{"abstract":"The U.S. Department of Energy (DOE) gives notice of the decision and order (Case No. RF-015) that grants to the General Electric Company (GE) a waiver from the DOE electric refrigerator and refrigerator-freezer test procedure for certain basic models containing relative humidity sensors and adaptive control anti-sweat heaters. Under today's decision and order, GE shall be required to test and rate its refrigerator-freezers with relative humidity sensors and adaptive control anti-sweat heaters using an alternate test procedure that takes this technology into account when measuring energy consumption.","action":"Decision and Order.","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Office of Energy Efficiency and Renewable Energy","name":"Energy Efficiency and Renewable Energy Office","id":137,"url":"https://www.federalregister.gov/agencies/energy-efficiency-and-renewable-energy-office","json_url":"https://www.federalregister.gov/api/v1/agencies/137","parent_id":136,"slug":"energy-efficiency-and-renewable-energy-office"}],"body_html_url":"https://www.federalregister.gov/documents/full_text/html/2010/08/19/2010-20575.html","cfr_references":[],"citation":"75 FR 51262","comment_url":null,"comments_close_on":null,"correction_of":null,"corrections":[],"dates":"This Decision and Order is effective August 19, 2010.","disposition_notes":null,"docket_ids":["Case No. RF-015"],"dockets":[],"document_number":"2010-20575","effective_on":"2010-08-19","end_page":51264,"executive_order_notes":null,"executive_order_number":null,"explanation":null,"full_text_xml_url":"https://www.federalregister.gov/documents/full_text/xml/2010/08/19/2010-20575.xml","html_url":"https://www.federalregister.gov/documents/2010/08/19/2010-20575/energy-conservation-program-for-consumer-products-decision-and-order-granting-a-waiver-to-ge-from","images":{},"images_metadata":{},"json_url":"https://www.federalregister.gov/api/v1/documents/2010-20575?publication_date=2010-08-19","mods_url":"https://www.govinfo.gov/metadata/granule/FR-2010-08-19/2010-20575/mods.xml","not_received_for_publication":null,"page_length":3,"page_views":{"count":59,"last_updated":"2026-04-04 16:15:04 -0400"},"pdf_url":"https://www.govinfo.gov/content/pkg/FR-2010-08-19/pdf/2010-20575.pdf","presidential_document_number":null,"proclamation_number":null,"public_inspection_pdf_url":null,"publication_date":"2010-08-19","raw_text_url":"https://www.federalregister.gov/documents/full_text/text/2010/08/19/2010-20575.txt","regulation_id_number_info":{},"regulation_id_numbers":[],"regulations_dot_gov_info":{"checked_regulationsdotgov_at":"2010-09-08T11:09:51Z"},"regulations_dot_gov_url":null,"significant":null,"signing_date":null,"start_page":51262,"subtype":null,"title":"Energy Conservation Program for Consumer Products: Decision and Order Granting a Waiver to GE From the Department of Energy Residential Refrigerator and Refrigerator-Freezer Test Procedure","toc_doc":"GE from the Department of Energy Residential Refrigerator and RefrigeratorFreezer Test Procedure","toc_subject":"Energy Conservation Program for Consumer Products; Waivers:","topics":[],"type":"Notice","volume":75}