{"abstract":"This NPRM proposes to increase the monetary threshold for Operator Identification Number notifications for certain construction and maintenance tasks on gas and hazardous liquid and carbon dioxide pipeline facilities. PHMSA is also proposing to adjust inflation adjustment procedures to provide a mechanism for updating these thresholds on an annual basis.","action":"Notice of proposed rulemaking (NPRM).","agencies":[{"raw_name":"DEPARTMENT OF TRANSPORTATION","name":"Transportation Department","id":492,"url":"https://www.federalregister.gov/agencies/transportation-department","json_url":"https://www.federalregister.gov/api/v1/agencies/492","parent_id":null,"slug":"transportation-department"},{"raw_name":"Pipeline and Hazardous Materials Safety Administration","name":"Pipeline and Hazardous Materials Safety Administration","id":408,"url":"https://www.federalregister.gov/agencies/pipeline-and-hazardous-materials-safety-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/408","parent_id":492,"slug":"pipeline-and-hazardous-materials-safety-administration"}],"body_html_url":"https://www.federalregister.gov/documents/full_text/html/2026/04/24/2026-08082.html","cfr_references":[{"chapter":null,"citation_url":null,"part":"191","title":49},{"chapter":null,"citation_url":null,"part":"195","title":49}],"citation":"91 FR 22091","comment_url":"http://www.regulations.gov/commenton/PHMSA-2026-1551-0002","comments_close_on":"2026-06-23","correction_of":null,"corrections":[],"dates":"Comments must be received on or before June 23, 2026.","disposition_notes":null,"docket_ids":["Docket No. PHMSA-2026-1551"],"dockets":[{"supporting_documents":[{"title":"PRIA: OPID Construction Notifications","document_id":"PHMSA-2026-1551-0001"}],"agency_name":"PHMSA","documents":[{"comment_count":0,"comment_start_date":"2026-04-24","updated_at":"2026-04-24T12:01:14.485-04:00","comment_url":"https://www.regulations.gov/commenton/PHMSA-2026-1551-0002","allow_late_comments":false,"id":"PHMSA-2026-1551-0002","comment_end_date":"2026-06-24","regulations_dot_gov_open_for_comment":true}],"supporting_documents_count":1,"id":"PHMSA-2026-1551","title":"Pipeline Safety: Adjustment to OPID Notifications for Construction"}],"document_number":"2026-08082","effective_on":null,"end_page":22096,"executive_order_notes":null,"executive_order_number":null,"explanation":null,"full_text_xml_url":"https://www.federalregister.gov/documents/full_text/xml/2026/04/24/2026-08082.xml","html_url":"https://www.federalregister.gov/documents/2026/04/24/2026-08082/pipeline-safety-adjustment-to-opid-notifications-for-construction","images":{"EP24AP26.093":{"large":"https://img.federalregister.gov/EP24AP26.093/EP24AP26.093_large.png","medium":"https://img.federalregister.gov/EP24AP26.093/EP24AP26.093_medium.png","original_size":"https://img.federalregister.gov/EP24AP26.093/EP24AP26.093_original_size.png"},"EP24AP26.092":{"large":"https://img.federalregister.gov/EP24AP26.092/EP24AP26.092_large.png","medium":"https://img.federalregister.gov/EP24AP26.092/EP24AP26.092_medium.png","original_size":"https://img.federalregister.gov/EP24AP26.092/EP24AP26.092_original_size.png"}},"images_metadata":{"EP24AP26.093":{"large":{"identifier":"EP24AP26.093","content_type":"image/png","size":2079,"width":253,"sha":"99ee13f9412a2d5b36cb6c4d9b537946","url":"https://img.federalregister.gov/EP24AP26.093/EP24AP26.093_large.png","height":96},"medium":{"identifier":"EP24AP26.093","content_type":"image/png","size":853,"width":118,"sha":"38817e09f57e3b77926db327c4d7f0bb","url":"https://img.federalregister.gov/EP24AP26.093/EP24AP26.093_medium.png","height":45},"original_size":{"identifier":"EP24AP26.093","content_type":"image/png","size":1126,"width":450,"sha":"c76b5eb09dda61c6b8fdf15e09f9f4c7","url":"https://img.federalregister.gov/EP24AP26.093/EP24AP26.093_original_size.png","height":171}},"EP24AP26.092":{"large":{"identifier":"EP24AP26.092","content_type":"image/png","size":2096,"width":253,"sha":"d5b1d303e49bbaee287880cb980722f6","url":"https://img.federalregister.gov/EP24AP26.092/EP24AP26.092_large.png","height":96},"medium":{"identifier":"EP24AP26.092","content_type":"image/png","size":829,"width":119,"sha":"66d6c17cc09e50c0ce26323562057d65","url":"https://img.federalregister.gov/EP24AP26.092/EP24AP26.092_medium.png","height":45},"original_size":{"identifier":"EP24AP26.092","content_type":"image/png","size":1097,"width":450,"sha":"1173e791e16c93c2241749c36b53c3ec","url":"https://img.federalregister.gov/EP24AP26.092/EP24AP26.092_original_size.png","height":170}}},"json_url":"https://www.federalregister.gov/api/v1/documents/2026-08082?publication_date=2026-04-24","mods_url":"https://www.govinfo.gov/metadata/granule/FR-2026-04-24/2026-08082/mods.xml","not_received_for_publication":null,"page_length":6,"page_views":{"count":56,"last_updated":"2026-04-24 18:15:03 -0400"},"pdf_url":"https://www.govinfo.gov/content/pkg/FR-2026-04-24/pdf/2026-08082.pdf","presidential_document_number":null,"proclamation_number":null,"public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2026-08082.pdf?1776948325","publication_date":"2026-04-24","raw_text_url":"https://www.federalregister.gov/documents/full_text/text/2026/04/24/2026-08082.txt","regulation_id_number_info":{"2137-AG55":null},"regulation_id_numbers":["2137-AG55"],"regulations_dot_gov_info":{"supporting_documents":[{"title":"PRIA: OPID Construction Notifications","document_id":"PHMSA-2026-1551-0001"}],"comments_count":0,"agency_id":"PHMSA","comments_url":"https://www.regulations.gov/docketBrowser?rpp=50&so=DESC&sb=postedDate&po=0&dct=PS&D=PHMSA-2026-1551","supporting_documents_count":1,"docket_id":"PHMSA-2026-1551","document_id":"PHMSA-2026-1551-0002","regulation_id_number":"2137-AG55","title":"Pipeline Safety: Adjustment to OPID Notifications for Construction","checked_regulationsdotgov_at":"2026-04-24T22:55:03Z"},"regulations_dot_gov_url":"http://www.regulations.gov/commenton/PHMSA-2026-1551-0002","significant":null,"signing_date":null,"start_page":22091,"subtype":null,"title":"Pipeline Safety: Adjustment to OPID Notifications for Construction","toc_doc":"Adjustment to OPID Notifications for Construction","toc_subject":"Pipeline Safety","topics":["Carbon oxides","Natural gas","Petroleum","Pipeline safety"],"type":"Proposed Rule","volume":91}