{"abstract":"In accordance with the National Environmental Policy Act of 1969, as amended, and the Federal Land Policy and Management Act of 1976, as amended, the Bureau of Land Management (BLM) Vale District Office announces the availability of the Draft Environmental Impact Statement (EIS) and Land-Use Plan Amendments (LUPAs) for the Boardman to Hemingway Transmission Line Project (Project) and by this notice is announcing the opening of the public comment period.","action":"Notice of availability.","agencies":[{"raw_name":"DEPARTMENT OF THE INTERIOR","name":"Interior Department","id":253,"url":"https://www.federalregister.gov/agencies/interior-department","json_url":"https://www.federalregister.gov/api/v1/agencies/253","parent_id":null,"slug":"interior-department"},{"raw_name":"Bureau of Land Management","name":"Land Management Bureau","id":275,"url":"https://www.federalregister.gov/agencies/land-management-bureau","json_url":"https://www.federalregister.gov/api/v1/agencies/275","parent_id":253,"slug":"land-management-bureau"}],"body_html_url":"https://www.federalregister.gov/documents/full_text/html/2014/12/19/2014-29770.html","cfr_references":[],"citation":"79 FR 75834","comment_url":null,"comments_close_on":null,"correction_of":null,"corrections":[],"dates":"The Draft EIS is now available for public review. To be considered in the Final EIS, written comments on the Draft EIS must be received within 90 days after the Environmental Protection Agency's publication in the Federal Register of a Notice of Availability (NOA) of this Draft EIS.","disposition_notes":null,"docket_ids":["LLORV000.51010000.ER0000.LVRWH09H0480","OROR065375","IDI036029 HAG 14-0196"],"dockets":[],"document_number":"2014-29770","effective_on":null,"end_page":75836,"executive_order_notes":null,"executive_order_number":null,"explanation":null,"full_text_xml_url":"https://www.federalregister.gov/documents/full_text/xml/2014/12/19/2014-29770.xml","html_url":"https://www.federalregister.gov/documents/2014/12/19/2014-29770/notice-of-availability-of-the-draft-environmental-impact-statement-and-land-use-plan-amendments-for","images":{},"images_metadata":{},"json_url":"https://www.federalregister.gov/api/v1/documents/2014-29770?publication_date=2014-12-19","mods_url":"https://www.govinfo.gov/metadata/granule/FR-2014-12-19/2014-29770/mods.xml","not_received_for_publication":null,"page_length":3,"page_views":{"count":210,"last_updated":"2026-04-10 06:15:04 -0400"},"pdf_url":"https://www.govinfo.gov/content/pkg/FR-2014-12-19/pdf/2014-29770.pdf","presidential_document_number":null,"proclamation_number":null,"public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2014-29770.pdf?1418910620","publication_date":"2014-12-19","raw_text_url":"https://www.federalregister.gov/documents/full_text/text/2014/12/19/2014-29770.txt","regulation_id_number_info":{},"regulation_id_numbers":[],"regulations_dot_gov_info":{"checked_regulationsdotgov_at":"2015-01-12T19:22:17Z"},"regulations_dot_gov_url":null,"significant":null,"signing_date":null,"start_page":75834,"subtype":null,"title":"Notice of Availability of the Draft Environmental Impact Statement and Land-use Plan Amendments for the Boardman to Hemingway Transmission Line Project","toc_doc":"Boardman to Hemingway Transmission Line Project; Landuse Plan Amendments","toc_subject":"Environmental Impact Statements; Availability, etc.:","topics":[],"type":"Notice","volume":79}