{"abstract":"The Deputy Secretary of Energy confirmed and approved Rate Order No. WAPA-119 and Rate Schedule SNF-6, placing a non-firm power formula rate from the Stampede Powerplant of the Washoe Project (Stampede) of the Western Area Power Administration (Western) into effect on an interim basis. The provisional formula rate will be in effect until the Federal Energy Regulatory Commission (Commission) confirms, approves, and places it into effect on a final basis or until replaced by other rates. The provisional rate will provide sufficient revenue to pay all annual costs, including interest expense, and repay power investment and irrigation aid, within the allowable periods.","action":"Notice of order concerning a non-firm power formula rate.","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Western Area Power Administration","name":"Western Area Power Administration","id":525,"url":"https://www.federalregister.gov/agencies/western-area-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/525","parent_id":136,"slug":"western-area-power-administration"}],"body_html_url":"https://www.federalregister.gov/documents/full_text/html/2005/08/29/05-17106.html","cfr_references":[],"citation":"70 FR 51035","comment_url":null,"comments_close_on":null,"correction_of":null,"corrections":[],"dates":"Rate Schedule SNF-6 will be placed into effect on an interim basis on the first day of the first full billing period beginning on or after October 1, 2005, and will be in effect until the Commission confirms, approves, and places the rate schedule in effect on a final basis through September 30, 2010, or until the rate schedule is superseded.","disposition_notes":null,"docket_ids":["Rate Order No. WAPA-119"],"dockets":[],"document_number":"05-17106","effective_on":"2005-10-01","end_page":51040,"executive_order_notes":null,"executive_order_number":null,"explanation":null,"full_text_xml_url":"https://www.federalregister.gov/documents/full_text/xml/2005/08/29/05-17106.xml","html_url":"https://www.federalregister.gov/documents/2005/08/29/05-17106/washoe-project-rate-order-no-wapa-119","images":{},"images_metadata":{},"json_url":"https://www.federalregister.gov/api/v1/documents/05-17106?publication_date=2005-08-29","mods_url":"https://www.govinfo.gov/metadata/granule/FR-2005-08-29/05-17106/mods.xml","not_received_for_publication":null,"page_length":6,"page_views":{"count":23,"last_updated":"2026-04-04 16:15:04 -0400"},"pdf_url":"https://www.govinfo.gov/content/pkg/FR-2005-08-29/pdf/05-17106.pdf","presidential_document_number":null,"proclamation_number":null,"public_inspection_pdf_url":null,"publication_date":"2005-08-29","raw_text_url":"https://www.federalregister.gov/documents/full_text/text/2005/08/29/05-17106.txt","regulation_id_number_info":{},"regulation_id_numbers":[],"regulations_dot_gov_info":{"checked_regulationsdotgov_at":"2011-11-12T17:04:53Z"},"regulations_dot_gov_url":null,"significant":null,"signing_date":null,"start_page":51035,"subtype":null,"title":"Washoe Project-Rate Order No. WAPA-119","toc_doc":"Washoe Project","toc_subject":"Power rates:","topics":[],"type":"Notice","volume":70}