{"abstract":"The Office of Surface Mining Reclamation and Enforcement (OSM) is confirming the effective date of January 27, 2026, for the direct final rule \"Rescission of Portions of Permanent Program Performance Standards Related to Siltation Structures,\" published on November 28, 2025. The direct final rule removes paragraphs that required that all surface drainage from the disturbed area pass through a siltation structure before leaving the permit area. These provisions were struck down by a reviewing court in 1985 and have no legal effect but were never removed from the Code of Federal Regulations. During the comment period, OSM received one substantive comment. That comment was not a significant adverse comment because it did not effectively challenge the rule's underlying premise or approach or explain why the rule would be inappropriate without a change. As a result, the comment does not warrant a delay of the effective date.","action":"Direct final rule; confirmation of effective date.","agencies":[{"raw_name":"DEPARTMENT OF THE INTERIOR","name":"Interior Department","id":253,"url":"https://www.federalregister.gov/agencies/interior-department","json_url":"https://www.federalregister.gov/api/v1/agencies/253","parent_id":null,"slug":"interior-department"},{"raw_name":"Office of Surface Mining Reclamation and Enforcement","name":"Surface Mining Reclamation and Enforcement Office","id":480,"url":"https://www.federalregister.gov/agencies/surface-mining-reclamation-and-enforcement-office","json_url":"https://www.federalregister.gov/api/v1/agencies/480","parent_id":253,"slug":"surface-mining-reclamation-and-enforcement-office"}],"body_html_url":"https://www.federalregister.gov/documents/full_text/html/2026/01/27/2026-01570.html","cfr_references":[{"chapter":null,"citation_url":null,"part":"816","title":30},{"chapter":null,"citation_url":null,"part":"817","title":30}],"citation":"91 FR 3372","comment_url":null,"comments_close_on":null,"correction_of":null,"corrections":[],"dates":"The effective date of the rule is January 27, 2026.","disposition_notes":null,"docket_ids":["Docket No. OSM-2025-0010","S1D1S SS08011000 SX064A000 256S180110","S2D2S SS08011000 SX064A000 25XS501520"],"dockets":[{"supporting_documents":[],"agency_name":"OSM","documents":[{"comment_count":0,"comment_start_date":"2026-01-27","updated_at":"2026-02-02T10:56:33.476-05:00","comment_url":"https://www.regulations.gov/commenton/OSM-2025-0010-0003","allow_late_comments":false,"id":"OSM-2025-0010-0003","comment_end_date":null,"regulations_dot_gov_open_for_comment":false}],"supporting_documents_count":0,"id":"OSM-2025-0010","title":"Rescission of Portions of Permanent Program Performance Standards Related to Siltation Structures"}],"document_number":"2026-01570","effective_on":"2026-01-27","end_page":3373,"executive_order_notes":null,"executive_order_number":null,"full_text_xml_url":"https://www.federalregister.gov/documents/full_text/xml/2026/01/27/2026-01570.xml","html_url":"https://www.federalregister.gov/documents/2026/01/27/2026-01570/rescission-of-portions-of-permanent-program-performance-standards-related-to-siltation-structures","images":{},"images_metadata":{},"json_url":"https://www.federalregister.gov/api/v1/documents/2026-01570?publication_date=2026-01-27","mods_url":"https://www.govinfo.gov/metadata/granule/FR-2026-01-27/2026-01570/mods.xml","not_received_for_publication":null,"page_length":2,"page_views":{"count":89,"last_updated":"2026-07-26 06:15:03 -0400"},"pdf_url":"https://www.govinfo.gov/content/pkg/FR-2026-01-27/pdf/2026-01570.pdf","presidential_document_number":null,"proclamation_number":null,"public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2026-01570.pdf?1769435121","publication_date":"2026-01-27","raw_text_url":"https://www.federalregister.gov/documents/full_text/text/2026/01/27/2026-01570.txt","regulation_id_number_info":{"1029-AC92":{"issue":"202504","html_url":"https://www.federalregister.gov/regulations/1029-AC92/hydrologic-balance-siltation-structures","title":"Hydrologic Balance - Siltation Structures","xml_url":"http://www.reginfo.gov/public/do/eAgendaViewRule?pubId=202504&RIN=1029-AC92&operation=OPERATION_EXPORT_XML","priority_category":"Substantive, Nonsignificant"}},"regulation_id_numbers":["1029-AC92"],"regulations_dot_gov_info":{"supporting_documents":[],"regulatory_plan":{"html_url":"https://www.federalregister.gov/regulations/1029-AC92/hydrologic-balance-siltation-structures","title":"Hydrologic Balance - Siltation Structures"},"comments_count":0,"agency_id":"OSM","comments_url":"https://www.regulations.gov/docketBrowser?rpp=50&so=DESC&sb=postedDate&po=0&dct=PS&D=OSM-2025-0010","supporting_documents_count":0,"docket_id":"OSM-2025-0010","document_id":"OSM-2025-0010-0003","regulation_id_number":"1029-AC92","title":"Rescission of Portions of Permanent Program Performance Standards Related to Siltation Structures","checked_regulationsdotgov_at":"2026-02-03T18:55:05Z"},"regulations_dot_gov_url":null,"significant":false,"signing_date":null,"start_page":3372,"subtype":null,"title":"Rescission of Portions of Permanent Program Performance Standards Related to Siltation Structures","toc_doc":"Rescission of Portions of Permanent Program Performance Standards Related to Siltation Structures","toc_subject":null,"topics":[],"type":"Rule","volume":91}