{"abstract":"The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment two related draft Regulatory Guides (DG) namely DG-1290, Revision 1, \"Design-Basis Floods for Nuclear Power Plants,\" proposed Revision 3 of Regulatory Guide (RG) 1.59 of the same name and DG-1417, \"Guidance for Assessment of Flooding Hazards due to Water Control Structure Failures and Incidents,\" proposed new RG 1.256. DG-1290 provides guidance for applicants for new nuclear power plants (NPPs) on acceptable methods for evaluating design-basis floods and DG-1417 provides guidance for applicants on flooding hazards due to failure or other incidents at man-made water control structures including, but not limited to, dams and levees.","action":"Draft guides; request for comment.","agencies":[{"raw_name":"NUCLEAR REGULATORY COMMISSION","name":"Nuclear Regulatory Commission","id":383,"url":"https://www.federalregister.gov/agencies/nuclear-regulatory-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/383","parent_id":null,"slug":"nuclear-regulatory-commission"}],"body_html_url":"https://www.federalregister.gov/documents/full_text/html/2024/07/15/2024-15479.html","cfr_references":[{"chapter":null,"citation_url":null,"part":"50","title":10},{"chapter":null,"citation_url":null,"part":"52","title":10},{"chapter":null,"citation_url":null,"part":"100","title":10}],"citation":"89 FR 57372","comment_url":null,"comments_close_on":"2024-08-14","correction_of":null,"corrections":[],"dates":"Submit comments by August 14, 2024. Comments received after this date will be considered if it is practical to do so, but the NRC is able to ensure consideration only for comments received on or before this date.","disposition_notes":null,"docket_ids":["NRC-2024-0110"],"dockets":[{"supporting_documents":[{"title":"DG 1417 GUIDANCE FOR ASSESSMENT OF FLOODING HAZARDS DUE TO WATER CONTROL STRUCTURE FAILURES","document_id":"NRC-2024-0110-0003"},{"title":"DG 1290 DESIGN BASIS FLOODS FOR NUCLEAR POWER PLANTS","document_id":"NRC-2024-0110-0002"}],"agency_name":"NRC","documents":[{"comment_count":3,"comment_start_date":"2024-07-15","updated_at":"2024-09-14T01:01:06.868-04:00","comment_url":"https://www.regulations.gov/commenton/NRC-2024-0110-0001","allow_late_comments":false,"id":"NRC-2024-0110-0001","comment_end_date":"2024-09-14","regulations_dot_gov_open_for_comment":false}],"supporting_documents_count":2,"id":"NRC-2024-0110","title":"Design-Basis Floods for Nuclear Power Plants and Guidance for Assessment of Flooding Hazards due to Water Control Structure Failures and Incidents"}],"document_number":"2024-15479","effective_on":null,"end_page":57374,"executive_order_notes":null,"executive_order_number":null,"full_text_xml_url":"https://www.federalregister.gov/documents/full_text/xml/2024/07/15/2024-15479.xml","html_url":"https://www.federalregister.gov/documents/2024/07/15/2024-15479/draft-regulatory-guides-design-basis-floods-for-nuclear-power-plants-and-guidance-for-assessment-of","images":{},"images_metadata":{},"json_url":"https://www.federalregister.gov/api/v1/documents/2024-15479?publication_date=2024-07-15","mods_url":"https://www.govinfo.gov/metadata/granule/FR-2024-07-15/2024-15479/mods.xml","not_received_for_publication":null,"page_length":3,"page_views":{"count":207,"last_updated":"2026-11-22 08:15:04 -0500"},"pdf_url":"https://www.govinfo.gov/content/pkg/FR-2024-07-15/pdf/2024-15479.pdf","presidential_document_number":null,"proclamation_number":null,"public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2024-15479.pdf?1720788341","publication_date":"2024-07-15","raw_text_url":"https://www.federalregister.gov/documents/full_text/text/2024/07/15/2024-15479.txt","regulation_id_number_info":{},"regulation_id_numbers":[],"regulations_dot_gov_info":{"supporting_documents":[{"title":"DG 1417 GUIDANCE FOR ASSESSMENT OF FLOODING HAZARDS DUE TO WATER CONTROL STRUCTURE FAILURES","document_id":"NRC-2024-0110-0003"},{"title":"DG 1290 DESIGN BASIS FLOODS FOR NUCLEAR POWER PLANTS","document_id":"NRC-2024-0110-0002"}],"comments_count":3,"agency_id":"NRC","comments_url":"https://www.regulations.gov/docketBrowser?rpp=50&so=DESC&sb=postedDate&po=0&dct=PS&D=NRC-2024-0110","supporting_documents_count":2,"docket_id":"NRC-2024-0110","document_id":"NRC-2024-0110-0001","regulation_id_number":null,"title":"Design-Basis Floods for Nuclear Power Plants and Guidance for Assessment of Flooding Hazards due to Water Control Structure Failures and Incidents","checked_regulationsdotgov_at":"2024-09-15T01:00:08Z"},"regulations_dot_gov_url":null,"significant":null,"signing_date":null,"start_page":57372,"subtype":null,"title":"Draft Regulatory Guides: Design-Basis Floods for Nuclear Power Plants and Guidance for Assessment of Flooding Hazards Due to Water Control Structure Failures and Incidents","toc_doc":"Design-Basis Floods for Nuclear Power Plants and Guidance for Assessment of Flooding Hazards Due to Water Control Structure Failures and Incidents","toc_subject":"Draft Regulatory Guide:\n","topics":[],"type":"Proposed Rule","volume":89}