Legal Status
Legal Status
Notice
Grain-Oriented Electrical Steel From Italy: Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Review
A Notice by the International Trade Administration on
Document Details
Information about this document as published in the Federal Register.
- Printed version:
- Publication Date:
- 03/17/2000
- Agencies:
- International Trade Administration
- Dates:
- March 17, 2000.
- Effective Date:
- 03/17/2000
- Document Type:
- Notice
- Document Citation:
- 65 FR 14535
- Page:
- 14535 (1 page)
- Document Number:
- 00-6690
Document Details
-
Enhanced Content - Table of Contents
This tables of contents is a navigational tool, processed from the headings within the legal text of Federal Register documents. This repetition of headings to form internal navigation links has no substantive legal effect.
Enhanced Content - Table of Contents
-
Enhanced Content - Submit Public Comment
- This feature is not available for this document.
Enhanced Content - Submit Public Comment
-
Enhanced Content - Read Public Comments
- This feature is not available for this document.
Enhanced Content - Read Public Comments
-
Enhanced Content - Sharing
- Shorter Document URL
- https://www.federalregister.gov/d/00-6690 https://www.federalregister.gov/d/00-6690
Enhanced Content - Sharing
-
Enhanced Content - Document Tools
These tools are designed to help you understand the official document better and aid in comparing the online edition to the print edition.
-
These markup elements allow the user to see how the document follows the Document Drafting Handbook that agencies use to create their documents. These can be useful for better understanding how a document is structured but are not part of the published document itself.
Display Non-Printed Markup Elements
Enhanced Content - Document Tools
-
-
Enhanced Content - Developer Tools
This document is available in the following developer friendly formats:
- JSON: Normalized attributes and metadata
- XML: Original full text XML
- MODS: Government Publishing Office metadata
More information and documentation can be found in our developer tools pages.
Enhanced Content - Developer Tools
Published Document
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Import Administration, International Trade Administration, Department of Commerce
EFFECTIVE DATE:
March 17, 2000.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Samantha Denenberg at (202) 482-1386, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Ave, NW, Washington, DC 20230.
Time Limits
Statutory Time Limits
Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act), requires the Department to make a preliminary determination within 245 days after the last day of the anniversary month of an order/finding for which a review is requested and a final determination within 120 days after the date on which the preliminary determination is published. However, if it is not practicable to complete the review within these time periods, section 751(a)(3)(A) of the Act allows the Department to extend the time limit for the preliminary determination to a maximum of 365 days. The time limit for the final determination may be extended to 180 days (or 300 days if the Department does not extend the time limit for the preliminary determination) from the date of publication of the preliminary determination.
Background
On October 1, 1999, the Department published a notice of initiation of administrative review of the antidumping duty order on Grain-Oriented Electrical Steel from Italy, covering the period August 1, 1998 through July 31, 1999 (64 FR 53318). The preliminary results are currently due no later than May 2, 2000.
Extension of Time Limit for Preliminary Results of Review
We determine that it is not practicable to complete the preliminary results of this review within the original time limit. Therefore the Department is extending the time limit for completion of the preliminary results until no later than August 30, 2000. See Decision Memorandum from Richard Weible to Joseph A. Spetrini, dated March 9, 2000, which is on file in the Central Records Unit, Room B-099 of the main Commerce building. We intend to issue the final results no later than 120 days after the publication of the preliminary results notice.
This extension is in accordance with section 751(a)(3)(A) of the Act.
Start SignatureDated: March 9, 2000.
Joseph A. Spetrini,
Deputy Assistant Secretary, AD/CVD Enforcement Group III.
[FR Doc. 00-6690 Filed 3-16-00; 8:45 am]
BILLING CODE 3510-DS-P