{"abstract":null,"action":null,"agencies":[{"raw_name":"EXECUTIVE OFFICE OF THE PRESIDENT","name":"Executive Office of the President","id":538,"url":"https://www.federalregister.gov/agencies/executive-office-of-the-president","json_url":"https://www.federalregister.gov/api/v1/agencies/538","parent_id":null,"slug":"executive-office-of-the-president"}],"body_html_url":"https://www.federalregister.gov/documents/full_text/html/2026/05/05/2026-08909.html","cfr_references":[],"citation":"91 FR 24333","comment_url":null,"comments_close_on":null,"correction_of":null,"corrections":[],"dates":null,"disposition_notes":null,"docket_ids":[],"dockets":[],"document_number":"2026-08909","effective_on":null,"end_page":24335,"executive_order_notes":null,"executive_order_number":null,"explanation":null,"full_text_xml_url":"https://www.federalregister.gov/documents/full_text/xml/2026/05/05/2026-08909.xml","html_url":"https://www.federalregister.gov/documents/2026/05/05/2026-08909/authorizing-bridger-pipeline-expansion-llc-to-construct-connect-operate-and-maintain-pipeline","images":{"TRUMP":{"large":"https://img.federalregister.gov/TRUMP/TRUMP_large.png","original_size":"https://img.federalregister.gov/TRUMP/TRUMP_original_size.png"}},"images_metadata":{"TRUMP":{"large":{"identifier":"TRUMP","content_type":"image/png","size":4837,"width":278,"sha":"e76cde96299eaa37d682560f39698be8","url":"https://img.federalregister.gov/TRUMP/TRUMP_large.png","height":209},"original_size":{"identifier":"TRUMP","content_type":"image/png","size":2334,"width":494,"sha":"11642e3879ff805f30105d2de6901584","url":"https://img.federalregister.gov/TRUMP/TRUMP_original_size.png","height":371}}},"json_url":"https://www.federalregister.gov/api/v1/documents/2026-08909?publication_date=2026-05-05","mods_url":"https://www.govinfo.gov/metadata/granule/FR-2026-05-05/2026-08909/mods.xml","not_received_for_publication":null,"page_length":3,"page_views":{"count":225,"last_updated":"2026-05-25 08:15:04 -0400"},"pdf_url":"https://www.govinfo.gov/content/pkg/FR-2026-05-05/pdf/2026-08909.pdf","presidential_document_number":null,"proclamation_number":null,"public_inspection_pdf_url":"https://public-inspection.federalregister.gov/2026-08909.pdf?1777907711","publication_date":"2026-05-05","raw_text_url":"https://www.federalregister.gov/documents/full_text/text/2026/05/05/2026-08909.txt","regulation_id_number_info":{},"regulation_id_numbers":[],"regulations_dot_gov_info":{"checked_regulationsdotgov_at":"2026-05-05T05:22:55Z"},"regulations_dot_gov_url":null,"significant":null,"signing_date":"2026-04-30","start_page":24333,"subtype":"Other","title":"Authorizing Bridger Pipeline Expansion LLC To Construct, Connect, Operate, and Maintain Pipeline Facilities at the International Boundary at Phillips County, Montana, Between the United States and Canada","toc_doc":"Bridger Pipeline Expansion LLC; Authorization To Construct, Connect, Operate, and Maintain Pipeline Facilities at U.S.Canada Boundary at Phillips County, MT (Permit of April 30, 2026)","toc_subject":null,"topics":[],"type":"Presidential Document","volume":91}