{"abstract":"In accordance with the memorandum of January 20, 2021, from the Assistant to the President and Chief of Staff, titled \"Regulatory Freeze Pending Review,\" PHMSA delays the effective date of the final rule, \"Pipeline Safety: Gas Pipeline Regulatory Reform,\" until March 21, 2021. PHMSA also delays until March 21, 2021, its withdrawal of the March 26, 2019, \"Exercise of Enforcement Discretion Regarding Farm Taps\" and the unpublished October 27, 2015, letter to the Interstate Natural Gas Association of America announcing a stay of enforcement pertaining to certain pressure vessels.","action":"Final rule; withdrawal of enforcement discretion; delay of effective date.","agencies":[{"raw_name":"DEPARTMENT OF TRANSPORTATION","name":"Transportation Department","id":492,"url":"https://www.federalregister.gov/agencies/transportation-department","json_url":"https://www.federalregister.gov/api/v1/agencies/492","parent_id":null,"slug":"transportation-department"},{"raw_name":"Pipeline and Hazardous Materials Safety Administration","name":"Pipeline and Hazardous Materials Safety Administration","id":408,"url":"https://www.federalregister.gov/agencies/pipeline-and-hazardous-materials-safety-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/408","parent_id":492,"slug":"pipeline-and-hazardous-materials-safety-administration"}],"body_html_url":"https://www.federalregister.gov/documents/full_text/html/2021/03/05/2021-04572.html","cfr_references":[{"chapter":null,"citation_url":null,"part":"191","title":49},{"chapter":null,"citation_url":null,"part":"192","title":49}],"citation":"86 FR 12834","comment_url":"https://www.regulations.gov/commenton/PHMSA-2018-0046-0075","comments_close_on":null,"correction_of":null,"corrections":[],"dates":"Delayed effective date: As of March 5, 2021, the effective date of the final rule amending 49 CFR parts 191 and 192 published at 86 FR 2210 on January 11, 2021, is delayed to March 21, 2021.","disposition_notes":null,"docket_ids":["Docket No. PHMSA-2018-0046"],"dockets":[{"supporting_documents":[{"title":"U.S. DOT/PHMSA - Response to Petition for Reconsideration from Pipeline Safety Trust","document_id":"PHMSA-2018-0046-0077"},{"title":"Petition for Reconsideration and Request","document_id":"PHMSA-2018-0046-0073"},{"title":"PHMSA Data Analysis of 2015 Mechanical Fitting Failures","document_id":"PHMSA-2018-0046-0069"},{"title":"GD Incident Form and Instructions PHMSA F7100.1","document_id":"PHMSA-2018-0046-0068"},{"title":"GD Annual Report Form and Instructions-PHMSA F7100.1-1","document_id":"PHMSA-2018-0046-0067"},{"title":"Final EA","document_id":"PHMSA-2018-0046-0066"},{"title":"Final Rule RIA","document_id":"PHMSA-2018-0046-0065"},{"title":"Final Rule OMB Comparison Document","document_id":"PHMSA-2018-0046-0064"},{"title":"Summary of Meeting with PST","document_id":"PHMSA-2018-0046-0058"},{"title":"AGA Petition to Reconsider Final Part  192 281 and Part192 285 (002)","document_id":"PHMSA-2018-0046-0008"}],"agency_name":"PHMSA","documents":[{"comment_count":0,"comment_start_date":"2021-03-05","updated_at":"2024-11-13T13:34:29.407-05:00","comment_url":"https://www.regulations.gov/commenton/PHMSA-2018-0046-0075","allow_late_comments":true,"id":"PHMSA-2018-0046-0075","comment_end_date":null,"regulations_dot_gov_open_for_comment":false}],"supporting_documents_count":17,"id":"PHMSA-2018-0046","title":"Pipeline Safety: Gas Pipeline Regulatory Reform"}],"document_number":"2021-04572","effective_on":"2021-03-05","end_page":12835,"executive_order_notes":null,"executive_order_number":null,"full_text_xml_url":"https://www.federalregister.gov/documents/full_text/xml/2021/03/05/2021-04572.xml","html_url":"https://www.federalregister.gov/documents/2021/03/05/2021-04572/pipeline-safety-gas-pipeline-regulatory-reform","images":{},"images_metadata":{},"json_url":"https://www.federalregister.gov/api/v1/documents/2021-04572?publication_date=2021-03-05","mods_url":"https://www.govinfo.gov/metadata/granule/FR-2021-03-05/2021-04572/mods.xml","not_received_for_publication":null,"page_length":2,"page_views":{"count":1335,"last_updated":"2026-06-23 22:15:03 -0400"},"pdf_url":"https://www.govinfo.gov/content/pkg/FR-2021-03-05/pdf/2021-04572.pdf","presidential_document_number":null,"proclamation_number":null,"public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2021-04572.pdf?1614865543","publication_date":"2021-03-05","raw_text_url":"https://www.federalregister.gov/documents/full_text/text/2021/03/05/2021-04572.txt","regulation_id_number_info":{"2137-AF36":{"issue":"202010","html_url":"https://www.federalregister.gov/regulations/2137-AF36/pipeline-safety-gas-pipeline-regulatory-reform","title":"Pipeline Safety: Gas Pipeline Regulatory Reform","xml_url":"http://www.reginfo.gov/public/do/eAgendaViewRule?pubId=202010&RIN=2137-AF36&operation=OPERATION_EXPORT_XML","priority_category":"Economically Significant"}},"regulation_id_numbers":["2137-AF36"],"regulations_dot_gov_info":{"supporting_documents":[{"title":"U.S. DOT/PHMSA - Response to Petition for Reconsideration from Pipeline Safety Trust","document_id":"PHMSA-2018-0046-0077"},{"title":"Petition for Reconsideration and Request","document_id":"PHMSA-2018-0046-0073"},{"title":"PHMSA Data Analysis of 2015 Mechanical Fitting Failures","document_id":"PHMSA-2018-0046-0069"},{"title":"GD Incident Form and Instructions PHMSA F7100.1","document_id":"PHMSA-2018-0046-0068"},{"title":"GD Annual Report Form and Instructions-PHMSA F7100.1-1","document_id":"PHMSA-2018-0046-0067"},{"title":"Final EA","document_id":"PHMSA-2018-0046-0066"},{"title":"Final Rule RIA","document_id":"PHMSA-2018-0046-0065"},{"title":"Final Rule OMB Comparison Document","document_id":"PHMSA-2018-0046-0064"},{"title":"Summary of Meeting with PST","document_id":"PHMSA-2018-0046-0058"},{"title":"AGA Petition to Reconsider Final Part  192 281 and Part192 285 (002)","document_id":"PHMSA-2018-0046-0008"}],"regulatory_plan":{"html_url":"https://www.federalregister.gov/regulations/2137-AF36/pipeline-safety-gas-pipeline-regulatory-reform","title":"Pipeline Safety: Gas Pipeline Regulatory Reform"},"comments_count":0,"agency_id":"PHMSA","comments_url":"https://www.regulations.gov/docketBrowser?rpp=50&so=DESC&sb=postedDate&po=0&dct=PS&D=PHMSA-2018-0046","supporting_documents_count":17,"docket_id":"PHMSA-2018-0046","document_id":"PHMSA-2018-0046-0075","regulation_id_number":"2137-AF36","title":"Pipeline Safety: Gas Pipeline Regulatory Reform","checked_regulationsdotgov_at":"2024-11-13T23:00:09Z"},"regulations_dot_gov_url":"https://www.regulations.gov/commenton/PHMSA-2018-0046-0075","significant":true,"signing_date":null,"start_page":12834,"subtype":null,"title":"Pipeline Safety: Gas Pipeline Regulatory Reform","toc_doc":"Gas Pipeline Regulatory Reform","toc_subject":"Pipeline Safety:\n","topics":["Fire prevention","Incorporation by reference","Pipeline safety","Security measures"],"type":"Rule","volume":86}