class=\"match\">compliance</span> dates for"},{"title":"Final Determination: Adoption of Energy Efficiency Standards for New Construction of HUD- and USDA-Financed Housing; Extension of HUD Compliance Dates","type":"Notice","abstract":"On April 26, 2024, HUD and the U.S. Department of Agriculture published the \"Final Determination: Adoption of Energy Efficiency Standards for New Construction of HUD- and USDA-Financed Housing\" Notice (Final Determination) in the Federal Register. The Final Determination provides compliance dates for HUD programs covered by the Final Determination. This notice delays compliance dates by six months over the published compliance dates for covered projects in the following programs: Federal Housing Administration-Insured (FHA- Insured) Multifamily, FHA-Insured Single Family, Public Housing Capital Fund, and Competitive Grants (Choice Neighborhoods, Section 202, Section 811). This notice delays the compliance date for Section 8 Project Based Vouchers (PBV) until April, 2026.","document_number":"2025-03758","html_url":"https://www.federalregister.gov/documents/2025/03/10/2025-03758/final-determination-adoption-of-energy-efficiency-standards-for-new-construction-of-hud--and","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-03-10/pdf/2025-03758.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-03758.pdf?1741355115","publication_date":"2025-03-10","agencies":[{"raw_name":"DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT","name":"Housing and Urban Development Department","id":228,"url":"https://www.federalregister.gov/agencies/housing-and-urban-development-department","json_url":"https://www.federalregister.gov/api/v1/agencies/228","parent_id":null,"slug":"housing-and-urban-development-department"}],"excerpts":"ACTION: \n Notice; extension of <span class=\"match\">compliance</span> dates. \n \n \n SUMMARY: \n \n On April 26, 2024, HUD and the U.S. Department of Agriculture published the “Final Determination: Adoption of Energy Efficiency Standards for New Construction of HUD- and USDA-Financed Housing” Notice (Final Determination) in the \n Federal Register \n . The Final Determination provides <span class=\"match\">compliance</span> dates for HUD programs covered by the Final Determination. This notice delays <span class=\"match\">compliance</span> dates by six <span class=\"match\">months</span> over the published <span class=\"match\">compliance</span> dates for covered projects in the following programs:"},{"title":"Extension of Compliance Date for Disclosure of Order Execution Information","type":"Rule","abstract":"The Securities and Exchange Commission (\"Commission\") is extending the compliance date for the amendments to the rules requiring the disclosure of order executions in national market system (\"NMS\") stocks from December 14, 2025, to August 1, 2026.","document_number":"2025-19316","html_url":"https://www.federalregister.gov/documents/2025/10/02/2025-19316/extension-of-compliance-date-for-disclosure-of-order-execution-information","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-10-02/pdf/2025-19316.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-19316.pdf?1759322725","publication_date":"2025-10-02","agencies":[{"raw_name":"SECURITIES AND EXCHANGE COMMISSION","name":"Securities and Exchange Commission","id":466,"url":"https://www.federalregister.gov/agencies/securities-and-exchange-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/466","parent_id":null,"slug":"securities-and-exchange-commission"}],"excerpts":"reporting entities. \n See \n Adopting Release, section IX.D.2.(a). This extension will extend the <span class=\"match\">compliance</span> date for the Rule 605 Amendments by approximately 7.5 <span class=\"match\">months</span>. Therefore, the <span class=\"match\">compliance</span> date extension will result in a savings of approximately $11.3 million * 7.5/12 <span class=\"match\">months</span> = $7.1 million in ongoing <span class=\"match\">compliance</span> costs.\n \n \n \n \n 22 \n  \n See \n FIF III, at 3.\n \n \n \n \n 23 \n  \n See id. \n \n \n \n In addition to delaying <span class=\"match\">compliance</span> costs, the extension of the <span class=\"match\">compliance</span> date will also delay the realization of other economic costs that may result from market"},{"title":"Definition of the Term “Coverage Month” for Computing the Premium Tax Credit","type":"Proposed Rule","abstract":"This document contains proposed regulations that would amend the definition of \"coverage month\" and amend certain other rules in existing income tax regulations regarding the computation of an individual taxpayer's premium tax credit (PTC). The proposed coverage month amendment generally would provide that, in computing a PTC, a month may be a coverage month for an individual if the amount of the premium paid, including by advance payments of the PTC (APTC), for the month for the individual's coverage is sufficient to avoid termination of the individual's coverage for that month. The proposal also would amend the existing regulations relating to the amount of enrollment premiums used in computing the taxpayer's monthly PTC if a portion of the monthly enrollment premium for a coverage month is unpaid. Finally, the proposed regulations would clarify when an individual is considered to be ineligible for coverage under a State's Basic Health Program (BHP). The proposed regulations would affect taxpayers who enroll themselves, or enroll a family member, in individual health insurance coverage through a Health Insurance Exchange (Exchange) and may be allowed a PTC for the coverage. This document also provides a notice of a public hearing on these proposed regulations.","document_number":"2024-20758","html_url":"https://www.federalregister.gov/documents/2024/09/17/2024-20758/definition-of-the-term-coverage-month-for-computing-the-premium-tax-credit","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2024-09-17/pdf/2024-20758.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2024-20758.pdf?1726490716","publication_date":"2024-09-17","agencies":[{"raw_name":"DEPARTMENT OF THE TREASURY","name":"Treasury Department","id":497,"url":"https://www.federalregister.gov/agencies/treasury-department","json_url":"https://www.federalregister.gov/api/v1/agencies/497","parent_id":null,"slug":"treasury-department"},{"raw_name":"Internal Revenue Service","name":"Internal Revenue Service","id":254,"url":"https://www.federalregister.gov/agencies/internal-revenue-service","json_url":"https://www.federalregister.gov/api/v1/agencies/254","parent_id":497,"slug":"internal-revenue-service"}],"excerpts":"coverage during a declared emergency. \n For a <span class=\"match\">month</span> for which a taxpayer's share of the enrollment premium is not paid in full, the current instructions for Form 1095-A require Exchanges to report $0 on Form 1095-A as the enrollment premium for that <span class=\"match\">month</span>, which signals to the taxpayer and the IRS that no PTC is allowed for that <span class=\"match\">month</span> (non-payment <span class=\"match\">month</span>) because a <span class=\"match\">month</span> in which the premium is not paid in full is not a coverage <span class=\"match\">month</span>. Thus, if an individual is enrolled in a QHP with APTC for a <span class=\"match\">month</span> but does not pay the full amount of the monthly"},{"title":"Perchloroethylene (PCE) and Carbon Tetrachloride (CTC); Regulation Under the Toxic Substances Control Act (TSCA); Compliance Date Extensions","type":"Proposed Rule","abstract":"The Environmental Protection Agency (EPA or Agency) is proposing to extend certain compliance dates applicable to certain entities subject to the regulation of perchloroethylene (PCE) and carbon tetrachloride (CTC) under the Toxic Substances Control Act (TSCA). EPA is proposing to extend certain Workplace Chemical Protection Program (WCPP) compliance dates for non-federal owners and operators to match the compliance dates for federal agencies and their contractors. For both PCE and CTC, this proposal would extend the compliance date for initial monitoring for inhalation exposure to June 21, 2027, and extend the compliance date to meet the existing chemical exposure limit (ECEL), establish a regulated area, provide any required respiratory personal protective equipment (PPE), and establish a respiratory PPE program to September 20, 2027. For PCE, EPA is also proposing to extend the compliance date for non-federal entities to establish and implement an exposure control plan to December 20, 2027.","document_number":"2026-05977","html_url":"https://www.federalregister.gov/documents/2026/03/27/2026-05977/perchloroethylene-pce-and-carbon-tetrachloride-ctc-regulation-under-the-toxic-substances-control-act","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2026-03-27/pdf/2026-05977.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2026-05977.pdf?1774529113","publication_date":"2026-03-27","agencies":[{"raw_name":"ENVIRONMENTAL PROTECTION AGENCY","name":"Environmental Protection Agency","id":145,"url":"https://www.federalregister.gov/agencies/environmental-protection-agency","json_url":"https://www.federalregister.gov/api/v1/agencies/145","parent_id":null,"slug":"environmental-protection-agency"}],"excerpts":"proposing to extend only the PCE WCPP <span class=\"match\">compliance</span> dates related to the ECEL and inhalation exposure, and EPA is not proposing to extend the WCPP <span class=\"match\">compliance</span> dates to implement dermal protection required by the PCE Final Rule. \n 2. CTC \n EPA is also proposing to amend 40 CFR 751.707 to extend certain WCPP <span class=\"match\">compliance</span> dates for non-federal owners and operators for an additional twelve <span class=\"match\">months</span> to match the <span class=\"match\">compliance</span> dates for federal agencies and their contractors. Specifically, EPA proposes to extend the <span class=\"match\">compliance</span> date for initial monitoring from June"},{"title":"Investment Company Names Form N-PORT Reporting; Extension of Compliance Date","type":"Rule","abstract":"The Securities and Exchange Commission (the \"Commission\") is extending the compliance date for the amendments to Form N-PORT that were adopted on September 20, 2023 and relate to the rule under the Investment Company Act of 1940 (the \"Investment Company Act\") that addresses certain broad categories of investment company names that are likely to mislead investors about an investment company's investments and risks. The compliance dates for those Form N-PORT amendments are extended to November 17, 2027, for fund groups with net assets of $10 billion or more as of the end of their most recent fiscal year; and to May 18, 2028, for fund groups with less than $10 billion in net assets as of the end of their most recent fiscal year.","document_number":"2026-03459","html_url":"https://www.federalregister.gov/documents/2026/02/23/2026-03459/investment-company-names-form-n-port-reporting-extension-of-compliance-date","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2026-02-23/pdf/2026-03459.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2026-03459.pdf?1771595112","publication_date":"2026-02-23","agencies":[{"raw_name":"SECURITIES AND EXCHANGE COMMISSION","name":"Securities and Exchange Commission","id":466,"url":"https://www.federalregister.gov/agencies/securities-and-exchange-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/466","parent_id":null,"slug":"securities-and-exchange-commission"}],"excerpts":"to eliminate and thus may determine are unnecessary. In addition, the <span class=\"match\">compliance</span> date extension is intended to provide registered funds with sufficient time to comply with the Form N-PORT names rule requirements in the event the Commission does not adopt the amendments. In that event, registered funds would be required to file Form N-PORT reports incorporating the names rule requirements as of the first fiscal-quarter-end <span class=\"match\">month</span> after the <span class=\"match\">compliance</span> date.\n 7 \n \n The <span class=\"match\">compliance</span> dates for all other amendments to rule 35d-1 under the Investment Company"},{"title":"Endangered and Threatened Wildlife and Plants; 12-Month Finding and Proposed Rule To Revise Critical Habitat Designation for Southern California Steelhead","type":"Proposed Rule","abstract":"We, NMFS, announce a 12-month finding on a petition to revise the critical habitat designation under the Endangered Species Act (ESA) for the Southern California steelhead (Oncorhynchus mykiss) distinct population segment (DPS). The petition from the United Water Conservation District (UWCD) requests the removal of an approximately 9-mile (14.5-kilometer (km)) stream reach from the confluence of Hopper Creek and the Santa Clara River to the face of Santa Felicia Dam. Based on our review of the best scientific and commercial data available, we find that the petitioned action to remove this reach from the critical habitat designation is warranted. Consequently, we are proposing to remove this reach from the critical habitat designation for Southern California steelhead.","document_number":"2026-13076","html_url":"https://www.federalregister.gov/documents/2026/06/29/2026-13076/endangered-and-threatened-wildlife-and-plants-12-month-finding-and-proposed-rule-to-revise-critical","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2026-06-29/pdf/2026-13076.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2026-13076.pdf?1782477918","publication_date":"2026-06-29","agencies":[{"raw_name":"DEPARTMENT OF COMMERCE","name":"Commerce Department","id":54,"url":"https://www.federalregister.gov/agencies/commerce-department","json_url":"https://www.federalregister.gov/api/v1/agencies/54","parent_id":null,"slug":"commerce-department"},{"raw_name":"National Oceanic and Atmospheric Administration","name":"National Oceanic and Atmospheric Administration","id":361,"url":"https://www.federalregister.gov/agencies/national-oceanic-and-atmospheric-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/361","parent_id":54,"slug":"national-oceanic-and-atmospheric-administration"}],"excerpts":"ACTION: \n Notice of 12-<span class=\"match\">month</span> petition finding; proposed rule; request for comments. \n \n \n SUMMARY: \n \n We, NMFS, announce a 12-<span class=\"match\">month</span> finding on a petition to revise the critical habitat designation under the Endangered Species Act (ESA) for the Southern California steelhead (\n Oncorhynchus mykiss \n ) distinct population segment (DPS). The petition from the United Water Conservation District (UWCD) requests the removal of an approximately 9-mile (14.5-kilometer (km)) stream reach from the confluence of Hopper Creek and the Santa Clara River to the"},{"title":"Investment Company Names; Extension of Compliance Date","type":"Rule","abstract":"The Securities and Exchange Commission (\"Commission\") is extending the compliance dates for the amendments to the rule under the Investment Company Act of 1940 (\"Investment Company Act\") that addresses certain broad categories of investment company names that are likely to mislead investors about the investment company's investments and risks, as well as related enhanced prospectus disclosure requirements and Form N-PORT reporting requirements, that were adopted on September 20, 2023. The compliance date is extended from December 11, 2025 to June 11, 2026, for fund groups with net assets of $1 billion or more as of the end of their most recent fiscal year; and from June 11, 2026 to December 11, 2026, for fund groups with less than $1 billion in net assets as of the end of their most recent fiscal year. In addition, the Commission is modifying the operation of the compliance dates to allow for compliance based on the timing of certain annual disclosure and reporting obligations that are tied to the fund's fiscal year-end.","document_number":"2025-04705","html_url":"https://www.federalregister.gov/documents/2025/03/20/2025-04705/investment-company-names-extension-of-compliance-date","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-03-20/pdf/2025-04705.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-04705.pdf?1742388317","publication_date":"2025-03-20","agencies":[{"raw_name":"SECURITIES AND EXCHANGE COMMISSION","name":"Securities and Exchange Commission","id":466,"url":"https://www.federalregister.gov/agencies/securities-and-exchange-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/466","parent_id":null,"slug":"securities-and-exchange-commission"}],"excerpts":"develop names rule <span class=\"match\">compliance</span> solutions. While these <span class=\"match\">compliance</span> activities were contemplated under the initial <span class=\"match\">compliance</span> dates, in practice funds are experiencing that they are taking longer than the time available to meet the initial <span class=\"match\">compliance</span> dates, including to modify legacy systems to address these <span class=\"match\">compliance</span> issues.\n \n \n \n After considering the request for a <span class=\"match\">compliance</span> date extension, we are extending by six <span class=\"match\">months</span> the initial <span class=\"match\">compliance</span> dates for all funds to comply with the names rule amendments so that the <span class=\"match\">compliance</span> date will be June 11"},{"title":"Trichloroethylene; Regulation Under the Toxic Substances Control Act (TSCA); Compliance Date Extension","type":"Rule","abstract":"The Environmental Protection Agency (EPA or Agency) is taking interim final action on the Regulation of Trichloroethylene (TCE) under the Toxic Substances Control Act (TSCA) to revise certain compliance deadlines finalized in 2024. Specifically, EPA is amending the prohibition compliance date for the use of TCE as a processing aid in the manufacture of nuclear fuel, with corresponding changes to the compliance dates for the manufacturing, processing and distribution in commerce of TCE to support such use, to a prohibition on September 15, 2028. EPA is also amending the prohibition compliance date for the disposal of TCE to wastewater by processors of TCE and processors and industrial and commercial users of TCE as a processing aid, to begin on December 18, 2026. EPA is also amending the compliance deadline for downstream notification, and the text required to be present in Safety Data Sheets, to accurately reflect the new prohibition compliance deadline for TCE used as a processing aid in the manufacture of nuclear fuel. EPA is amending this compliance deadline to allow for 90 days after the publication of the final rule for manufacturers, processors, and distributors in commerce of TCE to make such a change. These revisions are necessary to address new information presented to EPA about inadvertent oversights in the original rulemaking and serious concerns that the facilities at issue will be unable to comply with the relevant requirements by the existing deadlines. EPA is requesting comments on all aspects of this interim final rule and will consider all comments received in determining whether amendments to this rule are appropriate after the conclusion of the comment period.","document_number":"2025-17948","html_url":"https://www.federalregister.gov/documents/2025/09/17/2025-17948/trichloroethylene-regulation-under-the-toxic-substances-control-act-tsca-compliance-date-extension","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-09-17/pdf/2025-17948.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-17948.pdf?1757967310","publication_date":"2025-09-17","agencies":[{"raw_name":"ENVIRONMENTAL PROTECTION AGENCY","name":"Environmental Protection Agency","id":145,"url":"https://www.federalregister.gov/agencies/environmental-protection-agency","json_url":"https://www.federalregister.gov/api/v1/agencies/145","parent_id":null,"slug":"environmental-protection-agency"}],"excerpts":"detail in section II.C.2, informed EPA of significant <span class=\"match\">compliance</span> issues that could result in the shutting down of chemical processors and manufacturers for multiple chlorinated organics to reach <span class=\"match\">compliance</span>. The information provided by the petitioners supports the need for extending the <span class=\"match\">compliance</span> dates. \n Because the September 15, 2025, <span class=\"match\">compliance</span> deadlines for both petitioners are imminent, EPA has determined that it would be impracticable to undertake prior notice and comment before the <span class=\"match\">compliance</span> deadlines to provide petitioners sufficient time to"},{"title":"Hazard Communication Standard","type":"Rule","abstract":"OSHA is extending the compliance dates in its Hazardous Communications Standard (29 CFR 1910.1200), published in the Federal Register on May 20, 2024 (89 FR 44144), by four months. The compliance date in Sec. 1910.1200(j)(2)(i) is extended from January 19, 2026, until May 19, 2026; the compliance date in Sec. 1910.1200(j)(2)(ii) is extended from July 20, 2026 to November 20, 2026; the compliance date in Sec. 1910.1200(j)(3)(i) is extended from July 19, 2027 to November 19, 2027; and the compliance date in Sec. 1910.1200(j)(3)(ii) is extended from January 19, 2028 to May 19, 2028.","document_number":"2026-00653","html_url":"https://www.federalregister.gov/documents/2026/01/15/2026-00653/hazard-communication-standard","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2026-01-15/pdf/2026-00653.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2026-00653.pdf?1768398310","publication_date":"2026-01-15","agencies":[{"raw_name":"DEPARTMENT OF LABOR","name":"Labor Department","id":271,"url":"https://www.federalregister.gov/agencies/labor-department","json_url":"https://www.federalregister.gov/api/v1/agencies/271","parent_id":null,"slug":"labor-department"},{"raw_name":"Occupational Safety and Health Administration","name":"Occupational Safety and Health Administration","id":386,"url":"https://www.federalregister.gov/agencies/occupational-safety-and-health-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/386","parent_id":271,"slug":"occupational-safety-and-health-administration"}],"excerpts":"extension of <span class=\"match\">compliance</span> dates. \n \n \n SUMMARY: \n \n OSHA is extending the <span class=\"match\">compliance</span> dates in its Hazardous Communications Standard (29 CFR 1910.1200), published in the \n Federal Register \n on May 20, 2024 (89 FR 44144), by four <span class=\"match\">months</span>. The <span class=\"match\">compliance</span> date in § 1910.1200(j)(2)(i) is extended from January 19, 2026, until May 19, 2026; the <span class=\"match\">compliance</span> date in § 1910.1200(j)(2)(ii) is extended from July 20, 2026 to November 20, 2026; the <span class=\"match\">compliance</span> date in § 1910.1200(j)(3)(i) is extended from July 19, 2027 to November 19, 2027; and the <span class=\"match\">compliance</span> date in"},{"title":"Extending the Compliance Deadline for the PFOA and PFOS Maximum Contaminant Levels","type":"Proposed Rule","abstract":"In this proposed rulemaking, the U.S. Environmental Protection Agency (EPA) proposes a federal exemption, pursuant to Safe Drinking Water Act (SDWA) 1416(f) and 1450(a)(1), that will extend the dates of compliance with the Maximum Contaminant Levels (MCLs) for perfluorooctanoic acid (PFOA) and perfluorooctane sulfonic acid (PFOS) from April 26, 2029, to April 26, 2031, for those systems that submit a request. The Agency requests comment on this proposal, including the mechanisms through which the MCL compliance deadlines for PFOA and PFOS can be exempted, and has identified specific areas where public input will be helpful for the EPA in developing the final rule. In addition to seeking written input, the EPA will be holding a public hearing on July 7, 2026.","document_number":"2026-10086","html_url":"https://www.federalregister.gov/documents/2026/05/20/2026-10086/extending-the-compliance-deadline-for-the-pfoa-and-pfos-maximum-contaminant-levels","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2026-05-20/pdf/2026-10086.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2026-10086.pdf?1779194712","publication_date":"2026-05-20","agencies":[{"raw_name":"ENVIRONMENTAL PROTECTION AGENCY","name":"Environmental Protection Agency","id":145,"url":"https://www.federalregister.gov/agencies/environmental-protection-agency","json_url":"https://www.federalregister.gov/api/v1/agencies/145","parent_id":null,"slug":"environmental-protection-agency"}],"excerpts":"would not result in an URTH while water systems work towards implementation of <span class=\"match\">compliance</span> technologies or other non-treatment <span class=\"match\">compliance</span> strategies to ensure <span class=\"match\">compliance</span> with the PFOA and PFOS MCLs by the end of the proposed exemption period (April 26, 2031).\n \n Under SDWA, as well as the proposed national exemptions rulemaking, an “unreasonable risk” determination applies only to PWSs in the context of evaluating SDWA 1416(a) criteria and their ability to achieve <span class=\"match\">compliance</span> with NPDWRs. The EPA acknowledges that there are risks to human health due to"},{"title":"Extension of Compliance Dates for Nondiscrimination on the Basis of Disability; Accessibility of Web Information and Services of State and Local Government Entities","type":"Rule","abstract":"By this Interim Final Rule (\"IFR\"), the Department of Justice (\"Department\") is revising the regulations implementing title II of the Americans with Disabilities Act (\"ADA\") to extend the compliance dates for the requirements for web content and mobile application (\"app\") accessibility that were adopted on April 24, 2024. The compliance date for State and local government entities with a total population of 50,000 or more is extended from April 24, 2026, to April 26, 2027. The compliance date for public entities with a total population of less than 50,000, or any special district government, is extended from April 26, 2027, to April 26, 2028.","document_number":"2026-07663","html_url":"https://www.federalregister.gov/documents/2026/04/20/2026-07663/extension-of-compliance-dates-for-nondiscrimination-on-the-basis-of-disability-accessibility-of-web","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2026-04-20/pdf/2026-07663.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2026-07663.pdf?1776429918","publication_date":"2026-04-20","agencies":[{"raw_name":"DEPARTMENT OF JUSTICE","name":"Justice Department","id":268,"url":"https://www.federalregister.gov/agencies/justice-department","json_url":"https://www.federalregister.gov/api/v1/agencies/268","parent_id":null,"slug":"justice-department"}],"excerpts":"SANPRM, the Department stated that comments submitted in response to the 2010 ANPRM about the suggested <span class=\"match\">compliance</span> dates were “extremely varied,” with recommendations ranging from requiring <span class=\"match\">compliance</span> upon publication of a final rule to allowing a five-year window for <span class=\"match\">compliance</span>, and there was no public consensus.\n 18 \n \n Based on its review of the comments, the Department suggested new potential <span class=\"match\">compliance</span> dates.\n 19 \n \n The potential <span class=\"match\">compliance</span> dates included in the SANPRM ranged from two to three years after the publication of a final rule, depending"},{"title":"Certificates of Compliance","type":"Rule","abstract":"In consultation with U.S. Customs and Border Protection (CBP), the U.S. Consumer Product Safety Commission (Commission or CPSC) issues this final rule (the Final Rule) to revise the agency's regulation for Certificates of Compliance (certificates). The Final Rule aligns CPSC's current certificates rule with other CPSC rules on testing and certification, and implements, for importation of products and substances regulated by CPSC, electronic filing of certificates (eFiling) with CBP.","document_number":"2024-30826","html_url":"https://www.federalregister.gov/documents/2025/01/08/2024-30826/certificates-of-compliance","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-01-08/pdf/2024-30826.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2024-30826.pdf?1736257516","publication_date":"2025-01-08","agencies":[{"raw_name":"CONSUMER PRODUCT SAFETY COMMISSION","name":"Consumer Product Safety Commission","id":84,"url":"https://www.federalregister.gov/agencies/consumer-product-safety-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/84","parent_id":null,"slug":"consumer-product-safety-commission"}],"excerpts":"that to secure a stable and resilient supply chain, message sets need to be ready at least three <span class=\"match\">months</span> prior to import, suppliers require four <span class=\"match\">months</span> to update their systems, each new product requires at least 6 <span class=\"match\">months</span> to mitigate any deviations from eFiling requirements, and one <span class=\"match\">month</span> to correct errors in the data flow. IKEA (130) asserts that eFiling requires many <span class=\"match\">months</span> of preparation with suppliers, vendors, and brokers, recommending a 24-<span class=\"match\">month</span> effective date and a phased approach to implementation. NAFTZ (127) and EAA (131) recommend an effective"}]}