Furfuryl Alcohol From Thailand: Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Review
A Notice by the International Trade Administration on
Document Details
Information about this document as published in the Federal Register.
- Printed version:
- Publication Date:
- 01/18/2002
- Agencies:
- International Trade Administration
- Dates:
- January 18, 2002.
- Effective Date:
- 01/18/2002
- Document Type:
- Notice
- Document Citation:
- 67 FR 2636
- Page:
- 2636 (1 page)
- Agency/Docket Number:
- A-549-812
- Document Number:
- 02-1390
Document Details
-
Enhanced Content - Table of Contents
This tables of contents is a navigational tool, processed from the headings within the legal text of Federal Register documents. This repetition of headings to form internal navigation links has no substantive legal effect.
Enhanced Content - Table of Contents
-
Enhanced Content - Submit Public Comment
- This feature is not available for this document.
Enhanced Content - Submit Public Comment
-
Enhanced Content - Read Public Comments
- This feature is not available for this document.
Enhanced Content - Read Public Comments
-
Enhanced Content - Sharing
- Shorter Document URL
- https://www.federalregister.gov/d/02-1390 https://www.federalregister.gov/d/02-1390
Enhanced Content - Sharing
-
Enhanced Content - Document Tools
These tools are designed to help you understand the official document better and aid in comparing the online edition to the print edition.
-
These markup elements allow the user to see how the document follows the Document Drafting Handbook that agencies use to create their documents. These can be useful for better understanding how a document is structured but are not part of the published document itself.
Display Non-Printed Markup Elements
Enhanced Content - Document Tools
-
-
Enhanced Content - Developer Tools
This document is available in the following developer friendly formats:
- JSON: Normalized attributes and metadata
- XML: Original full text XML
- MODS: Government Publishing Office metadata
More information and documentation can be found in our developer tools pages.
Enhanced Content - Developer Tools
Published Document
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Import Administration, International Trade Administration, Department of Commerce.
EFFECTIVE DATE:
January 18, 2002.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Charles Riggle or Tisha Loeper-Viti at (202) 482-0650 or (202) 482-7425, Office of AD/CVD Enforcement 5, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington, DC 20230.
Time Limits
Statutory Time Limits
Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act), requires the Department to complete the preliminary results within 245 days after the last day of the anniversary month of an order/finding for which a review is requested and the final results within 120 days after the date on which the preliminary results are published. However, if it is not practicable to complete the review within these time periods, section 751(a)(3)(A) of the Act allows the Department to extend the time limit for the preliminary results to a maximum of 365 days after the last day of the anniversary month of an order/finding for which a review is requested, and for the final results to 180 days (or 300 days if the Department does not extend the time limit for the preliminary results) from the date of publication of the preliminary results.
Background
On August 20, 2001, the Department of Commerce (the Department) published a notice of initiation of administrative review of the antidumping duty order on furfuryl alcohol from Thailand, covering the period July 1, 2000 through June 30, 2001 (66 FR 43570). The preliminary results are currently due no later than April 2, 2002.
Extension of Time Limit for Preliminary Results of Review
We determine that it is not practicable to complete the preliminary results of this review within the original time limit for the reasons stated in our memorandum from Gary Taverman to Bernard Carreau, which is on file in the Central Records Unit, Room B-099 of the main Commerce building. Therefore, the Department is extending the time limit for completion of the preliminary results until no later than July 31, 2002. We intend to issue the final results no later than 120 days after publication of the preliminary results notice.
This extension is in accordance with section 751(a)(3)(A) of the Act.
Start SignatureDated: January 14, 2002.
Bernard Carreau,
Deputy Assistant Secretary for AD/CVD Enforcement II.
[FR Doc. 02-1390 Filed 1-17-02; 8:45 am]