{"abstract":"The Seven County Infrastructure Coalition (Coalition) intends to seek Board approval to construct and operate an approximately 85- mile rail line between the Uinta Basin in northeastern Utah and an existing rail line near Kyune, Utah. On June 19, 2019, the Board's Office of Environmental Analysis (OEA) issued a Notice of Intent to Prepare an EIS and a Notice of Availability of the Draft Scope of Study (Draft Scope), pursuant to National Environmental Policy Act (NEPA). OEA requested comments on the Draft Scope from federal, state, and local agencies; tribes; other interested stakeholders; and the public during the public scoping period and held six public meetings in the project area. After review and consideration of all comments received, this notice sets forth the Final Scope of Study (Final Scope) of the EIS. The Final Scope reflects additions and changes to the Draft Scope as a result of comments received during the scoping comment period. The Final Scope also summarizes and addresses the principal environmental concerns raised by the comments on the Draft Scope and explains if and how these issues will be addressed in the EIS.","action":"Notice of Availability of the Final Scope of Study for the Environmental Impact Statement (EIS).","agencies":[{"raw_name":"SURFACE TRANSPORTATION BOARD","name":"Surface Transportation Board","id":481,"url":"https://www.federalregister.gov/agencies/surface-transportation-board","json_url":"https://www.federalregister.gov/api/v1/agencies/481","parent_id":null,"slug":"surface-transportation-board"}],"body_html_url":"https://www.federalregister.gov/documents/full_text/html/2019/12/13/2019-26878.html","cfr_references":[],"citation":"84 FR 68274","comment_url":null,"comments_close_on":null,"correction_of":null,"corrections":[],"dates":null,"disposition_notes":null,"docket_ids":["Docket No. FD 36284"],"dockets":[],"document_number":"2019-26878","effective_on":null,"end_page":68283,"executive_order_notes":null,"executive_order_number":null,"full_text_xml_url":"https://www.federalregister.gov/documents/full_text/xml/2019/12/13/2019-26878.xml","html_url":"https://www.federalregister.gov/documents/2019/12/13/2019-26878/seven-county-infrastructure-coalition-rail-construction-and-operation-in-utah-carbon-duchesne-and","images":{},"images_metadata":{},"json_url":"https://www.federalregister.gov/api/v1/documents/2019-26878?publication_date=2019-12-13","mods_url":"https://www.govinfo.gov/metadata/granule/FR-2019-12-13/2019-26878/mods.xml","not_received_for_publication":null,"page_length":10,"page_views":{"count":438,"last_updated":"2026-11-24 00:15:03 -0500"},"pdf_url":"https://www.govinfo.gov/content/pkg/FR-2019-12-13/pdf/2019-26878.pdf","presidential_document_number":null,"proclamation_number":null,"public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2019-26878.pdf?1576158322","publication_date":"2019-12-13","raw_text_url":"https://www.federalregister.gov/documents/full_text/text/2019/12/13/2019-26878.txt","regulation_id_number_info":{},"regulation_id_numbers":[],"regulations_dot_gov_info":{"checked_regulationsdotgov_at":"2019-12-16T04:30:08Z"},"regulations_dot_gov_url":null,"significant":null,"signing_date":null,"start_page":68274,"subtype":null,"title":"Seven County Infrastructure Coalition-Rail Construction & Operation-in Utah, Carbon, Duchesne, and Uintah Counties, Utah","toc_doc":"Seven County Infrastructure Coalition; Utah, Carbon, Duchesne, and Uintah Counties, UT","toc_subject":"Rail Construction and Operation:\n","topics":[],"type":"Notice","volume":84}