This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Rule
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
35
as of
11/06/2026 at 10:15 am EST
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
National Aeronautics and Space Administration (NASA).
ACTION:
Final rule.
SUMMARY:
This is a final rule amending the NASA FAR Supplement (NFS) to make miscellaneous administrative and editorial changes.
EFFECTIVE DATE:
December 28, 2000.
FOR FURTHER INFORMATION CONTACT:
Celeste Dalton, NASA Headquarters, Office of Procurement, Contract Management Division (Code HK), Washington, DC 20546, telephone: (202) 358-1645; email: cdalton@hq.nasa.gov.
SUPPLEMENTARY INFORMATION:
A. Background
This final rule (1) provides guidance on what should be addressed in NASA's Governmentwide purchase card training for purchase cardholders and approving officials; (2) deletes the NASA coverage for addressing contract bundling in acquisition plans which is duplicative of FAR coverage contained in Federal Acquisition Circular 97-15; (3) clarifies guidance on NASA's external audit follow-up system; and (4) makes technical corrections in Parts 1816, 1835, 1842, 1845, 1852, and 1872.
B. Regulatory Flexibility Act
This final rule does not constitute a significant revision within the meaning of FAR 1.501 and Pub. L. 98-577, and publication for comments is not required. However, comments from small business entities concerning the affected NFS coverage will be considered in accordance with 5 U.S.C. 610. Such comments may be submitted separately and should cite 5 U.S.C. 601,
et seq.
C. Paperwork Reduction Act
The Paperwork Reduction Act does not apply because the changes to the NFS do not impose any recordkeeping or information collection requirements that require the approval of the Office of Management and Budget under 44 U.S.C. 3501,
et seq.
All cardholders and approving officials must complete training prior to receiving a purchase card. Training will address the responsibilities of the cardholder and approving official, prohibited purchases, purchase limitations, and sources of supply.
PART 1816—TYPES OF CONTRACTS
4. In section 1816.203-4, revise paragraph (a) to read as follows:
(a) In addition to the approval requirements in the prescriptions at FAR 52.216-2 through 52.216-4, the contracting officer shall coordinate with the installation's Deputy Chief Financial Officer (Finance) before exceeding the ten-percent limit in paragraph (c)(1) of the clauses at FAR 52.216-2 and 52.216-3 and paragraph (c)(4) of the clause at 52.216-4.
Communications with contractors are vital to improved performance and this is NASA's primary objective in evaluating past performance. Other objectives include providing data for future source selections. While the evaluations must reflect both shortcomings and achievements during performance, they should also elicit from the contractors their views on impediments to improved performance emanating from the Government or other sources.
(a) This section implements OMB Circular No. A-50 and NASA Policy Directive (NPD) 1200.10 “Internal Management Controls and Audit Liaison and Followup”, which provide more detailed guidance. Recommendations from external audits (OMB Circular No. A-133, Audits of States, Local Governments, and Non-Profit Institutions) shall be resolved by formal review and approval procedures analogous to those at 1815.406-171.
(b) The external audit followup system tracks all contract and OMB Circular No. A-133 audits where NASA has resolution and disposition authority. The objective of the tracking system is to ensure that audit recommendations are resolved within 6 months after receipt of the audit report and corrected as expeditiously as possible.
(c)(1) The identification and tracking of contract audit reports under NASA cognizance are accomplished in cooperation with the DCAA.
(2) Identification and tracking of OMB Circular No. A-133 audit reports are accomplished in cooperation with the NASA Office of the Inspector General (OIG).
(d)(1) All reportable contract audit reports as defined by Chapter 15, Section 6, of the DCAA Contract Audit Manual (CAM) shall be reported quarterly to the Headquarters Office of Procurement (Code HK); and
(2) Only OMB Circular No. A-133 audit reports involving the following shall be reported quarterly to Code HK:
(i) A significant management control issue; or
(ii) Questioned costs of $10,000 or more due to an audit finding (see Subpart E-Auditor, paragraph 510 of OMB Circular No. A-133).
(3) NASA contracting officers will maintain a dialogue with DOD Administrative Contracting Officers (ACO) who have been delegated activities on NASA contracts. A review will be conducted no less frequently than semiannually, and the status and disposition of significant audit findings will be documented in the contract file. During this review, NASA contracting officers should discuss with the ACO both prime and subcontract audit reports that have been delegated to DOD. Should these reports contain any findings or recommendations, the NASA contracting officer should obtain their status and document the contract file accordingly.
(e)(1) The terms “resolution” and “disposition” are defined in as follows:
(i) Resolution—The point at which the IG and Management agree on the action to be taken on audit report findings and recommendations.
(ii) Corrective action—Management action responsive to an agreed upon audit recommendation.
(2) The resolution and disposition of OMB Circular No. A-133 audits are handled as follows:
(i) Audit findings pertaining to an individual NASA award are the responsibility of the procurement officer administering that award.
(ii) Audit findings having a Governmentwide impact are the responsibility of the cognizant Federal agency responsible for oversight. For organizations subject to OMB Circular No. A-133, there is either a cognizant agency or an oversight agency. The cognizant agency is the Federal agency that provides the predominant amount of direct funding to the recipient organization unless OMB makes a specific cognizant agency for audit assignment. To provide for the continuity of cognizance, the determination of the predominant amount of direct funding will be based on the direct Federal awards expended in the recipient's fiscal years ending in 1995, 2000, 2005, and every fifth year thereafter. When there is no direct funding, the Federal agency with the predominant indirect funding is to assume the oversight responsibilities. In cases where NASA is the cognizant or oversight Federal agency, audit resolution and disposition is the responsibility of the procurement officer for the Center having the largest amount of direct funding, or, if there is no direct funding, the largest amount of indirect funding for the audited period. A copy of the memorandum dispositioning the findings shall be provided by each Center having resolution responsibility for the particular report to the Headquarters OIG office and Code HK.
PART 1845—GOVERNMENT PROPERTY
8. In section 1845.7101-1, revise paragraph (c) to read as follows:
(c)
Buildings.
Includes costs of buildings, improvements to buildings, and fixed equipment required for the operation of a building which is permanently attached to and a part of the building and cannot be removed without cutting into the walls, ceilings, or floors. Contractors shall report buildings with a unit acquisition cost of $100,000 or more. Examples of fixed equipment required for functioning of a building include plumbing, heating and lighting equipment, elevators, central air conditioning systems, and built-in safes and vaults.
* * * * *
PART 1852—SOLICITATION PROVISIONS AND CONTRACT CLAUSES
While not all of the guidelines outlined in 1872.705-2 will be applicable in response to every AO, the investigator should be informed of the
( printed page 82298)
relevant information required. The proposal may be submitted on a form supplied by the Program Office. However, the proposal should be submitted in at least two sections:
(a) Investigation and Technical Plan; and
(b) Management and Cost Plan as described in 1872.705-2.
13. Amend Part VI of section 1872.705 by removing “Appendix C” in paragraph (b)(5) and adding “Appendix B” in its place and removing “General Instructions and Provisions” in paragraphs (d) and (e) and adding “Guidelines for Proposal Preparation” in its place.