{"abstract":"EPA expressed some environmental concerns about the unavoidable project impacts to sensitive biological resources, but concluded the proposed mitigation plan should adequately address these losses in the long-term. ERP No. D-FHW-H40178-MO Rating EC2, I-64/US 40 Corridor, Reconstruction of the existing I-64/US 40 Facility with New Interchange Configurations and Roadway, Funding, City of St.Louis, St. Louis County, MO. Summary: EPA has environmental concerns regarding the proposed project on the basis of the degree of information provided to ensure compliance with section 4(f). EPA requests that consultation with the State HistoricalPreservation Officer (SHPO) be undertaken to identify appropriate mitigation measures for the properties that will be adversely impacted if the preferred alternative is selected. EPA also requests that identified Environmental Justice communities be evaluated for opportunities to reduce cumulative environmental and human health burdens through project implementation. ERP No. D-NRC-H06005-NE Rating EC2, GENERIC EIS--Fort Calhoun Station, Unit 1, Renewal of the Operating Licenses (OLs) for an Additional 20 Years, Supplement 12 (NUREG-1437)Omaha Public Power District, Washington County, NE. Summary: EPA expressed environmental concerns with the proposed re- licensing on the basis of the long (10 year) lead time before the current license expires. EPA recommended that the NRC improve cumulative effects information on current and future heat contributors to the Missouri River, and that NRC detail possible cooling strategies if faced with limited Missouri River assimilative capacity (heat) in the future. ERP No. DS-AFS-L65300-ID Rating LO, Goose Creek Watershed Project, Reviewing and Updating Information on the Pileated Woodpecker and Soil Impacts, Payette National Forest, New Meadows Ranger District, Adams County, ID. Summary: EPA has no concerns with the proposed action; however, EPA suggests including information on the potential cumulative effects of 5 other proposed timber sale projects on pileated woodpecker habitat within the National Forest. ERP No. DS-AFS-L65325-ID Rating LO, Sloan-Kennally Timber Sale Project, Reviewing and Updating Information on the Pileated Woodpecker and Soil Impacts, Payette National Forest, McCallRanger District, Adams County, ID. Summary: EPA has no significant concerns with the proposed action; however, EPA suggests including information on the potential cumulative effects of 5 other proposed timber sale projects on pileated woodpecker habitat within the National Forest. ERP No. DS-AFS-L65336-ID Rating LO, Brown Creek Timber Sale Project, Reviewing and Updating Information on the Pileated Woodpecker and Soil Impacts, Payette National Forest, New Meadow Ranger District, Adams County, ID. Summary: EPA expressed no concerns with the proposed action; however, EPA suggests including information on the potential cumulative effects of 5 other proposed projects on pileated woodpecker habitat within the National Forest. ERP No. DS-AFS-L65346-ID Rating LO, Middle Fork Weiser River Watershed Project, Reviewing and Updating Information on the Pileated Woodpecker and Soil Impacts, Payette National Forest, Council Ranger District, Adams County, ID. Summary: EPA has no concerns with the proposed action; however, EPA suggests including information on the potential cumulative effects of 5 other proposed timber sale projects on pileated woodpecker habitat within the National Forest. ERP No. DS-AFS-L65379-ID Rating LO, Little Weiser Landscape Vegetation Management Project, Reviewing and Updating Information on the Pileated Woodpecker and Soil Impacts, Payette National Forest, Adams County, ID. Summary: EPA has no concerns with the proposed action; however, EPA suggests including information on the potential cumulative effects of 5 other proposed timber sale projects on pileated woodpecker habitat within the National Forest.","action":null,"agencies":[{"raw_name":"ENVIRONMENTAL PROTECTION AGENCY","name":"Environmental Protection Agency","id":145,"url":"https://www.federalregister.gov/agencies/environmental-protection-agency","json_url":"https://www.federalregister.gov/api/v1/agencies/145","parent_id":null,"slug":"environmental-protection-agency"}],"body_html_url":"https://www.federalregister.gov/documents/full_text/html/2003/05/16/03-12350.html","cfr_references":[],"citation":"68 FR 26605","comment_url":null,"comments_close_on":null,"correction_of":null,"corrections":[],"dates":null,"disposition_notes":null,"docket_ids":["ER-FRL-6640-3"],"dockets":[],"document_number":"03-12350","effective_on":null,"end_page":26606,"executive_order_notes":null,"executive_order_number":null,"explanation":null,"full_text_xml_url":"https://www.federalregister.gov/documents/full_text/xml/2003/05/16/03-12350.xml","html_url":"https://www.federalregister.gov/documents/2003/05/16/03-12350/environmental-impact-statements-and-regulations-availability-of-epa-comments","images":{},"images_metadata":{},"json_url":"https://www.federalregister.gov/api/v1/documents/03-12350?publication_date=2003-05-16","mods_url":"https://www.govinfo.gov/metadata/granule/FR-2003-05-16/03-12350/mods.xml","not_received_for_publication":null,"page_length":2,"page_views":{"count":5,"last_updated":"2026-04-04 18:15:03 -0400"},"pdf_url":"https://www.govinfo.gov/content/pkg/FR-2003-05-16/pdf/03-12350.pdf","presidential_document_number":null,"proclamation_number":null,"public_inspection_pdf_url":null,"publication_date":"2003-05-16","raw_text_url":"https://www.federalregister.gov/documents/full_text/text/2003/05/16/03-12350.txt","regulation_id_number_info":{},"regulation_id_numbers":[],"regulations_dot_gov_info":{},"regulations_dot_gov_url":null,"significant":null,"signing_date":null,"start_page":26605,"subtype":null,"title":"Environmental Impact Statements and Regulations; Availability of EPA Comments","toc_doc":"Comment availability","toc_subject":"Environmental statements; availability, etc.:","topics":[],"type":"Notice","volume":68}