{"abstract":"The U.S. Nuclear Regulatory Commission (NRC or the Commission) is publishing the final regulatory basis for rulemaking to streamline non-power reactor license renewal. This final regulatory basis incorporates input from the public, licensees, certificate holders, and other stakeholders provided during the public comment period that ended July 31, 2012. This regulatory basis provides the technical basis to support proceeding with rulemaking to streamline and enhance the Research and Test Reactor (RTR) License Renewal Process. This contemplated rulemaking also recommends conforming changes to address technical issues in existing non-power reactor regulations. The NRC has developed a final technical basis for this proposed rulemaking that describes the agency's overall objectives, conceptual approaches, potential solutions, integration with agency strategic goals, and related technical and regulatory clarity issues.","action":"Final regulatory basis; availability of rulemaking documents.","agencies":[{"raw_name":"NUCLEAR REGULATORY COMMISSION","name":"Nuclear Regulatory Commission","id":383,"url":"https://www.federalregister.gov/agencies/nuclear-regulatory-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/383","parent_id":null,"slug":"nuclear-regulatory-commission"}],"body_html_url":"https://www.federalregister.gov/documents/full_text/html/2012/10/02/2012-24221.html","cfr_references":[{"chapter":null,"citation_url":null,"part":50,"title":10}],"citation":"77 FR 60039","comment_url":null,"comments_close_on":null,"correction_of":null,"corrections":[],"dates":null,"disposition_notes":null,"docket_ids":["NRC-2011-0087"],"dockets":[{"supporting_documents":[{"title":"Enclosure to SRM-M240904: Edits to the Federal Register Notice, dated September 4, 2024","document_id":"NRC-2011-0087-0056"},{"title":"Memo - SRM-M240904: Affirmation Session for SECY-19-0062: “Final Rule: Non-power Production or Utilization Facility License Renewal,” dated September 4, 2024","document_id":"NRC-2011-0087-0055"},{"title":"Transcript – SRM-M240904: Affirmation Session for SECY-19-0062: “Final Rule: Non-power Production or Utilization Facility License Renewal,” dated September 4, 2024","document_id":"NRC-2011-0087-0054"},{"title":"April 25, 2019, NRC Staff Presentation","document_id":"NRC-2011-0087-0053"},{"title":"April 25, 2019, Meeting Transcript","document_id":"NRC-2011-0087-0052"},{"title":"April 25, 2019, Meeting Summary","document_id":"NRC-2011-0087-0051"},{"title":"April 25, 2019, Meeting Announcement and Agenda","document_id":"NRC-2011-0087-0050"},{"title":"SECY-19-0062 Enclosure 3 - Draft Final Rule:  Non-power Production or Utilization Facility License Renewal - Environmental Analysis","document_id":"NRC-2011-0087-0049"},{"title":"SECY-19-0062:  Enclosure 2 - Draft Final Rule:  Non-power Production or Utilization Facility License Renewal - Regulatory Analysis","document_id":"NRC-2011-0087-0048"},{"title":"SECY-19-0062:  Enclosure 1 - Draft Final Rule:  Non-power Production or Utilization Facility License Renewal - Federal Register Notice","document_id":"NRC-2011-0087-0047"}],"agency_name":"NRC","documents":[{"comment_count":null,"comment_start_date":null,"updated_at":"2025-05-22T03:38:05.168-04:00","comment_url":"https://www.regulations.gov/commenton/NRC-2011-0087-0008","allow_late_comments":false,"id":"NRC-2011-0087-0008","comment_end_date":null,"regulations_dot_gov_open_for_comment":false}],"supporting_documents_count":30,"id":"NRC-2011-0087","title":"Non-power Production or Utilization Facility License Renewal"}],"document_number":"2012-24221","effective_on":null,"end_page":60040,"executive_order_notes":null,"executive_order_number":null,"full_text_xml_url":"https://www.federalregister.gov/documents/full_text/xml/2012/10/02/2012-24221.xml","html_url":"https://www.federalregister.gov/documents/2012/10/02/2012-24221/non-power-reactor-license-renewal","images":{},"images_metadata":{},"json_url":"https://www.federalregister.gov/api/v1/documents/2012-24221?publication_date=2012-10-02","mods_url":"https://www.govinfo.gov/metadata/granule/FR-2012-10-02/2012-24221/mods.xml","not_received_for_publication":null,"page_length":2,"page_views":{"count":69,"last_updated":"2026-08-24 18:15:04 -0400"},"pdf_url":"https://www.govinfo.gov/content/pkg/FR-2012-10-02/pdf/2012-24221.pdf","presidential_document_number":null,"proclamation_number":null,"public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2012-24221.pdf?1349124491","publication_date":"2012-10-02","raw_text_url":"https://www.federalregister.gov/documents/full_text/text/2012/10/02/2012-24221.txt","regulation_id_number_info":{"3150-AI96":{"issue":"202410","html_url":"https://www.federalregister.gov/regulations/3150-AI96/non-power-production-or-utilization-facility-license-renewal-nrc-2011-0087-","title":"Non-Power Production or Utilization Facility License Renewal [NRC-2011-0087]","xml_url":"http://www.reginfo.gov/public/do/eAgendaViewRule?pubId=202410&RIN=3150-AI96&operation=OPERATION_EXPORT_XML","priority_category":"Substantive, Nonsignificant"}},"regulation_id_numbers":["3150-AI96"],"regulations_dot_gov_info":{"supporting_documents":[{"title":"Enclosure to SRM-M240904: Edits to the Federal Register Notice, dated September 4, 2024","document_id":"NRC-2011-0087-0056"},{"title":"Memo - SRM-M240904: Affirmation Session for SECY-19-0062: “Final Rule: Non-power Production or Utilization Facility License Renewal,” dated September 4, 2024","document_id":"NRC-2011-0087-0055"},{"title":"Transcript – SRM-M240904: Affirmation Session for SECY-19-0062: “Final Rule: Non-power Production or Utilization Facility License Renewal,” dated September 4, 2024","document_id":"NRC-2011-0087-0054"},{"title":"April 25, 2019, NRC Staff Presentation","document_id":"NRC-2011-0087-0053"},{"title":"April 25, 2019, Meeting Transcript","document_id":"NRC-2011-0087-0052"},{"title":"April 25, 2019, Meeting Summary","document_id":"NRC-2011-0087-0051"},{"title":"April 25, 2019, Meeting Announcement and Agenda","document_id":"NRC-2011-0087-0050"},{"title":"SECY-19-0062 Enclosure 3 - Draft Final Rule:  Non-power Production or Utilization Facility License Renewal - Environmental Analysis","document_id":"NRC-2011-0087-0049"},{"title":"SECY-19-0062:  Enclosure 2 - Draft Final Rule:  Non-power Production or Utilization Facility License Renewal - Regulatory Analysis","document_id":"NRC-2011-0087-0048"},{"title":"SECY-19-0062:  Enclosure 1 - Draft Final Rule:  Non-power Production or Utilization Facility License Renewal - Federal Register Notice","document_id":"NRC-2011-0087-0047"}],"regulatory_plan":{"html_url":"https://www.federalregister.gov/regulations/3150-AI96/non-power-production-or-utilization-facility-license-renewal-nrc-2011-0087-","title":"Non-Power Production or Utilization Facility License Renewal [NRC-2011-0087]"},"comments_count":0,"agency_id":"NRC","comments_url":"https://www.regulations.gov/docketBrowser?rpp=50&so=DESC&sb=postedDate&po=0&dct=PS&D=NRC-2011-0087","supporting_documents_count":30,"docket_id":"NRC-2011-0087","document_id":"NRC-2011-0087-0008","regulation_id_number":"3150-AI96","title":"Non-power Production or Utilization Facility License Renewal","checked_regulationsdotgov_at":"2025-05-22T07:55:05Z"},"regulations_dot_gov_url":null,"significant":false,"signing_date":null,"start_page":60039,"subtype":null,"title":"Non-Power Reactor License Renewal","toc_doc":"Non-Power Reactor License Renewal","toc_subject":null,"topics":[],"type":"Rule","volume":77}