{"abstract":"The Environmental Protection Agency (EPA) is partially approving and partially disapproving elements of a New Jersey State Implementation Plan (SIP) submittal pertaining to the infrastructure requirements of section 110(a)(1) and (2) of the Clean Air Act (CAA) for the 2008 Lead, 2008 Ozone, 2010 Nitrogen Dioxide (NO<INF>2</INF>), 2010 Sulfur Dioxide (SO<INF>2</INF>), 2011 Carbon Monoxide (CO), 2006 Particulate Matter of ten microns or less (PM<INF>10</INF>), and 2012 Particulate Matter of 2.5 microns or less (PM<INF>2.5</INF>) National Ambient Air Quality Standards (NAAQS). The infrastructure requirements are designed to ensure that the structural components of each state's air quality management program are adequate to meet the state's responsibilities under the CAA. This action pertains specifically to infrastructure requirements relating to interstate transport provisions concerning the Prevention of Significant Deterioration of Air Quality (PSD) regulations, and visibility protection.","action":"Final rule.","agencies":[{"raw_name":"ENVIRONMENTAL PROTECTION AGENCY","name":"Environmental Protection Agency","id":145,"url":"https://www.federalregister.gov/agencies/environmental-protection-agency","json_url":"https://www.federalregister.gov/api/v1/agencies/145","parent_id":null,"slug":"environmental-protection-agency"}],"body_html_url":"https://www.federalregister.gov/documents/full_text/html/2016/09/19/2016-22400.html","cfr_references":[{"chapter":null,"citation_url":null,"part":52,"title":40}],"citation":"81 FR 64070","comment_url":null,"comments_close_on":null,"correction_of":null,"corrections":[],"dates":"This rule is effective on October 19, 2016.","disposition_notes":null,"docket_ids":["EPA-R02-OAR-2016-0389","FRL-9952-41-Region 2"],"dockets":[],"document_number":"2016-22400","effective_on":"2016-10-19","end_page":64072,"executive_order_notes":null,"executive_order_number":null,"full_text_xml_url":"https://www.federalregister.gov/documents/full_text/xml/2016/09/19/2016-22400.xml","html_url":"https://www.federalregister.gov/documents/2016/09/19/2016-22400/partial-approval-and-partial-disapproval-of-air-quality-implementation-plans-nj-infrastructure-sip","images":{},"images_metadata":{},"json_url":"https://www.federalregister.gov/api/v1/documents/2016-22400?publication_date=2016-09-19","mods_url":"https://www.govinfo.gov/metadata/granule/FR-2016-09-19/2016-22400/mods.xml","not_received_for_publication":null,"page_length":3,"page_views":{"count":101,"last_updated":"2026-11-22 10:15:04 -0500"},"pdf_url":"https://www.govinfo.gov/content/pkg/FR-2016-09-19/pdf/2016-22400.pdf","presidential_document_number":null,"proclamation_number":null,"public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2016-22400.pdf?1474029938","publication_date":"2016-09-19","raw_text_url":"https://www.federalregister.gov/documents/full_text/text/2016/09/19/2016-22400.txt","regulation_id_number_info":{},"regulation_id_numbers":[],"regulations_dot_gov_info":{"supporting_documents":[{"title":"NJ Regional Haze Plan Approval","document_id":"EPA-R02-OAR-2016-0389-0017"},{"title":"Final Appendix L - NJ Section 110 SIP","document_id":"EPA-R02-OAR-2016-0389-0016"},{"title":"Final Appendix K - NJ Section 110 SIP","document_id":"EPA-R02-OAR-2016-0389-0015"},{"title":"Final Appendix J - NJ Section 110 SIP","document_id":"EPA-R02-OAR-2016-0389-0014"},{"title":"Final Appendix I - NJ Section 110 SIP","document_id":"EPA-R02-OAR-2016-0389-0013"},{"title":"Final Appendix H - NJ Section 110 SIP","document_id":"EPA-R02-OAR-2016-0389-0012"},{"title":"Final Appendix G - NJ Section 110 SIP","document_id":"EPA-R02-OAR-2016-0389-0011"},{"title":"Final Appendix F - NJ Section 110 SIP","document_id":"EPA-R02-OAR-2016-0389-0010"},{"title":"Final Appendix E - NJ Section 110 SIP","document_id":"EPA-R02-OAR-2016-0389-0009"},{"title":"Final Appendix D - NJ Section 110 SIP","document_id":"EPA-R02-OAR-2016-0389-0008"}],"comments_url":"https://www.regulations.gov/docketBrowser?rpp=50&so=DESC&sb=postedDate&po=0&dct=PS&D=EPA-R02-OAR-2016-0389","supporting_documents_count":17,"docket_id":"EPA-R02-OAR-2016-0389","regulation_id_number":null,"title":"Partial Approval and Partial Disapproval of Air Quality\nImplementation Plans; NJ;\nInfrastructure SIP Requirements for 2008 Lead, 2008 Ozone, 2010 Nitrogen Dioxide, 2010 Sulfur Dioxide, and 2012 PM2.5, 2006 PM10 and 2011 Carbon Monoxide NAAQS: Interstate Transport\nProvisions","checked_regulationsdotgov_at":"2016-10-09T06:00:20Z"},"regulations_dot_gov_url":null,"significant":null,"signing_date":null,"start_page":64070,"subtype":null,"title":"Partial Approval and Partial Disapproval of Air Quality Implementation Plans; NJ; Infrastructure SIP Requirements for 2008 Lead, 2008 Ozone, 2010 Nitrogen Dioxide, 2010 Sulfur Dioxide, and 2012 PM2.5, 2006 PM10 and 2011 Carbon Monoxide NAAQS: Interstate Transport Provisions","toc_doc":"New Jersey; Infrastructure SIP Requirements for 2008 Lead, 2008 Ozone, 2010 Nitrogen Dioxide, etc.","toc_subject":"Air Quality State Implementation Plans; Approvals and Promulgations:","topics":["Air pollution control","Carbon monoxide","Environmental protection","Incorporation by reference","Intergovernmental relations","Lead","Nitrogen dioxide","Ozone","Particulate matter","Volatile organic compounds"],"type":"Rule","volume":81}