Skip to Content

Rule

Drawbridge Operation Regulations; Manitowoc River, WI

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Coast Guard, DOT.

ACTION:

Direct final rule; confirmation of effective date.

Start Printed Page 27868

SUMMARY:

On March 6, 2001, we published a direct final rule (66 FR 13433). This direct final rule notified the public of our intent to revise the operating regulations governing the Eighth Street bridge (mile 0.29), Tenth Street bridge (mile 0.43), and the Wisconsin Central (formerly Soo Line) bridge (mile 0.91), on the Manitowoc River. The direct final rule re-established the schedule published in 1983 that was erroneously removed by another rule in 1984. We have not received an adverse comment or notice of intent to submit adverse comment on this rule. Therefore, this rule will go into effect as scheduled.

DATES:

The effective date of the direct final rule is confirmed as June 4, 2001.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Mr. Scot M. Striffler, Project Manager, Ninth Coast Guard District (obr), at (216) 902-6084.

Start Signature

Dated: May 7, 2001.

James D. Hull,

Rear Admiral, U.S. Coast Guard, Commander, Ninth Coast Guard District.

End Signature End Further Info End Preamble

[FR Doc. 01-12722 Filed 5-18-01; 8:45 am]

BILLING CODE 4910-15-U