{"abstract":"In compliance with the National Environmental Policy Act of 1969 (NEPA), as amended, and the Federal Land Policy and Management Act of 1976 (FLPMA), as amended, the Bureau of Land Management (BLM), Arizona State Office, Phoenix, Arizona, has prepared a Draft Environmental Impact Statement (EIS) for the proposed Ten West Link 500-kilovolt (kV) Transmission Line Project (Project) and Draft Resource Management Plan (RMP) Amendments to the Yuma Field Office RMP and the California Desert Conservation Area Plan. By this notice, the BLM is announcing the opening of the public comment period on the Draft EIS/Draft RMP Amendments.","action":"Notice of availability.","agencies":[{"raw_name":"DEPARTMENT OF THE INTERIOR","name":"Interior Department","id":253,"url":"https://www.federalregister.gov/agencies/interior-department","json_url":"https://www.federalregister.gov/api/v1/agencies/253","parent_id":null,"slug":"interior-department"},{"raw_name":"Bureau of Land Management","name":"Land Management Bureau","id":275,"url":"https://www.federalregister.gov/agencies/land-management-bureau","json_url":"https://www.federalregister.gov/api/v1/agencies/275","parent_id":253,"slug":"land-management-bureau"}],"body_html_url":"https://www.federalregister.gov/documents/full_text/html/2018/08/31/2018-18721.html","cfr_references":[],"citation":"83 FR 44660","comment_url":null,"comments_close_on":null,"correction_of":null,"corrections":[],"dates":"To ensure that comments will be considered, the BLM must receive written comments on the Draft EIS and Draft RMP Amendments within 90 days following the date the Environmental Protection Agency publishes its Notice of Availability in the Federal Register. The date(s) and location(s) of public meetings will be announced at least 15 days in advance through local media, newspapers, and the BLM website at: http:/ /www.blm.gov/az/st/en.html.","disposition_notes":null,"docket_ids":["LLAZ920000 18X L51010000.ER0000 LVRWA18A3240"],"dockets":[],"document_number":"2018-18721","effective_on":null,"end_page":44661,"executive_order_notes":null,"executive_order_number":null,"explanation":null,"full_text_xml_url":"https://www.federalregister.gov/documents/full_text/xml/2018/08/31/2018-18721.xml","html_url":"https://www.federalregister.gov/documents/2018/08/31/2018-18721/notice-of-availability-for-the-draft-environmental-impact-statement-for-the-proposed-ten-west-link","images":{},"images_metadata":{},"json_url":"https://www.federalregister.gov/api/v1/documents/2018-18721?publication_date=2018-08-31","mods_url":"https://www.govinfo.gov/metadata/granule/FR-2018-08-31/2018-18721/mods.xml","not_received_for_publication":null,"page_length":2,"page_views":{"count":194,"last_updated":"2026-04-25 10:15:04 -0400"},"pdf_url":"https://www.govinfo.gov/content/pkg/FR-2018-08-31/pdf/2018-18721.pdf","presidential_document_number":null,"proclamation_number":null,"public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2018-18721.pdf?1535633117","publication_date":"2018-08-31","raw_text_url":"https://www.federalregister.gov/documents/full_text/text/2018/08/31/2018-18721.txt","regulation_id_number_info":{},"regulation_id_numbers":[],"regulations_dot_gov_info":{"checked_regulationsdotgov_at":"2018-09-20T10:00:32Z"},"regulations_dot_gov_url":null,"significant":null,"signing_date":null,"start_page":44660,"subtype":null,"title":"Notice of Availability for the Draft Environmental Impact Statement for the Proposed Ten West Link 500-Kilovolt Transmission Line Project and Draft Amendments to the Yuma Field Office Resource Management Plan and the California Desert Conservation Area Plan; Maricopa and La Paz Counties, Arizona, and Riverside County, California","toc_doc":"Proposed Ten West Link 500-Kilovolt Transmission Line Project and Draft Amendments to Yuma Field Office Resource Management Plan and California Desert Conservation Area Plan; Maricopa and La Paz Counties, AZ, and Riverside County, CA","toc_subject":"Environmental Impact Statements; Availability, etc.:","topics":[],"type":"Notice","volume":83}