{"description":"Documents matching 'ferc include overall responsibility developing'","count":983,"total_pages":50,"next_page_url":"https://www.federalregister.gov/api/v1/documents?conditions%5Bterm%5D=ferc+include+overall+responsibility+developing&format=json&page=2","results":[{"title":"Commission Information Collection Activities (FERC Form Nos. 6 and 6-Q); Comment Request; Extension","type":"Notice","abstract":"In compliance with the requirements of the Paperwork Reduction Act of 1995 (PRA), the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collections, FERC Form Nos. 6 (Annual Report of Oil Pipeline Companies) and 6-Q (Quarterly Report of Oil Pipeline Companies). The Commission published a 60-day notice in the Federal Register on March 26, 2025 and received no comments.","document_number":"2025-12547","html_url":"https://www.federalregister.gov/documents/2025/07/07/2025-12547/commission-information-collection-activities-ferc-form-nos-6-and-6-q-comment-request-extension","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-07-07/pdf/2025-12547.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-12547.pdf?1751546712","publication_date":"2025-07-07","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Federal Energy Regulatory Commission","name":"Federal Energy Regulatory Commission","id":167,"url":"https://www.federalregister.gov/agencies/federal-energy-regulatory-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/167","parent_id":136,"slug":"federal-energy-regulatory-commission"}],"excerpts":"\n \n <span class=\"match\">FERC</span> Form No. 6, Annual Report of Oil Pipeline Companies \n \n In 1977, the Department of Energy Organization Act transferred to the Commission from the Interstate Commerce Commission (ICC) the <span class=\"match\">responsibility</span> to regulate oil pipeline companies. In accordance with the transfer of authority, the Commission was delegated the <span class=\"match\">responsibility</span> to require oil pipelines to file annual reports of information necessary for the Commission to exercise its statutory <span class=\"match\">responsibilities</span>.\n 2 \n \n The transfer included the ICC Form P, the predecessor to <span class=\"match\">FERC</span> Form"},{"title":"Commission Information Collection Activities (FERC Form Nos. 6 and 6-Q); Comment Request; Extension","type":"Notice","abstract":"In compliance with the requirements of the Paperwork Reduction Act of 1995 (PRA), the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collections, FERC Form Nos. 6 (Annual Report of Oil Pipeline Companies) and 6-Q (Quarterly Report of Oil Pipeline Companies).","document_number":"2025-05108","html_url":"https://www.federalregister.gov/documents/2025/03/26/2025-05108/commission-information-collection-activities-ferc-form-nos-6-and-6-q-comment-request-extension","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-03-26/pdf/2025-05108.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-05108.pdf?1742906718","publication_date":"2025-03-26","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Federal Energy Regulatory Commission","name":"Federal Energy Regulatory Commission","id":167,"url":"https://www.federalregister.gov/agencies/federal-energy-regulatory-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/167","parent_id":136,"slug":"federal-energy-regulatory-commission"}],"excerpts":"\n \n <span class=\"match\">FERC</span> Form No. 6, Annual Report of Oil Pipeline Companies \n \n In 1977, the Department of Energy Organization Act transferred to the Commission from the Interstate Commerce Commission (ICC) the <span class=\"match\">responsibility</span> to regulate oil pipeline companies. In accordance with the transfer of authority, the Commission was delegated the <span class=\"match\">responsibility</span> to require oil pipelines to file annual reports of information necessary for the Commission to exercise its statutory <span class=\"match\">responsibilities</span>.\n 2 \n \n The transfer included the ICC Form P, the predecessor to <span class=\"match\">FERC</span> Form"},{"title":"Commission Information Collection Activities (FERC Form Nos. 1, 1-F, and 3-Q); Comment Request; Extensions","type":"Notice","abstract":"In compliance with the requirements of the Paperwork Reduction Act of 1995 (PRA), the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collections, FERC Form Nos. 1 (Annual Report of Major Electric Utilities, Licensees, and Others), 1-F (Annual Report for Nonmajor Public Utilities and Licensees), and 3-Q (Quarterly Financial Report of Electric Utilities, Licensees, and Natural Gas Companies). The Commission published a 60-day notice in the Federal Register on February 7, 2025. Twelve parties filed comments.","document_number":"2025-11376","html_url":"https://www.federalregister.gov/documents/2025/06/20/2025-11376/commission-information-collection-activities-ferc-form-nos-1-1-f-and-3-q-comment-request-extensions","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-06-20/pdf/2025-11376.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-11376.pdf?1750250722","publication_date":"2025-06-20","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Federal Energy Regulatory Commission","name":"Federal Energy Regulatory Commission","id":167,"url":"https://www.federalregister.gov/agencies/federal-energy-regulatory-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/167","parent_id":136,"slug":"federal-energy-regulatory-commission"}],"excerpts":"244; $25,132 \n 12,566 \n \n \n \n <span class=\"match\">FERC</span> Form No. 3-Q, Quarterly Financial Report of Electric Utilities, Licensees, and Natural Gas Companies \n \n OMB Control Nos. and Titles: \n 1902-0205 (<span class=\"match\">FERC</span> Form No. 3-Q, Quarterly Financial Report of Electric Utilities, Licensees, and Natural Gas Companies).\n \n \n Abstract: \n <span class=\"match\">FERC</span> Form No. 3-Q is a quarterly financial and operating report for rate regulation, market oversight analysis, and financial audits which supplements (a) <span class=\"match\">FERC</span> Form Nos. 1 and 1-F, for the electric industry, or (b) <span class=\"match\">FERC</span> Form No. 2 (Annual Report for"},{"title":"Commission Information Collection Activities (FERC-725A); Comment Request; Extension","type":"Notice","abstract":"In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission (Commission or FERC) is soliciting public comment on the currently approved information collection, FERC-725A (Mandatory Reliability Standards for the Bulk-Power System). There are no changes to the information collection. The 60-day notice comment period ended on October 15, 2024, with no comments received.","document_number":"2024-25847","html_url":"https://www.federalregister.gov/documents/2024/11/07/2024-25847/commission-information-collection-activities-ferc-725a-comment-request-extension","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2024-11-07/pdf/2024-25847.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2024-25847.pdf?1730900730","publication_date":"2024-11-07","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Federal Energy Regulatory Commission","name":"Federal Energy Regulatory Commission","id":167,"url":"https://www.federalregister.gov/agencies/federal-energy-regulatory-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/167","parent_id":136,"slug":"federal-energy-regulatory-commission"}],"excerpts":"and Enforcement of Electric Reliability Standards, Order No. 672, 71 FR 8662 (February 17, 2006), <span class=\"match\">FERC</span> Stats. &amp; Regs. ¶ 31,204 (2006), order on reh'g, Order No. 672-A, 71 FR 19814 (April 18, 2006), <span class=\"match\">FERC</span> Stats. &amp; Regs. ¶ 31,212 (2006).\n \n \n \n \n 4 \n  North American Electric Reliability Corp., 116 <span class=\"match\">FERC</span> ¶ 61,062 (ERO Certification Order), order on reh'g &amp; compliance, 117 <span class=\"match\">FERC</span> ¶ 61,126 (ERO Rehearing Order) (2006), order on compliance, 118 <span class=\"match\">FERC</span> ¶ 61,030 (2007) (January 2007 Compliance Order).\n \n \n On March 16, 2007, the Commission issued Order"},{"title":"Supply Chain Risk Management Reliability Standards Revisions; Equipment and Services Produced or Provided by Certain Entities Identified as Risks to National Security","type":"Rule","abstract":"The Federal Energy Regulatory Commission (Commission) directs the North American Electric Reliability Corporation (NERC), the Commission-certified Electric Reliability Organization, to develop new or modified Reliability Standards that address the sufficiency of responsible entities' supply chain risk management plans related to the identification of and response to supply chain risks. Further, the Commission directs NERC to develop modifications related to supply chain protections for protected cyber assets. This final action also terminates a related notice of inquiry.","document_number":"2025-18394","html_url":"https://www.federalregister.gov/documents/2025/09/23/2025-18394/supply-chain-risk-management-reliability-standards-revisions-equipment-and-services-produced-or","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-09-23/pdf/2025-18394.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-18394.pdf?1758545114","publication_date":"2025-09-23","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Federal Energy Regulatory Commission","name":"Federal Energy Regulatory Commission","id":167,"url":"https://www.federalregister.gov/agencies/federal-energy-regulatory-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/167","parent_id":136,"slug":"federal-energy-regulatory-commission"}],"excerpts":"11.\n \n \n \n 79. The directive to NERC to <span class=\"match\">develop</span> new, or to modify existing, Reliability Standards (and the corresponding burden) are covered by, and already included in, the existing OMB-approved information collection <span class=\"match\">FERC</span>-725 (Certification of Electric Reliability Organization; Procedures for Electric Reliability Standards; OMB Control No. 1902-0225),\n 147 \n \n under Reliability Standards Development.\n 148 \n \n The reporting requirements in <span class=\"match\">FERC</span>-725 <span class=\"match\">include</span> the ERO's <span class=\"match\">overall</span> <span class=\"match\">responsibility</span> for <span class=\"match\">developing</span> Reliability Standards, including any Reliability"},{"title":"Supply Chain Risk Management Reliability Standards","type":"Proposed Rule","abstract":"The Federal Energy Regulatory Commission (Commission) proposes to direct the North American Electric Reliability Corporation, the Commission-certified Electric Reliability Organization, to develop and submit for Commission approval new or modified Reliability Standards that address the: sufficiency of responsible entities' supply chain risk management plans related to the identification of, assessment of, and response to supply chain risks, and applicability of Reliability Standards' supply chain protections to protected cyber assets.","document_number":"2024-22230","html_url":"https://www.federalregister.gov/documents/2024/10/01/2024-22230/supply-chain-risk-management-reliability-standards","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2024-10-01/pdf/2024-22230.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2024-22230.pdf?1727700322","publication_date":"2024-10-01","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Federal Energy Regulatory Commission","name":"Federal Energy Regulatory Commission","id":167,"url":"https://www.federalregister.gov/agencies/federal-energy-regulatory-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/167","parent_id":136,"slug":"federal-energy-regulatory-commission"}],"excerpts":"\n \n \n 54. The proposal to direct NERC to <span class=\"match\">develop</span> new, or to modify existing, reliability standards (and the corresponding burden) are covered by, and already included in, the existing OMB-approved information collection <span class=\"match\">FERC</span>-725 (Certification of Electric Reliability Organization; Procedures for Electric Reliability Standards; OMB Control No. 1902-0225),\n 87 \n \n under Reliability Standards Development.\n 88 \n \n The reporting requirements in <span class=\"match\">FERC</span>-725 <span class=\"match\">include</span> the ERO's <span class=\"match\">overall</span> <span class=\"match\">responsibility</span> for <span class=\"match\">developing</span> Reliability Standards, such as any Reliability"},{"title":"Gulf South Pipeline Company, LLC; Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Petal Cavern Expansion Project","type":"Notice","abstract":null,"document_number":"2026-08650","html_url":"https://www.federalregister.gov/documents/2026/05/05/2026-08650/gulf-south-pipeline-company-llc-notice-of-scoping-period-requesting-comments-on-environmental-issues","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2026-05-05/pdf/2026-08650.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2026-08650.pdf?1777898738","publication_date":"2026-05-05","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Federal Energy Regulatory Commission","name":"Federal Energy Regulatory Commission","id":167,"url":"https://www.federalregister.gov/agencies/federal-energy-regulatory-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/167","parent_id":136,"slug":"federal-energy-regulatory-commission"}],"excerpts":"request. You must <span class=\"match\">include</span> the docket number CP26-127-000 in your request. If you are requesting a change to your address, please be sure to <span class=\"match\">include</span> your name and the correct address. If you are requesting to delete your address from the mailing list, please <span class=\"match\">include</span> your name and address as it appeared on this notice. This email address is unable to accept comments. OR\n \n (2) Return the attached “Mailing List Update Form” (appendix 2). \n Additional Information \n \n Additional information about the project is available from the <span class=\"match\">FERC</span> website at \n www"},{"title":"Risk-Informed, Technology-Inclusive Regulatory Framework for Advanced Reactors","type":"Rule","abstract":"The U.S. Nuclear Regulatory Commission (NRC) is amending its regulations by adding a risk-informed, performance-based, and technology-inclusive regulatory framework for commercial nuclear plants in response to the Nuclear Energy Innovation and Modernization Act (NEIMA). The current application and licensing requirements were primarily developed to address license requests concerning light water- cooled reactors and operational requirements for those types of reactors. This final rule responds to NEIMA by creating an alternative, technology-inclusive regulatory framework to accommodate licensing of future commercial nuclear plants, including advanced reactor designs that may not employ light-water technology.","document_number":"2026-06048","html_url":"https://www.federalregister.gov/documents/2026/03/30/2026-06048/risk-informed-technology-inclusive-regulatory-framework-for-advanced-reactors","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2026-03-30/pdf/2026-06048.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2026-06048.pdf?1774615514","publication_date":"2026-03-30","agencies":[{"raw_name":"NUCLEAR REGULATORY COMMISSION","name":"Nuclear Regulatory Commission","id":383,"url":"https://www.federalregister.gov/agencies/nuclear-regulatory-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/383","parent_id":null,"slug":"nuclear-regulatory-commission"}],"excerpts":"information and notes that information provided in the application may <span class=\"match\">include</span> some aspects of the design that are not fully <span class=\"match\">developed</span>. This provision requires that the completed design, including any changes during construction, be described in the FSAR in an application for an OL. This <span class=\"match\">includes</span> the requirement for a description of the PRA, other SREs, or a combination thereof required by § 53.450(a) and its results. Probabilistic risk assessments, other SREs, or a combination thereof <span class=\"match\">developed</span> for commercial nuclear plants prior to construction are based"},{"title":"Five-Year Review of the Oil Pipeline Index","type":"Rule","abstract":"The Federal Energy Regulatory Commission (Commission) issues this Final Order concluding its five-year review of the index level used to determine annual changes to oil pipeline rate ceilings. The Commission establishes an index level of Producer Price Index for Finished Goods minus 0.55% (PPI-FG-0.55%) for the five-year period beginning July 1, 2026.","document_number":"2026-08264","html_url":"https://www.federalregister.gov/documents/2026/04/28/2026-08264/five-year-review-of-the-oil-pipeline-index","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2026-04-28/pdf/2026-08264.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2026-08264.pdf?1777293918","publication_date":"2026-04-28","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Federal Energy Regulatory Commission","name":"Federal Energy Regulatory Commission","id":167,"url":"https://www.federalregister.gov/agencies/federal-energy-regulatory-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/167","parent_id":136,"slug":"federal-energy-regulatory-commission"}],"excerpts":"reh'g, \n 178 <span class=\"match\">FERC</span> ¶ 61,023 (January 2022 Rehearing Order), \n reh'g denied, \n 179 <span class=\"match\">FERC</span> ¶ 61,100 (2022), \n vacated sub nom. Liquid Energy Pipeline Ass'n \n v. \n <span class=\"match\">FERC</span>, \n 109 F.4th 543 (D.C. Cir. 2024) (\n LEPA \n v. \n <span class=\"match\">FERC</span> \n ), \n order following vacatur, \n 188 <span class=\"match\">FERC</span> ¶ 61,173 (2024), \n order on reh'g, \n 193 <span class=\"match\">FERC</span> ¶ 61,137 (2025).\n \n \n \n \n 14 \n  2020 Index Review, 173 <span class=\"match\">FERC</span> ¶ 61,245 at P 9.\n \n \n B. Kahn Methodology \n \n 5. In Order No. 561 and in each five-year review, the Commission has calculated the index level using a methodology <span class=\"match\">developed</span> by Dr. Alfred"},{"title":"Revisions to the Blanket Certificate Program","type":"Proposed Rule","abstract":"The Federal Energy Regulatory Commission (Commission) proposes to revise its blanket certificate regulations to expand the scope and scale of projects that interstate natural gas pipelines may construct without a case-specific authorization order and to increase the cost limits for such projects, among other changes.","document_number":"2026-10498","html_url":"https://www.federalregister.gov/documents/2026/05/27/2026-10498/revisions-to-the-blanket-certificate-program","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2026-05-27/pdf/2026-10498.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2026-10498.pdf?1779799514","publication_date":"2026-05-27","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Federal Energy Regulatory Commission","name":"Federal Energy Regulatory Commission","id":167,"url":"https://www.federalregister.gov/agencies/federal-energy-regulatory-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/167","parent_id":136,"slug":"federal-energy-regulatory-commission"}],"excerpts":"affected landowners as defined by the Commission's regulations.\n \n \n \n 126 \n  \n Transwestern Pipeline Co., LLC, \n 194 <span class=\"match\">FERC</span> ¶ 62,131 (2026); \n S. Star Cent. Pipeline, Inc., \n 194 <span class=\"match\">FERC</span> ¶ 62,097 (2026); \n Nw. Pipeline LLC, \n 194 <span class=\"match\">FERC</span> ¶ 62,021 (2026).\n \n \n \n \n 127 \n  \n E.g., Fla. Gas Transmission Co., LLC, \n 182 <span class=\"match\">FERC</span> ¶ 61,170 (2023); \n El Paso Nat. Gas Co., L.L.C., \n 192 <span class=\"match\">FERC</span> ¶ 61,078 (2025); \n Mountain Valley Pipeline, LLC, \n 171 <span class=\"match\">FERC</span> ¶ 61,047 (2020).\n \n \n 45. Nonetheless, we recognize that establishing more prescriptive eligibility criteria for protestors"},{"title":"Standards for Business Practices of Interstate Natural Gas Pipelines","type":"Rule","abstract":"The Federal Energy Regulatory Commission amends its regulations to incorporate by reference, as mandatory enforceable requirements, revisions to three of the Version 4.0 Standards for Business Practices of Interstate Natural Gas Pipelines adopted by the Wholesale Gas Quadrant (WGQ) of the North American Energy Standards Board (NAESB). These revisions are designed to streamline the process for accessing publicly available gas-electric coordination data during extreme cold weather or emergency events.","document_number":"2026-10600","html_url":"https://www.federalregister.gov/documents/2026/05/28/2026-10600/standards-for-business-practices-of-interstate-natural-gas-pipelines","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2026-05-28/pdf/2026-10600.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2026-10600.pdf?1779885915","publication_date":"2026-05-28","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Federal Energy Regulatory Commission","name":"Federal Energy Regulatory Commission","id":167,"url":"https://www.federalregister.gov/agencies/federal-energy-regulatory-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/167","parent_id":136,"slug":"federal-energy-regulatory-commission"}],"excerpts":"sets evenly, is $97.728. We round it to $98/hour. \n \n <span class=\"match\">FERC</span>-545: 193 entities × 1 response/entity (10 hours/response × $98/hour) = $189,140. \n <span class=\"match\">FERC</span>-549C: 193 entities × 1 response/entity (100 hours × $98/hour) = $1,891,400. \n \n Title: \n <span class=\"match\">FERC</span>-545, Gas Pipeline Rates: Rates Change (Non-Formal); <span class=\"match\">FERC</span>-549C, Standards for Business Practices of Interstate Natural Gas Pipelines.\n \n \n Action: \n Revision to existing information collections.\n \n \n OMB Control Nos.: \n 1902-0154 (<span class=\"match\">FERC</span>-545), 1902-0174 (<span class=\"match\">FERC</span>-549C).\n \n \n Respondents: \n Business or other for profit"},{"title":"Loveland Area Projects-Rate Order No. WAPA-219","type":"Notice","abstract":"The formula rates for the Rocky Mountain region's (RMR) Loveland Area Projects (LAP) transmission and ancillary services for RMR's costs to be recovered under the Southwest Power Pool's (SPP) Open Access Transmission Tariff (Tariff) should RMR decide to become a member of SPP, have been confirmed, approved, and placed into effect on an interim basis (Provisional Formula Rates). If RMR decides to become a member of SPP, these new formula rates under Rate Schedules LAPT-ATRR (transmission), LAPT-DCTIE-IMEU (incremental market efficiency use share), and LAPT-AS1 (scheduling, system control, and dispatch) will supersede the existing formula rates for transmission and ancillary services under Rate Schedules L-NT1, L-FPT1, L-NFPT1, L-NFJDT, L-UU1, L-AS1, L-AS2, L-AS3, L-AS4, L-AS5, L-AS6, L-AS7, and L-AS9, which expire on September 30, 2026.","document_number":"2025-12992","html_url":"https://www.federalregister.gov/documents/2025/07/11/2025-12992/loveland-area-projects-rate-order-no-wapa-219","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-07-11/pdf/2025-12992.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-12992.pdf?1752151517","publication_date":"2025-07-11","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Western Area Power Administration","name":"Western Area Power Administration","id":525,"url":"https://www.federalregister.gov/agencies/western-area-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/525","parent_id":136,"slug":"western-area-power-administration"}],"excerpts":"Schedules on a Final Basis, <span class=\"match\">FERC</span> Docket No. EF24-6-000 (2024).\n \n \n Legal Authority \n \n By Delegation Order No. S1-DEL-RATES-2016, effective November 19, 2016, the Secretary of Energy delegated: (1) the authority to <span class=\"match\">develop</span> power and transmission rates to the WAPA Administrator; (2) the authority to confirm, approve, and place such rates into effect on an interim basis to the Deputy Secretary of Energy; and (3) the authority to confirm, approve, and place into effect on a final basis, or to remand or disapprove such rates, to <span class=\"match\">FERC</span>. By Delegation Order"},{"title":"Order No. 917; Filing Process and Data Collection for the Electric Quarterly Report","type":"Rule","abstract":"The Federal Energy Regulatory Commission adopts eXtensible Business Reporting Language-Comma-Separated Values as the standard for filing the Electric Quarterly Report (EQR). In addition, the Commission amends its regulations to require Regional Transmission Organizations and Independent System Operators to produce reports containing market participant transaction data. The Commission also modifies and clarifies EQR reporting requirements. These changes are designed to update the data collection, improve data quality, increase market transparency, decrease the costs, over time, of preparing the necessary data for submission, and streamline compliance with any future changes to the filing requirements.","document_number":"2026-05709","html_url":"https://www.federalregister.gov/documents/2026/03/24/2026-05709/order-no-917-filing-process-and-data-collection-for-the-electric-quarterly-report","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2026-03-24/pdf/2026-05709.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2026-05709.pdf?1774269913","publication_date":"2026-03-24","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Federal Energy Regulatory Commission","name":"Federal Energy Regulatory Commission","id":167,"url":"https://www.federalregister.gov/agencies/federal-energy-regulatory-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/167","parent_id":136,"slug":"federal-energy-regulatory-commission"}],"excerpts":" 99 <span class=\"match\">FERC</span> ¶ 61,107, \n reh'g denied, \n Order No. 2001-A, 100 <span class=\"match\">FERC</span> ¶ 61,074, \n reh'g denied, \n Order No. 2001-B, 100 <span class=\"match\">FERC</span> ¶ 61,342, \n order directing filing, \n Order No. 2001-C, 67 FR 79077 (Dec. 27, 2002), 101 <span class=\"match\">FERC</span> ¶ 61,314 (2002), \n order directing filing, \n Order No. 2001-D, 102 <span class=\"match\">FERC</span> ¶ 61,334, \n order refining filing requirements, \n Order No. 2001-E, 105 <span class=\"match\">FERC</span> ¶ 61,352 (2003), \n order on clarification, \n Order No. 2001-F, 106 <span class=\"match\">FERC</span> ¶ 61,060 (2004), \n order revising filing requirements, \n Order No. 2001-G, 72 FR 56735 (Oct. 4, 2007), 120 <span class=\"match\">FERC</span> ¶ 61"},{"title":"Interregional Transfer Capability Study: Strengthening Reliability Through the Energy Transformation","type":"Notice","abstract":null,"document_number":"2024-30493","html_url":"https://www.federalregister.gov/documents/2024/12/27/2024-30493/interregional-transfer-capability-study-strengthening-reliability-through-the-energy-transformation","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2024-12-27/pdf/2024-30493.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2024-30493.pdf?1735220715","publication_date":"2024-12-27","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Federal Energy Regulatory Commission","name":"Federal Energy Regulatory Commission","id":167,"url":"https://www.federalregister.gov/agencies/federal-energy-regulatory-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/167","parent_id":136,"slug":"federal-energy-regulatory-commission"}],"excerpts":"regions. The Fiscal <span class=\"match\">Responsibility</span> Act requires the ITC Study to <span class=\"match\">include</span>:\n \n \n \n 3 \n  Federal Power Act (FPA) section 215 provides that the Commission may certify an Electric Reliability Organization, the purpose of which is to <span class=\"match\">develop</span> mandatory and enforceable Reliability Standards, subject to Commission review and approval. 16 U.S.C. 824o(c). The Commission subsequently certified NERC as the Electric Reliability Organization. \n N. Am. Elec. Reliability Corp., \n 116 <span class=\"match\">FERC</span> ¶ 61,062, \n order on reh'g and compliance, \n 117 <span class=\"match\">FERC</span> ¶ 61,126 (2006), \n aff'd"},{"title":"Updating the Water Quality Certification Regulations","type":"Proposed Rule","abstract":"The U.S. Environmental Protection Agency (EPA) is publishing this proposed rule to update and clarify several substantive and procedural requirements for water quality certification under Clean Water Act (CWA or the Act) section 401. CWA section 401 is a direct grant of authority to States (and Tribes that have been approved for \"treatment as a State\" status) to review for compliance with appropriate Federal, State, and Tribal water quality requirements any discharge into waters of the United States that may result from a proposed activity that requires a Federal license or permit. This proposed rule is intended to clarify several aspects of the certification process consistent with the statutory framework.","document_number":"2026-00754","html_url":"https://www.federalregister.gov/documents/2026/01/15/2026-00754/updating-the-water-quality-certification-regulations","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2026-01-15/pdf/2026-00754.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2026-00754.pdf?1768398323","publication_date":"2026-01-15","agencies":[{"raw_name":"ENVIRONMENTAL PROTECTION AGENCY","name":"Environmental Protection Agency","id":145,"url":"https://www.federalregister.gov/agencies/environmental-protection-agency","json_url":"https://www.federalregister.gov/api/v1/agencies/145","parent_id":null,"slug":"environmental-protection-agency"}],"excerpts":"shall administer this chapter.”); \n id. \n at 1361(a); \n Mayo Found. for Medical Educ. and Res. \n v. \n United States, \n 562 U.S. 44, 45 (2011); \n Hoopa Valley Tribe \n v. \n <span class=\"match\">FERC</span>, \n 913 F.3d 1099, 1104 (D.C. Cir. 2019); \n Ala. Rivers Alliance \n v. \n <span class=\"match\">FERC</span>, \n 325 F.3d 290, 296-97 (D.C. Cir. 2003); \n Cal. Trout \n v. \n <span class=\"match\">FERC</span>, \n 313 F.3d 1131, 1133 (9th Cir. 2002); \n Am. Rivers, Inc. \n v. \n <span class=\"match\">FERC</span>, \n 129 F. 3d 99, 107 (2d Cir. 1997).\n \n \n \n The EPA is required to provide certification or waiver where no State, Tribe, or interstate agency has the authority to provide"},{"title":"Accounting and Reporting Treatment of Certain Renewable Energy Assets","type":"Rule","abstract":"In this final rule, the Federal Energy Regulatory Commission (Commission or FERC) is amending the Uniform System of Accounts (USofA) for public utilities and licensees to: create new accounts for wind, solar, and other renewable generating assets; create a new functional class for energy storage accounts; codify the accounting treatment of environmental credits; and create new accounts within existing functions for computer hardware, software, and communication equipment. We also amend the relevant FERC forms to accommodate these changes.","document_number":"2023-14994","html_url":"https://www.federalregister.gov/documents/2023/10/05/2023-14994/accounting-and-reporting-treatment-of-certain-renewable-energy-assets","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2023-10-05/pdf/2023-14994.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2023-14994.pdf?1696423520","publication_date":"2023-10-05","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Federal Energy Regulatory Commission","name":"Federal Energy Regulatory Commission","id":167,"url":"https://www.federalregister.gov/agencies/federal-energy-regulatory-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/167","parent_id":136,"slug":"federal-energy-regulatory-commission"}],"excerpts":"1 and 592.2).\n \n \n \n 191 \n  NOPR, 180 <span class=\"match\">FERC</span> ¶ 61,050 at P 62, App. B: <span class=\"match\">FERC</span> Form Nos. 1/1-F at 204-207, 219, 321-322, <span class=\"match\">FERC</span> Form No. 1 at 227, 336, 352, 354, 401a, <span class=\"match\">FERC</span> Form No. 1-F at 21, 24, <span class=\"match\">FERC</span> Form No. 3-Q (electric) at 208, 324a, 324b.\n \n \n \n 118. The proposed reporting changes to <span class=\"match\">FERC</span> Form Nos. 1, 1-F, and 3-Q (electric) would result in changes to centralized service company reporting in <span class=\"match\">FERC</span> Form No. 60, Schedule XVI—Analysis of Charges for Service—Associate and Non-Associate Companies, because the <span class=\"match\">FERC</span> Form No. 60 summarizes the functional"},{"title":"Loveland Area Projects-Rate Order No. WAPA-219","type":"Notice","abstract":"The Rocky Mountain (RM) region of the Western Area Power Administration (WAPA) proposes new formula rates for the Loveland Area Projects (LAP) transmission and ancillary services for RM's costs to be recovered under the Southwest Power Pool's (SPP) Open Access Transmission Tariff (Tariff) should RM decide to become a member of SPP. The proposed formula rates will become effective on the latter of RM's membership date or the go-live date of the expansion of the SPP Regional Transmission Organization (RTO) into the Western Interconnection (scheduled for April 1, 2026, as of the date of this notice) and will remain in effect for five years from the effective date, which with an effective date of April 1, 2026, will be March 31, 2031, or until superseded.","document_number":"2024-30862","html_url":"https://www.federalregister.gov/documents/2024/12/27/2024-30862/loveland-area-projects-rate-order-no-wapa-219","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2024-12-27/pdf/2024-30862.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2024-30862.pdf?1735220725","publication_date":"2024-12-27","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Western Area Power Administration","name":"Western Area Power Administration","id":525,"url":"https://www.federalregister.gov/agencies/western-area-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/525","parent_id":136,"slug":"western-area-power-administration"}],"excerpts":"es/2026-rate-adjustment-rto-trans-and-anc-svcs. \n \n RM will accept comments any time during the consultation and comment period. \n \n \n ADDRESSES: \n \n Written comments and requests to be informed of Federal Energy Regulatory Commission (<span class=\"match\">FERC</span>) actions concerning the proposed formula rates submitted by WAPA to <span class=\"match\">FERC</span> for approval should be sent to: Barton V. Barnhart, Regional Manager, Rocky Mountain Region, Western Area Power Administration, 5555 East Crossroads Boulevard, Loveland, CO 80538-8986, or email \n LAPTransAdj@wapa.gov. \n RM will post information"},{"title":"Coordination of Federal Authorizations for Electric Transmission Facilities","type":"Rule","abstract":"The Department of Energy (DOE) is amending its regulations for the timely coordination of Federal authorizations for proposed interstate electric transmission facilities pursuant to the Federal Power Act (FPA). Specifically, DOE is establishing an integrated and comprehensive Coordinated Interagency Transmission Authorizations and Permits Program (CITAP Program); making participation in the Integrated Interagency Pre-Application (IIP) Process a pre-condition for assistance under the CITAP Program; re-establishing the IIP Process as an iterative and collaborative process between the proponent of a proposed electric transmission project and Federal and State agencies to develop information needed for Federal authorizations; requiring the project proponent to engage in robust engagement with the public, communities of interest, and Indian Tribes during the IIP Process; aligning and harmonizing the IIP Process and implementation of the FPA with the Fixing America's Surface Transportation Act; and ensuring that DOE may carry out its statutory obligation to prepare a single environmental review document sufficient for the purposes of all Federal authorizations necessary to site a proposed project.","document_number":"2024-08157","html_url":"https://www.federalregister.gov/documents/2024/05/01/2024-08157/coordination-of-federal-authorizations-for-electric-transmission-facilities","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2024-05-01/pdf/2024-08157.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2024-08157.pdf?1714481119","publication_date":"2024-05-01","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"}],"excerpts":"electric transmission facility seeking a permit from <span class=\"match\">FERC</span> pursuant to section 216(b) of the FPA, which stated that DOE may only consider a request for coordination if the requestor is <span class=\"match\">FERC</span> acting through its chair, DOE revises its proposal in this final rule to clarify that the request for Federal coordination for proposed transmission facilities seeking a permit from <span class=\"match\">FERC</span> under section 216(b) must be consistent with Delegation Order No. 1-DEL-<span class=\"match\">FERC</span>-2006 or any similar, subsequent delegation to <span class=\"match\">FERC</span>, which depend on the mutual and continuing agreement"},{"title":"The Safer Affordable Fuel-Efficient (SAFE) Vehicles Rule III for Model Years 2022 to 2031 Passenger Cars and Light Trucks","type":"Proposed Rule","abstract":"NHTSA, on behalf of the Department of Transportation (DOT), proposes to substantially recalibrate the Corporate Average Fuel Economy (CAFE) program to realign this program with Congressional intent. That recalibration includes proposing to amend DOT's fuel economy standards for light-duty vehicles for model years (MYs) 2022- 2026 and MYs 2027-2031. Consistent with statutory requirements, the fuel economy standards proposed in this rule are founded on light-duty vehicles powered by gasoline and diesel fuels, a category that includes non-plug-in hybrid vehicles. In formulating the proposed standards, NHTSA has not considered, consistent with law, the imputed fuel-economy performance of battery-powered electric vehicles (EVs) or the electric operation of vehicles that use plug-in hybrid electric powertrains, nor compliance credits or adjustments to the two-cycle fuel economy test procedures to account for air conditioning and off-cycle technologies. NHTSA also is proposing to eliminate the inter-manufacturer credit trading system and to amend the light-duty vehicle fleet classification system to allocate vehicles into passenger and non-passenger automobile fleets appropriately, based on their attributes and capabilities, starting in MY 2028. Elimination of unlawful considerations, combined with several of the proposed changes, would significantly improve the capabilities of manufacturers to meet fuel economy standards, better align the program with Congressional intent, and reduce manufacturer incentives to design vehicles and add features that are not desired by American consumers and that have questionable real-world fuel economy benefits. NHTSA is therefore proposing to set fuel economy standards that increase from newly proposed MY 2022 standards at a rate of 0.5 percent per year through MY 2026, followed by 0.25 percent per year through MY 2031, with MY 2027 stringency established as a bridge between the two sets of standards. The reduced stringency increases in later years, coupled with a reevaluation of the coefficients that define the functions governing fuel economy standards, are intended to establish maximum feasible standards in a manner that gains real-world fuel-economy-benefits, while enabling the industry to adapt to the proposed substantial recalibration of the CAFE program. NHTSA projects that the amended standards would correspond to the industry fleetwide average for all light-duty vehicles of roughly 34.5 miles per gallon (mpg) in MY 2031.","document_number":"2025-22014","html_url":"https://www.federalregister.gov/documents/2025/12/05/2025-22014/the-safer-affordable-fuel-efficient-safe-vehicles-rule-iii-for-model-years-2022-to-2031-passenger","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-12-05/pdf/2025-22014.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-22014.pdf?1764855918","publication_date":"2025-12-05","agencies":[{"raw_name":"DEPARTMENT OF TRANSPORTATION","name":"Transportation Department","id":492,"url":"https://www.federalregister.gov/agencies/transportation-department","json_url":"https://www.federalregister.gov/api/v1/agencies/492","parent_id":null,"slug":"transportation-department"},{"raw_name":"National Highway Traffic Safety Administration","name":"National Highway Traffic Safety Administration","id":345,"url":"https://www.federalregister.gov/agencies/national-highway-traffic-safety-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/345","parent_id":492,"slug":"national-highway-traffic-safety-administration"}],"excerpts":"for which new standards are being proposed. The calendar year perspective, on the other hand, <span class=\"match\">includes</span> the annual impacts attributable to all vehicles estimated to be in service in each calendar year for which the analysis <span class=\"match\">includes</span> a representation of the entire registered light-duty fleet. For this proposed rule, this calendar year perspective covers each of CYs 2024-2050. Compared to the model year perspective, the calendar year perspective <span class=\"match\">includes</span> model years of vehicles produced in the longer term, beyond those model years for which standards"},{"title":"Commission Information Collection Activities (FERC-725N); Comment Request; Extension","type":"Notice","abstract":"In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy Regulatory Commission FERC-725N, (Mandatory Reliability Standards TPL-007-4, Transmission System Planned Performance for Geomagnetic Disturbance Events), which will be submitted to the Office of Management and Budget (OMB) for review. No Comments were received on the 60-day notice published on September 29, 2022.","document_number":"2023-01318","html_url":"https://www.federalregister.gov/documents/2023/01/24/2023-01318/commission-information-collection-activities-ferc-725n-comment-request-extension","pdf_url":"https://www.govinfo.gov/content/pkg/FR-2023-01-24/pdf/2023-01318.pdf","public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2023-01318.pdf?1674481539","publication_date":"2023-01-24","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Federal Energy Regulatory Commission","name":"Federal Energy Regulatory Commission","id":167,"url":"https://www.federalregister.gov/agencies/federal-energy-regulatory-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/167","parent_id":136,"slug":"federal-energy-regulatory-commission"}],"excerpts":"Standards <span class=\"match\">developed</span> by the ERO and approved by the Commission apply to users, owners and operators of the Bulk-Power System as set forth in each Reliability Standard.\n \n \n \n 3 \n \n Rules Concerning Certification of the Electric Reliability Organization; and Procedures for the Establishment, Approval, and Enforcement of Electric Reliability Standards, \n Order No. 672, <span class=\"match\">FERC</span> Stats. &amp; Regs. ¶ 31,204, \n order on reh'g, \n Order No. 672-A, <span class=\"match\">FERC</span> Stats. &amp; Regs. ¶ 31,212 (2006).\n \n \n \n \n 4 \n \n North American Electric Reliability Corp., \n 116 <span class=\"match\">FERC</span> ¶ 61,062"}]}