{"abstract":"This document responds to a joint Petition for Reconsideration (Petition) that was submitted on October 31, 2019, by the American Gas Association, the American Petroleum Institute, the American Public Gas Association, and the Interstate Natural Gas Association of America (the Associations). In the Petition, the Associations requested that PHMSA amend the final rule titled \"Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments\" (Gas Transmission Final Rule) published in the Federal Register on October 1, 2019. In response to the Petition, PHMSA is amending the Gas Transmission Final Rule to address the requirements for recordkeeping and the applicability of maximum allowable operating pressure (MAOP) reconfirmation. The amendments are intended to clarify the regulatory requirements identified in the Petition without adversely affecting safety.","action":"Final rule; petition for reconsideration.","agencies":[{"raw_name":"DEPARTMENT OF TRANSPORTATION","name":"Transportation Department","id":492,"url":"https://www.federalregister.gov/agencies/transportation-department","json_url":"https://www.federalregister.gov/api/v1/agencies/492","parent_id":null,"slug":"transportation-department"},{"raw_name":"Pipeline and Hazardous Materials Safety Administration","name":"Pipeline and Hazardous Materials Safety Administration","id":408,"url":"https://www.federalregister.gov/agencies/pipeline-and-hazardous-materials-safety-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/408","parent_id":492,"slug":"pipeline-and-hazardous-materials-safety-administration"}],"body_html_url":"https://www.federalregister.gov/documents/full_text/html/2020/07/06/2020-14403.html","cfr_references":[{"chapter":null,"citation_url":null,"part":"192","title":49}],"citation":"85 FR 40132","comment_url":null,"comments_close_on":null,"correction_of":null,"corrections":[],"dates":"The effective date of this rule is July 1, 2020.","disposition_notes":null,"docket_ids":["Docket No. PHMSA-2011-0023","Amdt. No. 192-127"],"dockets":[{"supporting_documents":[{"title":"6. BLS wage information May 2021","document_id":"PHMSA-2011-0023-0626"},{"title":"S. Rep. No. 104-334","document_id":"PHMSA-2011-0023-0621"},{"title":"Ryan Emmanuel Report","document_id":"PHMSA-2011-0023-0620"},{"title":"PL 112-90","document_id":"PHMSA-2011-0023-0617"},{"title":"Pine Wave and Silver Hill Article","document_id":"PHMSA-2011-0023-0614"},{"title":"PHMSA-RSPA-1998-4868-0175_attachment_1","document_id":"PHMSA-2011-0023-0607"},{"title":"PHMSA-RSPA-1998-4868-0140_attachment_1","document_id":"PHMSA-2011-0023-0602"},{"title":"PHMSA-2018-0046-0065_content","document_id":"PHMSA-2011-0023-0597"},{"title":"NTSB Sissonville WV Accident Report","document_id":"PHMSA-2011-0023-0593"},{"title":"NTSB- Firestone CO Accident Report","document_id":"PHMSA-2011-0023-0592"}],"agency_name":"PHMSA","documents":[{"comment_count":0,"comment_start_date":"2020-07-06","updated_at":"2023-03-01T14:07:08.270-05:00","comment_url":"https://www.regulations.gov/commenton/PHMSA-2011-0023-0478","allow_late_comments":null,"id":"PHMSA-2011-0023-0478","comment_end_date":null,"regulations_dot_gov_open_for_comment":false}],"supporting_documents_count":149,"id":"PHMSA-2011-0023","title":"Pipeline Safety:  Safety of Gas Transmission Pipelines"}],"document_number":"2020-14403","effective_on":"2020-07-01","end_page":40134,"executive_order_notes":null,"executive_order_number":null,"full_text_xml_url":"https://www.federalregister.gov/documents/full_text/xml/2020/07/06/2020-14403.xml","html_url":"https://www.federalregister.gov/documents/2020/07/06/2020-14403/pipeline-safety-safety-of-gas-transmission-pipelines-maop-reconfirmation-expansion-of-assessment","images":{},"images_metadata":{},"json_url":"https://www.federalregister.gov/api/v1/documents/2020-14403?publication_date=2020-07-06","mods_url":"https://www.govinfo.gov/metadata/granule/FR-2020-07-06/2020-14403/mods.xml","not_received_for_publication":null,"page_length":3,"page_views":{"count":4252,"last_updated":"2026-11-22 20:15:07 -0500"},"pdf_url":"https://www.govinfo.gov/content/pkg/FR-2020-07-06/pdf/2020-14403.pdf","presidential_document_number":null,"proclamation_number":null,"public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2020-14403.pdf?1593616514","publication_date":"2020-07-06","raw_text_url":"https://www.federalregister.gov/documents/full_text/text/2020/07/06/2020-14403.txt","regulation_id_number_info":{"2137-AE72":{"issue":"201904","html_url":"https://www.federalregister.gov/regulations/2137-AE72/pipeline-safety-safety-of-gas-transmission-pipelines-maop-reconfirmation-expansion-of-assessment-req","title":"Pipeline Safety: Safety of Gas Transmission Pipelines, MAOP Reconfirmation, Expansion of Assessment Requirements and Other Related Amendments","xml_url":"http://www.reginfo.gov/public/do/eAgendaViewRule?pubId=201904&RIN=2137-AE72&operation=OPERATION_EXPORT_XML","priority_category":"Other Significant"}},"regulation_id_numbers":["2137-AE72"],"regulations_dot_gov_info":{"supporting_documents":[{"title":"6. BLS wage information May 2021","document_id":"PHMSA-2011-0023-0626"},{"title":"S. Rep. No. 104-334","document_id":"PHMSA-2011-0023-0621"},{"title":"Ryan Emmanuel Report","document_id":"PHMSA-2011-0023-0620"},{"title":"PL 112-90","document_id":"PHMSA-2011-0023-0617"},{"title":"Pine Wave and Silver Hill Article","document_id":"PHMSA-2011-0023-0614"},{"title":"PHMSA-RSPA-1998-4868-0175_attachment_1","document_id":"PHMSA-2011-0023-0607"},{"title":"PHMSA-RSPA-1998-4868-0140_attachment_1","document_id":"PHMSA-2011-0023-0602"},{"title":"PHMSA-2018-0046-0065_content","document_id":"PHMSA-2011-0023-0597"},{"title":"NTSB Sissonville WV Accident Report","document_id":"PHMSA-2011-0023-0593"},{"title":"NTSB- Firestone CO Accident Report","document_id":"PHMSA-2011-0023-0592"}],"comments_count":0,"agency_id":"PHMSA","comments_url":"https://www.regulations.gov/docketBrowser?rpp=50&so=DESC&sb=postedDate&po=0&dct=PS&D=PHMSA-2011-0023","supporting_documents_count":149,"docket_id":"PHMSA-2011-0023","document_id":"PHMSA-2011-0023-0478","regulation_id_number":null,"title":"Pipeline Safety:  Safety of Gas Transmission Pipelines","checked_regulationsdotgov_at":"2023-03-01T19:07:07Z"},"regulations_dot_gov_url":null,"significant":true,"signing_date":null,"start_page":40132,"subtype":null,"title":"Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments: Response to a Joint Petition for Reconsideration","toc_doc":"Maximum Allowable Operating Pressure Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments: Response to a Joint Petition for Reconsideration","toc_subject":"Pipeline Safety; Safety of Gas Transmission Pipelines:\n","topics":["Incorporation by reference","Pipeline safety"],"type":"Rule","volume":85}