{"abstract":"Under the Project XL program, the EPA is supporting a project for the Georgia-Pacific Corporation facility located in Big Island, Virginia. The terms of the project are defined in the \"Georgia-Pacific Corporation Big Island, Virginia Project XL Final Project Agreement\" (FPA). The EPA is issuing this rule, applicable only to the Georgia-Pacific Big Island facility, to help implement the project. Under the terms of the FPA, Georgia-Pacific will install and operate the first commercial scale, black liquor gasification system in the United States. Use of this system will provide superior air emissions reductions and energy benefits compared to the use of conventional technology for recovering pulping chemicals from black liquor wastes in the pulp and paper industry. Once installed and successfully operating, the black liquor gasification system is expected to easily meet emission standards that apply (specifically the National Emission Standards for Hazardous Air Pollutants From Chemical Recovery Combustion Sources at Kraft, Soda, Sulfite, and Stand-Alone Semichemical Pulp Mills, promulgated in the Federal Register on January 12, 2001 (66 FR 3179)). However, since the system will be the first demonstrated on a commercial scale in the United States, there is some risk that it ultimately will not operate successfully. If this event occurs, Georgia-Pacific may require temporary relief from the otherwise applicable emissions standards. Without this relief, Georgia-Pacific would not proceed to commercialize the gasification technology. This action provides a limited extension to the date of compliance with the standards for the Big Island facility if the system is not successful.","action":"Direct final rule.","agencies":[{"raw_name":"ENVIRONMENTAL PROTECTION AGENCY","name":"Environmental Protection Agency","id":145,"url":"https://www.federalregister.gov/agencies/environmental-protection-agency","json_url":"https://www.federalregister.gov/api/v1/agencies/145","parent_id":null,"slug":"environmental-protection-agency"}],"body_html_url":"https://www.federalregister.gov/documents/full_text/html/2001/03/26/01-7399.html","cfr_references":[{"chapter":null,"citation_url":null,"part":"63","title":40}],"citation":"66 FR 16400","comment_url":null,"comments_close_on":"2001-04-25","correction_of":null,"corrections":[],"dates":"This direct final rule will be effective on June 25, 2001, without further notice, unless EPA receives adverse comments by April 25, 2001. Written comments must be received by April 25, 2001. Anyone requesting a public hearing must contact the EPA no later than April 5, 2001. If a public hearing is held, it will be on April 28, 2001, at 10:00 a.m. Requests to present oral testimony must be made by April 16, 2001. Persons interested in requesting a hearing, attending a hearing, or presenting oral testimony at a hearing should call Mr. David Beck at (919) 541-5421. If we receive any adverse comment, we will publish a timely withdrawal in the Federal Register informing the public that this direct final rule will not take effect.","disposition_notes":null,"docket_ids":["FRL-6767-8"],"dockets":[],"document_number":"01-7399","effective_on":"2001-06-25","end_page":16409,"executive_order_notes":null,"executive_order_number":null,"full_text_xml_url":"https://www.federalregister.gov/documents/full_text/xml/2001/03/26/01-7399.xml","html_url":"https://www.federalregister.gov/documents/2001/03/26/01-7399/project-xl-site-specific-rulemaking-for-georgia-pacific-corporations-facility-in-big-island-va","images":{},"images_metadata":{},"json_url":"https://www.federalregister.gov/api/v1/documents/01-7399?publication_date=2001-03-26","mods_url":"https://www.govinfo.gov/metadata/granule/FR-2001-03-26/01-7399/mods.xml","not_received_for_publication":null,"page_length":10,"page_views":{"count":75,"last_updated":"2026-11-22 14:15:04 -0500"},"pdf_url":"https://www.govinfo.gov/content/pkg/FR-2001-03-26/pdf/01-7399.pdf","presidential_document_number":null,"proclamation_number":null,"public_inspection_pdf_url":null,"publication_date":"2001-03-26","raw_text_url":"https://www.federalregister.gov/documents/full_text/text/2001/03/26/01-7399.txt","regulation_id_number_info":{"2060-AJ39":{"issue":"200010","html_url":"https://www.federalregister.gov/regulations/2060-AJ39/project-xl-site-specific-rulemaking-for-georgia-pacific-corporation-s-facility-in-big-island-virgini","title":"Project XL Site-Specific Rulemaking for Georgia-Pacific Corporation's Facility in Big Island, Virginia","xml_url":"http://www.reginfo.gov/public/do/eAgendaViewRule?pubId=200010&RIN=2060-AJ39&operation=OPERATION_EXPORT_XML","priority_category":"Substantive, Nonsignificant"}},"regulation_id_numbers":["2060-AJ39"],"regulations_dot_gov_info":{"supporting_documents":[{"title":"Note with attachments from Beck D.(EPA/OPEI) to Donohue S. (EPA\nRegion III), Telander Jeff (EPA/OAQPS), Silverman S. (EPA/OGC), Venus S. (EPA, OECA), Finman H. (EPA/OAP), Moore P. (Georgia Pacific Corp.), Berkeley T. (VA Dept. of Env. Quality), and Huber C. (U.S. Forest Service). Transmittal of revised draft site specific rule. [A-2000-42-II-F-4]","document_id":"EPA-HQ-OAR-2004-0049-0012"},{"title":"Note with attachment from Berkeley T., VA Dept. of Env. Quality, to Beck D., EPA/OPEI, transmitting comments on the draft site specific rule. [A-2000-42-II-F-3]","document_id":"EPA-HQ-OAR-2004-0049-0011"},{"title":"Note with attachments from Beck D. (EPA/OPEI) to Donohue S. (EPA Region III), Telander Jeff (EPA/OAQPS), Silverman S. (EPA/OGC), Venus S. (EPA, OECA), Finman H. (EPA/OAP), Moore P. (Georgia Pacific Corp.), Berkeley T. (VA Dept. of Env. Quality), and Huber C. (US. Forest Service). Transmittal of draft site specific rule for comment. [A-2000-42-II-F-2]","document_id":"EPA-HQ-OAR-2004-0049-0010"},{"title":"Note with attachments from Beck D. (EPA/OPEI) to Donohue S. (EPA Region III), Moore P. (Georgia Pacific Corp.), and Berkeley T. (VA Dept. of Env. Quality). Transmittal of initial draft of site specific rule for comment [A-2000-42-II-F-1]","document_id":"EPA-HQ-OAR-2004-0049-0009"},{"title":"Note with attachments fi-om Beck D. (EPA/OPEI) to Donohue S. (EPA 2000 Region III), Telander Jeff (EPA/ OAQPS), Silverman S. (EPA/OGC), Venus S. (EPA, OECA), Finman H. (EPA/OAP), Moore P. (Georgia Pacific Corp.), Berkeley T. (VA Dept. of Env. Quality), and Huber C. (U.S. Forest Service). Transmittal of revised draft site-specific rule [A-2000-42-II-C-5]","document_id":"EPA-HQ-OAR-2004-0049-0008"},{"title":"Note with attachments fi-om Beck D. (EPA/OPEI) to Donohue S. (EPA Region III), Telander Jeff (EPA/AQPS), Silverman S. (EPA/OGC), Venus S. (EPA, OECA), Finman H. (EPA/OAP), Moore P. (Georgia Pacific Corp.), Berkeley T. (VA Dept. of Env. Quality), and Huber C. (U.S. Forest Service). Transmittal of draft site specific rule for comment. [A-2000-42-II-C-4]","document_id":"EPA-HQ-OAR-2004-0049-0007"},{"title":"Note with attachments from Beck D. (EPA/OPEI) to Donohue S. (EPA Region III), Moore P. (Georgia Pacific Corp.), and Berkeley T. (VA Dept. of Env. Quality). Transmittal of initial draft of site specific rule for comment [A-2000-42-II-C-3]","document_id":"EPA-HQ-OAR-2004-0049-0006"},{"title":"Letter from McCabe M., Regional Administrator EPA Region III, to 1999 Purdy P., Georgia Pacific Corporation. Acceptance of Georgia Pacific's proposal into the Project XL development phase. [A-2000-42-II-C-2]","document_id":"EPA-HQ-OAR-2004-0049-0005"},{"title":"Letter from Donohue S., EPA Region III to Moore P., Georgia Pacific Corp. Proposal questions/comments. [A-2000-42-II-C-1]","document_id":"EPA-HQ-OAR-2004-0049-0004"},{"title":"Legacy Index for Docket A-2000-42","document_id":"EPA-HQ-OAR-2004-0049-0001"}],"comments_count":0,"agency_id":"EPA","comments_url":"https://www.regulations.gov/docketBrowser?rpp=50&so=DESC&sb=postedDate&po=0&dct=PS&D=EPA-HQ-OAR-2004-0049","supporting_documents_count":10,"docket_id":"EPA-HQ-OAR-2004-0049","document_id":"EPA-HQ-OAR-2004-0049-0003","regulation_id_number":null,"title":"Project XL Site-Specific Rulemaking For Georgia-Pacific Corporation Facility in Big Island, Virginia","checked_regulationsdotgov_at":"2020-11-16T04:30:07Z"},"regulations_dot_gov_url":null,"significant":false,"signing_date":null,"start_page":16400,"subtype":null,"title":"Project XL Site-Specific Rulemaking for Georgia-Pacific Corporation's Facility in Big Island, VA","toc_doc":"Georgia-Pacific Corp. Facility, Big Island, VA","toc_subject":"Hazardous waste:","topics":["Air pollution control","Environmental protection","Hazardous substances","Intergovernmental relations","Reporting and recordkeeping requirements"],"type":"Rule","volume":66}