{"abstract":"The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of amendments to Renewed Facility Operating License Nos. DPR- 44 and DPR-56, issued to Exelon Generation Company, LLC (Exelon, the licensee), for operation of the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, located in York and Lancaster Counties, Pennsylvania. The proposed amendments would authorize an increase in the maximum reactor power level from 3514 megawatts thermal (MWt) to 3951 MWt. The NRC staff is issuing a final Environmental Assessment (EA) and final Finding of No Significant Impact (FONSI) associated with the proposed license amendments.","action":"Environmental assessment and finding of no significant impact; issuance.","agencies":[{"raw_name":"NUCLEAR REGULATORY COMMISSION","name":"Nuclear Regulatory Commission","id":383,"url":"https://www.federalregister.gov/agencies/nuclear-regulatory-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/383","parent_id":null,"slug":"nuclear-regulatory-commission"}],"body_html_url":"https://www.federalregister.gov/documents/full_text/html/2014/03/31/2014-07132.html","cfr_references":[],"citation":"79 FR 18073","comment_url":null,"comments_close_on":null,"correction_of":null,"corrections":[],"dates":null,"disposition_notes":null,"docket_ids":["Docket Nos. 50-277 and 50-278","NRC-2013-0232"],"dockets":[],"document_number":"2014-07132","effective_on":null,"end_page":18083,"executive_order_notes":null,"executive_order_number":null,"explanation":null,"full_text_xml_url":"https://www.federalregister.gov/documents/full_text/xml/2014/03/31/2014-07132.xml","html_url":"https://www.federalregister.gov/documents/2014/03/31/2014-07132/peach-bottom-atomic-power-station-units-2-and-3","images":{},"images_metadata":{},"json_url":"https://www.federalregister.gov/api/v1/documents/2014-07132?publication_date=2014-03-31","mods_url":"https://www.govinfo.gov/metadata/granule/FR-2014-03-31/2014-07132/mods.xml","not_received_for_publication":null,"page_length":11,"page_views":{"count":430,"last_updated":"2026-04-04 14:15:05 -0400"},"pdf_url":"https://www.govinfo.gov/content/pkg/FR-2014-03-31/pdf/2014-07132.pdf","presidential_document_number":null,"proclamation_number":null,"public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2014-07132.pdf?1396037186","publication_date":"2014-03-31","raw_text_url":"https://www.federalregister.gov/documents/full_text/text/2014/03/31/2014-07132.txt","regulation_id_number_info":{},"regulation_id_numbers":[],"regulations_dot_gov_info":{"supporting_documents":[],"comments_url":"https://www.regulations.gov/docketBrowser?rpp=50&so=DESC&sb=postedDate&po=0&dct=PS&D=NRC-2013-0232","supporting_documents_count":0,"docket_id":"NRC-2013-0232","regulation_id_number":null,"title":"Draft Environmental Assessment and Draft Finding of No Significant Impact","checked_regulationsdotgov_at":"2014-04-20T06:00:28Z"},"regulations_dot_gov_url":null,"significant":null,"signing_date":null,"start_page":18073,"subtype":null,"title":"Peach Bottom Atomic Power Station, Units 2 and 3","toc_doc":"Peach Bottom Atomic Power Station, Units 2 and 3","toc_subject":"Environmental Assessments; Availability, etc.:","topics":[],"type":"Notice","volume":79}