{"abstract":"On December 4, 2019, Pacific Gas and Electric Company (PG&E, the licensee) submitted to the U.S. Nuclear Regulatory Commission (NRC) letters enclosing the post-shutdown decommissioning activities report (PSDAR), the site-specific decommissioning cost estimate (SSDCE), and the irradiated fuel management plan (IFMP), for the Diablo Canyon Nuclear Power Plant, Units 1 and 2 (Diablo Canyon, Units 1 and 2). The PSDAR, including the SSDCE and IFMP, provide an overview of PG&E's planned activities, schedule, projected costs, and environmental impacts for the decommissioning of Diablo Canyon, Units 1 and 2. On February 21, 2020, the NRC solicited comments on these documents. Subsequently, PG&E submitted a notification of changes on October 19, 2021. The NRC planned to hold a public meeting in the vicinity of Diablo Canyon, Units 1 and 2, to discuss the PSDAR's content, including the SSDCE and IFMP, and receive comments but decided to reschedule the public meeting due to concerns with the coronavirus disease 2019 (COVID-19) public health emergency. The NRC has rescheduled the public meeting to discuss the PSDAR, including the SSDCE and IFMP, and receive comments.","action":"Public meeting and request for comment.","agencies":[{"raw_name":"NUCLEAR REGULATORY COMMISSION","name":"Nuclear Regulatory Commission","id":383,"url":"https://www.federalregister.gov/agencies/nuclear-regulatory-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/383","parent_id":null,"slug":"nuclear-regulatory-commission"}],"body_html_url":"https://www.federalregister.gov/documents/full_text/html/2022/06/23/2022-13406.html","cfr_references":[],"citation":"87 FR 37533","comment_url":null,"comments_close_on":"2022-10-19","correction_of":null,"corrections":[],"dates":"The public meeting will be held on Thursday, July 21, 2022, from 6:00 p.m. until 9:00 p.m. Pacific Time (PT), at the San Luis Obispo County Government Building, located at 1055 Monterey Street, in San Luis Obispo, California. The public meeting is also accessible through an online webinar. Submit comments by October 19, 2022. Comments received after this date will be considered, if it is practical to do so, but the NRC is able to ensure consideration only for comments received on or before this date. See section III, \"Request for Comment and Public Meeting,\" of this document for additional information.","disposition_notes":null,"docket_ids":["Docket Nos. 50-275 and 50-323","NRC-2022-0132"],"dockets":[{"supporting_documents":[],"agency_name":"NRC","documents":[{"comment_count":5,"comment_start_date":"2022-06-23","updated_at":"2023-02-28T20:19:58.367-05:00","comment_url":"https://www.regulations.gov/commenton/NRC-2022-0132-0001","allow_late_comments":null,"id":"NRC-2022-0132-0001","comment_end_date":"2022-10-20","regulations_dot_gov_open_for_comment":false}],"supporting_documents_count":0,"id":"NRC-2022-0132","title":"Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2; Post-Shutdown Decommissioning Activities Report"}],"document_number":"2022-13406","effective_on":null,"end_page":37535,"executive_order_notes":null,"executive_order_number":null,"full_text_xml_url":"https://www.federalregister.gov/documents/full_text/xml/2022/06/23/2022-13406.xml","html_url":"https://www.federalregister.gov/documents/2022/06/23/2022-13406/pacific-gas-and-electric-company-diablo-canyon-nuclear-power-plant-units-1-and-2-post-shutdown","images":{},"images_metadata":{},"json_url":"https://www.federalregister.gov/api/v1/documents/2022-13406?publication_date=2022-06-23","mods_url":"https://www.govinfo.gov/metadata/granule/FR-2022-06-23/2022-13406/mods.xml","not_received_for_publication":null,"page_length":3,"page_views":{"count":374,"last_updated":"2026-09-22 04:15:07 -0400"},"pdf_url":"https://www.govinfo.gov/content/pkg/FR-2022-06-23/pdf/2022-13406.pdf","presidential_document_number":null,"proclamation_number":null,"public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2022-13406.pdf?1655901916","publication_date":"2022-06-23","raw_text_url":"https://www.federalregister.gov/documents/full_text/text/2022/06/23/2022-13406.txt","regulation_id_number_info":{},"regulation_id_numbers":[],"regulations_dot_gov_info":{"supporting_documents":[],"comments_count":5,"agency_id":"NRC","comments_url":"https://www.regulations.gov/docketBrowser?rpp=50&so=DESC&sb=postedDate&po=0&dct=PS&D=NRC-2022-0132","supporting_documents_count":0,"docket_id":"NRC-2022-0132","document_id":"NRC-2022-0132-0001","regulation_id_number":null,"title":"Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2; Post-Shutdown Decommissioning Activities Report","checked_regulationsdotgov_at":"2023-03-01T01:19:57Z"},"regulations_dot_gov_url":null,"significant":null,"signing_date":null,"start_page":37533,"subtype":null,"title":"Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2; Post-Shutdown Decommissioning Activities Report","toc_doc":"Pacific Gas and Electric Company; Diablo Canyon Nuclear Power Plant, Units 1 and 2; Post-Shutdown Decommissioning Activities Report","toc_subject":"Meetings:\n","topics":[],"type":"Notice","volume":87}