{"abstract":"The Nuclear Regulatory Commission (NRC) has issued for public comment a document entitled: NUREG/CR-XXXX, \"Criteria for Development of Evacuation Time Estimate Studies.\" The Evacuation Time Estimate (ETE) is a calculation of the time to evacuate the plume exposure pathway emergency planning zone (EPZ), an area with a radius of about 10 miles around a nuclear power plant (NPP). The ETE is primarily used to inform protective action decisions during NPP radiological emergencies and may be used to assist in the development of traffic management plans to support an evacuation. This document is an acceptable template for use by NPP licensees to meet NRC requirements for the development of ETE studies. It also provides guidance for the update and review of ETEs. The format and criteria provided in this document will support consistent application of ETE methodology and will facilitate consistent NRC review of ETE studies.","action":"Announcement of issuance for public comment, availability.","agencies":[{"raw_name":"NUCLEAR REGULATORY COMMISSION","name":"Nuclear Regulatory Commission","id":383,"url":"https://www.federalregister.gov/agencies/nuclear-regulatory-commission","json_url":"https://www.federalregister.gov/api/v1/agencies/383","parent_id":null,"slug":"nuclear-regulatory-commission"}],"body_html_url":"https://www.federalregister.gov/documents/full_text/html/2009/05/18/E9-11037.html","cfr_references":[],"citation":"74 FR 23219","comment_url":null,"comments_close_on":null,"correction_of":null,"corrections":[],"dates":"Comments must be filed no later than 75 days from the date of publication of this notice in the Federal Register. Comments received after this date will be considered, if it is practical to do so, but the NRC staff is able to ensure consideration only for comments received on or before this date.","disposition_notes":null,"docket_ids":["NRC-2008-0122"],"dockets":[],"document_number":"E9-11037","effective_on":null,"end_page":23220,"executive_order_notes":null,"executive_order_number":null,"full_text_xml_url":"https://www.federalregister.gov/documents/full_text/xml/2009/05/18/E9-11037.xml","html_url":"https://www.federalregister.gov/documents/2009/05/18/E9-11037/nuregcr-xxxx-criteria-for-development-of-evacuation-time-estimate-studies-draft-report-for-comment","images":{},"images_metadata":{},"json_url":"https://www.federalregister.gov/api/v1/documents/E9-11037?publication_date=2009-05-18","mods_url":"https://www.govinfo.gov/metadata/granule/FR-2009-05-18/E9-11037/mods.xml","not_received_for_publication":null,"page_length":2,"page_views":{"count":69,"last_updated":"2026-09-23 02:15:05 -0400"},"pdf_url":"https://www.govinfo.gov/content/pkg/FR-2009-05-18/pdf/E9-11037.pdf","presidential_document_number":null,"proclamation_number":null,"public_inspection_pdf_url":null,"publication_date":"2009-05-18","raw_text_url":"https://www.federalregister.gov/documents/full_text/text/2009/05/18/E9-11037.txt","regulation_id_number_info":{},"regulation_id_numbers":[],"regulations_dot_gov_info":{"supporting_documents":[{"title":"NUREG/CR-7002, Rev. 1, \"Criteria for Development of Evacuation Time Estimate Studies\"","document_id":"NRC-2008-0122-0188"},{"title":"Regulatory Guide 1.219 - \"Guidance on Making Changes to Emergency Plans for Nuclear Power Reactors\"","document_id":"NRC-2008-0122-0168"},{"title":"NUREG-0654/FEMA-REP-1, Rev. 1, Supplement 3 - Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants","document_id":"NRC-2008-0122-0165"},{"title":"NSIR/DPR-ISG-01 - Interim Staff Guidance; Emergency Planning for Nuclear Power Plants","document_id":"NRC-2008-0122-0164"},{"title":"Meeting Notice for May 25, 2011 Public Meeting - Scope of On-Shift Staffing Analysis","document_id":"NRC-2008-0122-0156"},{"title":"Draft NSIR/DPR-ISG-01, Interim Staff Guidance - Emergency Planning for Nuclear Power Plants","document_id":"NRC-2008-0122-0155"},{"title":"Draft NUREG/CR-7002, \"Criteria for Development of Evacuation Time Estimate Studies\"","document_id":"NRC-2008-0122-0154"},{"title":"Regulatory Guide 1.219, \"Guidance on Making Changes to Emergency Plans for Nuclear Power Reactors\"","document_id":"NRC-2008-0122-0153"},{"title":"SECY-11-0053 \"Final Rule:  Enhancements to Emergency Preparedness Regulations (10 CFR Part 50 and 10 CFR Part 52)\"","document_id":"NRC-2008-0122-0152"},{"title":"Slides Presented at March 29, 2011 Public Meeting - Scope of On-Shift Staffing Analysis","document_id":"NRC-2008-0122-0150"}],"regulatory_plan":{"html_url":"https://www.federalregister.gov/regulations/3150-AI10/enhancements-to-emergency-preparedness-regulations-and-guidance-nrc-2008-0122-","title":"Enhancements to Emergency Preparedness Regulations and Guidance [NRC-2008-0122]"},"comments_url":"https://www.regulations.gov/docketBrowser?rpp=50&so=DESC&sb=postedDate&po=0&dct=PS&D=NRC-2008-0122","supporting_documents_count":38,"docket_id":"NRC-2008-0122","regulation_id_number":"3150-AI10","title":"Emergency Preparedness"},"regulations_dot_gov_url":null,"significant":null,"signing_date":null,"start_page":23219,"subtype":null,"title":"NUREG/CR-XXXX, Criteria for Development of Evacuation Time Estimate Studies, Draft Report for Comment","toc_doc":"NUREG/CRXXXX","toc_subject":"Criteria for Development of Evacuation Time Estimate Studies, Draft Report for Comment:","topics":[],"type":"Notice","volume":74}