{"abstract":"On September 19, 2006, the State of Georgia's Department of Natural Resources (DNR), through the Georgia Environmental Protection Division (GA EPD), submitted a final State Implementation Plan (SIP) revision to remove the transportation control measure (TCM) related to a compressed natural gas (CNG) refueling station/park and ride transportation center project in Douglas County, Georgia. This TCM was originally submitted by GA EPD for inclusion into the Atlanta portion of the Georgia SIP on August 29, 1997. EPA approved this TCM into the Georgia SIP through direct final rulemaking published in the Federal Register on June 24, 1998 (effective on August 10, 1998). Subsequently, the project sponsor determined that the equipment necessary to implement this project is no longer available, and thus this TCM cannot be implemented as originally anticipated. No SIP credit was claimed for this program, nor were emissions benefits ever realized for this TCM because it was never implemented. Through this rulemaking, EPA is approving the removal of this TCM from the Atlanta portion of the Georgia SIP because this SIP revision meets Clean Air Act (CAA) requirements.","action":"Direct final rule.","agencies":[{"raw_name":"ENVIRONMENTAL PROTECTION AGENCY","name":"Environmental Protection Agency","id":145,"url":"https://www.federalregister.gov/agencies/environmental-protection-agency","json_url":"https://www.federalregister.gov/api/v1/agencies/145","parent_id":null,"slug":"environmental-protection-agency"}],"body_html_url":"https://www.federalregister.gov/documents/full_text/html/2006/11/28/E6-20141.html","cfr_references":[{"chapter":null,"citation_url":null,"part":52,"title":40}],"citation":"71 FR 68740","comment_url":null,"comments_close_on":"2006-12-28","correction_of":null,"corrections":[],"dates":"This direct final rule is effective January 29, 2007 without further notice, unless EPA receives adverse comment by December 28, 2006. If adverse comment is received, EPA will publish a timely withdrawal of the direct final rule in the Federal Register and inform the public that the rule will not take effect.","disposition_notes":null,"docket_ids":["EPA-R04-OAR-2006-0577-200624(a)","FRL-8248-9"],"dockets":[],"document_number":"E6-20141","effective_on":"2007-01-29","end_page":68743,"executive_order_notes":null,"executive_order_number":null,"full_text_xml_url":"https://www.federalregister.gov/documents/full_text/xml/2006/11/28/E6-20141.xml","html_url":"https://www.federalregister.gov/documents/2006/11/28/E6-20141/approval-and-promulgation-of-implementation-plans-georgia-removal-of-douglas-county-transportation","images":{},"images_metadata":{},"json_url":"https://www.federalregister.gov/api/v1/documents/E6-20141?publication_date=2006-11-28","mods_url":"https://www.govinfo.gov/metadata/granule/FR-2006-11-28/E6-20141/mods.xml","not_received_for_publication":null,"page_length":4,"page_views":{"count":24,"last_updated":"2026-08-25 02:15:03 -0400"},"pdf_url":"https://www.govinfo.gov/content/pkg/FR-2006-11-28/pdf/E6-20141.pdf","presidential_document_number":null,"proclamation_number":null,"public_inspection_pdf_url":null,"publication_date":"2006-11-28","raw_text_url":"https://www.federalregister.gov/documents/full_text/text/2006/11/28/E6-20141.txt","regulation_id_number_info":{},"regulation_id_numbers":[],"regulations_dot_gov_info":{"checked_regulationsdotgov_at":"2011-11-12T20:20:03Z"},"regulations_dot_gov_url":null,"significant":null,"signing_date":null,"start_page":68740,"subtype":null,"title":"Approval and Promulgation of Implementation Plans; Georgia: Removal of Douglas County Transportation Control Measure","toc_doc":"Georgia","toc_subject":"Air quality implementation plans; approval and promulgation; various States:","topics":["Air pollution control","Carbon monoxide","Environmental protection","Intergovernmental relations","Nitrogen dioxide","Ozone","Particulate matter","Reporting and recordkeeping requirements","Volatile organic compounds"],"type":"Rule","volume":71}