{"abstract":"The Deputy Secretary of Energy confirmed and approved Rate Order No. WAPA-130 and Rate Schedules INT-FT4 and INT-NFT3, placing firm and nonfirm transmission service rates for the Pacific Northwest- Pacific Southwest Intertie Project (Intertie) of the Western Area Power Administration (Western) into effect on an interim basis. The provisional rates will be in effect until the Federal Energy Regulatory Commission (FERC) confirms, approves, and places them into effect on a final basis, or until they are replaced by other rates. The provisional rates will provide sufficient revenue to pay all annual costs, including interest expense, and repay required investment within the allowable periods.","action":"Notice of Order Concerning Transmission Service Rates.","agencies":[{"raw_name":"DEPARTMENT OF ENERGY","name":"Energy Department","id":136,"url":"https://www.federalregister.gov/agencies/energy-department","json_url":"https://www.federalregister.gov/api/v1/agencies/136","parent_id":null,"slug":"energy-department"},{"raw_name":"Western Area Power Administration","name":"Western Area Power Administration","id":525,"url":"https://www.federalregister.gov/agencies/western-area-power-administration","json_url":"https://www.federalregister.gov/api/v1/agencies/525","parent_id":136,"slug":"western-area-power-administration"}],"body_html_url":"https://www.federalregister.gov/documents/full_text/html/2007/10/10/E7-19914.html","cfr_references":[],"citation":"72 FR 57563","comment_url":null,"comments_close_on":null,"correction_of":null,"corrections":[],"dates":"Rate Schedules INT-FT4 and INT-NFT3 will be placed into effect on an interim basis on the first day of the first full billing period beginning on or after October 1, 2007, and will be in effect until FERC confirms, approves, and places the rate schedules in effect on a final basis ending September 30, 2012, or until the rate schedules are superseded.","disposition_notes":null,"docket_ids":["Rate Order No. WAPA-130"],"dockets":[],"document_number":"E7-19914","effective_on":"2007-10-01","end_page":57568,"executive_order_notes":null,"executive_order_number":null,"explanation":null,"full_text_xml_url":"https://www.federalregister.gov/documents/full_text/xml/2007/10/10/E7-19914.xml","html_url":"https://www.federalregister.gov/documents/2007/10/10/E7-19914/pacific-northwest-pacific-southwest-intertie-project-rate-order-no-wapa-130","images":{},"images_metadata":{},"json_url":"https://www.federalregister.gov/api/v1/documents/E7-19914?publication_date=2007-10-10","mods_url":"https://www.govinfo.gov/metadata/granule/FR-2007-10-10/E7-19914/mods.xml","not_received_for_publication":null,"page_length":6,"page_views":{"count":64,"last_updated":"2026-04-04 08:15:04 -0400"},"pdf_url":"https://www.govinfo.gov/content/pkg/FR-2007-10-10/pdf/E7-19914.pdf","presidential_document_number":null,"proclamation_number":null,"public_inspection_pdf_url":null,"publication_date":"2007-10-10","raw_text_url":"https://www.federalregister.gov/documents/full_text/text/2007/10/10/E7-19914.txt","regulation_id_number_info":{},"regulation_id_numbers":[],"regulations_dot_gov_info":{"checked_regulationsdotgov_at":"2011-11-13T05:12:43Z"},"regulations_dot_gov_url":null,"significant":null,"signing_date":null,"start_page":57563,"subtype":null,"title":"Pacific Northwest-Pacific Southwest Intertie Project-Rate Order No. WAPA-130","toc_doc":"Pacific Northwest-Pacific Southwest Intertie Project","toc_subject":"Power rates:","topics":[],"type":"Notice","volume":72}