Skip to Content

Rule

Prevailing Rate Systems; Change in the Survey Cycle for the Pennington, South Dakota, Nonappropriated Fund Wage Area

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble Start Printed Page 13553

AGENCY:

Office of Personnel Management.

ACTION:

Final rule.

SUMMARY:

The Office of Personnel Management is issuing a final rule to change the timing of local wage surveys in the Pennington, South Dakota, nonappropriated fund Federal Wage System wage area. The change will help balance the workload for the Department of Defense and improve the amount and quality of data it collects during local annual wage surveys in the Pennington wage area.

DATES:

Effective Date: April 24, 2002.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Chenty I. Carpenter at (202) 606-8359; by FAX at (202) 606-4264; or by email at cicarpen@opm.gov.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

On December 19, 2000, the Office of Personnel Management (OPM) published a proposed rule to change the timing of local wage surveys in the Pennington, South Dakota, nonappropriated (NAF) Federal Wage System (FWS) wage area (65 FR 79320). The proposed rule provided a 30-day period for public comment, during which OPM received no comments.

The Department of Defense (DOD), the lead agency for the Pennington, SD, wage area, requested that the survey schedule be changed so that full-sale surveys could be conducted in June of even-numbered fiscal years. DOD conducted a full-scale survey in January 2002 and will conduct another full-scale survey in June 2002. The change from January to June will help avoid problems associated with conducting local wage surveys during inclement weather in western South Dakota and will improve wage survey participation and data yield. In addition, the new survey cycle will allow DOD to achieve a better balance in its wage survey workload.

The Federal Prevailing Rate Advisory Committee, the national labor-management committee responsible for advising OPM on matters concerning the pay of FWS employees, recommended by consensus that we change the full-scale survey cycle for the Pennington NAF wage area from January of even-numbered fiscal years to June of even-numbered fiscal years.

Regulatory Flexibility Act

I certify that this regulation will not have a significant economic impact on a substantial number of small entities because it affects only Federal agencies and employees.

Start List of Subjects

List of Subjects in 5 CFR Part 532

End List of Subjects Start Signature

U.S. Office of Personnel Management.

Kay Coles James,

Director.

End Signature Start Amendment Part

Accordingly, the Office of Personnel Management is amending

End Amendment Part Start Part

PART 532—PREVAILING RATE SYSTEMS

End Part Start Amendment Part

1. The authority citation for part 532 continues to read as follows:

End Amendment Part Start Authority

Authority: 5 U.S.C. 5343, 5346; § 532.707 also issued under 5 U.S.C. 552.

End Authority

Appendix A to Subpart B of Part 532—[Amended]

2. Appendix B to subpart B is amended by revising under the State of South Dakota the listing of beginning month of survey from “January” to “June” for the Pennington NAF wage area.

End Supplemental Information

[FR Doc. 02-7022 Filed 3-22-02; 8:45 am]

BILLING CODE 6325-39-P