{"abstract":"This DFR rescinds regulations regarding the applications for a presidential permit authorizing construction, connection, operation, and maintenance of facilities for transmission of electric energy at international boundaries.","action":"Direct final rule (\"DFR\"); request for comments.","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"}],"body_html_url":"https://www.federalregister.gov/documents/full_text/html/2025/05/16/2025-08539.html","cfr_references":[{"chapter":null,"citation_url":null,"part":"205","title":10}],"citation":"90 FR 20753","comment_url":null,"comments_close_on":"2025-06-16","correction_of":null,"corrections":[],"dates":"The final rule is effective July 15, 2025, unless significant adverse comments are received by June 16, 2025. Significant adverse comments oppose the rule and raise, alone or in combination, a serious enough issue related to each of the independent grounds for the rule that a substantive response is required. If significant adverse comments are received, notice will be published in the Federal Register before the effective date either withdrawing the rule or issuing a new final rule which responds to significant adverse comments.","disposition_notes":null,"docket_ids":["DOE-HQ-2025-0011"],"dockets":[{"supporting_documents":[],"agency_name":"DOE","documents":[{"comment_count":5,"comment_start_date":"2025-05-16","updated_at":"2025-06-17T02:57:12.698-04:00","comment_url":"https://www.regulations.gov/commenton/DOE-HQ-2025-0011-0001","allow_late_comments":false,"id":"DOE-HQ-2025-0011-0001","comment_end_date":"2025-06-17","regulations_dot_gov_open_for_comment":false}],"supporting_documents_count":0,"id":"DOE-HQ-2025-0011","title":"Application for Presidential Permit Authorizing the Construction, Connection, Operation, and Maintenance of Facilities for Transmission of Electric Energy at International Boundaries"}],"document_number":"2025-08539","effective_on":"2025-07-15","end_page":20755,"executive_order_notes":null,"executive_order_number":null,"full_text_xml_url":"https://www.federalregister.gov/documents/full_text/xml/2025/05/16/2025-08539.xml","html_url":"https://www.federalregister.gov/documents/2025/05/16/2025-08539/application-for-presidential-permit-authorizing-the-construction-connection-operation-and","images":{},"images_metadata":{},"json_url":"https://www.federalregister.gov/api/v1/documents/2025-08539?publication_date=2025-05-16","mods_url":"https://www.govinfo.gov/metadata/granule/FR-2025-05-16/2025-08539/mods.xml","not_received_for_publication":null,"page_length":3,"page_views":{"count":1164,"last_updated":"2026-10-22 20:15:04 -0400"},"pdf_url":"https://www.govinfo.gov/content/pkg/FR-2025-05-16/pdf/2025-08539.pdf","presidential_document_number":null,"proclamation_number":null,"public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2025-08539.pdf?1747056608","publication_date":"2025-05-16","raw_text_url":"https://www.federalregister.gov/documents/full_text/text/2025/05/16/2025-08539.txt","regulation_id_number_info":{"1901-AB68":{"issue":"202504","html_url":"https://www.federalregister.gov/regulations/1901-AB68/application-for-presidential-permit-authorizing-the-construction-connection-operation-and-maintenanc","title":"Application for Presidential Permit Authorizing the Construction, Connection, Operation, and Maintenance of Facilities for Transmission of Electric Energy at International Boundaries","xml_url":"http://www.reginfo.gov/public/do/eAgendaViewRule?pubId=202504&RIN=1901-AB68&operation=OPERATION_EXPORT_XML","priority_category":"Other Significant"}},"regulation_id_numbers":["1901-AB68"],"regulations_dot_gov_info":{"supporting_documents":[],"regulatory_plan":{"html_url":"https://www.federalregister.gov/regulations/1901-AB68/application-for-presidential-permit-authorizing-the-construction-connection-operation-and-maintenanc","title":"Application for Presidential Permit Authorizing the Construction, Connection, Operation, and Maintenance of Facilities for Transmission of Electric Energy at International Boundaries"},"comments_count":5,"agency_id":"DOE","comments_url":"https://www.regulations.gov/docketBrowser?rpp=50&so=DESC&sb=postedDate&po=0&dct=PS&D=DOE-HQ-2025-0011","supporting_documents_count":0,"docket_id":"DOE-HQ-2025-0011","document_id":"DOE-HQ-2025-0011-0001","regulation_id_number":"1901-AB68","title":"Application for Presidential Permit Authorizing the Construction, Connection, Operation, and Maintenance of Facilities for Transmission of Electric Energy at International Boundaries","checked_regulationsdotgov_at":"2025-06-18T08:55:05Z"},"regulations_dot_gov_url":null,"significant":true,"signing_date":null,"start_page":20753,"subtype":null,"title":"Application for Presidential Permit Authorizing the Construction, Connection, Operation, and Maintenance of Facilities for Transmission of Electric Energy at International Boundaries","toc_doc":"Application for Presidential Permit Authorizing the Construction, Connection, Operation, and Maintenance of Facilities for Transmission of Electric Energy at International Boundaries","toc_subject":null,"topics":["Administrative practice and procedure","Electric power","Electric utilities","Energy","Environmental protection","Exports","Foreign relations"],"type":"Rule","volume":90}