{"abstract":"Pursuant to section 215 of the Federal Power Act, the Commission approves Reliability Standard PRC-023-2 (Transmission Relay Loadability) submitted by the North American Electric Reliability Corporation (NERC), the Electric Reliability Organization certified by the Commission. The Reliability Standard requires transmission owners, generation owners, and distribution providers to set load-responsive phase protective relays according to specific criteria to ensure that the relays reliably detect--and protect the electric network from-- fault conditions, but do not limit transmission loadability or interfere with system operators' ability to protect system reliability. The Commission also approves NERC Rules of Procedure Section 1700-- Challenges to Determinations, which provides registered entities a means to challenge determinations made by planning coordinators under Reliability Standard PRC-023.","action":"Final rule.","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Federal Energy Regulatory Commission","name":"Federal Energy Regulatory Commission","id":167,"url":"https://www.federalregister.gov/agencies/federal-energy-regulatory-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/167","parent_id":136,"slug":"federal-energy-regulatory-commission"}],"body_html_url":"https://www.federalregister.gov/documents/full_text/html/2012/03/21/2012-6758.html","cfr_references":[{"chapter":null,"citation_url":null,"part":39,"title":18},{"chapter":null,"citation_url":null,"part":40,"title":18}],"citation":"77 FR 16435","comment_url":null,"comments_close_on":null,"correction_of":null,"corrections":[],"dates":"Effective Date: This rule will become effective May 7, 2012.","disposition_notes":null,"docket_ids":["Docket No. RM11-16-000","Order No. 759"],"dockets":[],"document_number":"2012-6758","effective_on":"2012-05-07","end_page":16447,"executive_order_notes":null,"executive_order_number":null,"full_text_xml_url":"https://www.federalregister.gov/documents/full_text/xml/2012/03/21/2012-6758.xml","html_url":"https://www.federalregister.gov/documents/2012/03/21/2012-6758/transmission-relay-loadability-reliability-standard","images":{},"images_metadata":{},"json_url":"https://www.federalregister.gov/api/v1/documents/2012-6758?publication_date=2012-03-21","mods_url":"https://www.govinfo.gov/metadata/granule/FR-2012-03-21/2012-6758/mods.xml","not_received_for_publication":null,"page_length":13,"page_views":{"count":372,"last_updated":"2026-11-24 04:15:03 -0500"},"pdf_url":"https://www.govinfo.gov/content/pkg/FR-2012-03-21/pdf/2012-6758.pdf","presidential_document_number":null,"proclamation_number":null,"public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2012-06758.pdf?1332247754","publication_date":"2012-03-21","raw_text_url":"https://www.federalregister.gov/documents/full_text/text/2012/03/21/2012-6758.txt","regulation_id_number_info":{},"regulation_id_numbers":[],"regulations_dot_gov_info":{"supporting_documents":[],"comments_url":"https://www.regulations.gov/docketBrowser?rpp=50&so=DESC&sb=postedDate&po=0&dct=PS&D=FERC-2012-0515","supporting_documents_count":0,"docket_id":"FERC-2012-0515","regulation_id_number":null,"title":"Transmission Relay Loadability Reliability Standard","checked_regulationsdotgov_at":"2012-04-27T21:51:55Z"},"regulations_dot_gov_url":null,"significant":null,"signing_date":null,"start_page":16435,"subtype":null,"title":"Transmission Relay Loadability Reliability Standard","toc_doc":"Transmission Relay Loadability Reliability Standard","toc_subject":null,"topics":[],"type":"Rule","volume":77}