Skip to Content

Rule

Drawbridge Operation Regulations: Hutchinson River, NY

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Coast Guard, DOT.

ACTION:

Notice of temporary deviation from regulations.

SUMMARY:

The Commander, First Coast Guard District, has issued a temporary deviation from the drawbridge operation regulations for the Pelham Bay railroad bridge, mile 0.5, across the Hutchinson River at New York. This temporary deviation will allow the bridge to remain closed to navigation from 10 a.m. on April 18, 2002 through 5 a.m. on April 19, 2002, and from 10 a.m. on April 22, 2002 through 5 a.m. on April 23, 2002, to facilitate repairs at the bridge.

DATES:

This deviation is effective from April 18, 2002 through April 23, 2002.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Joseph Schmied, Project Officer, First Coast Guard District, at (212) 668-7195.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

The bridge owner, the National Railroad Passenger Corporation (Amtrak), requested a temporary deviation from the drawbridge operating regulations to facilitate necessary maintenance, replacement of pinion gears and the rack, at the bridge. The performance of these repairs require the bridge to remain in the closed position.

The Coast Guard and the owner of the bridge coordinated this closure with the mariners that normally use this waterway to help facilitate this necessary bridge repair and to minimize any disruption to the marine transportation system. Therefore, as a result of that coordination effort, a temporary deviation from the drawbridge operation regulations has been approved. Under this temporary deviation the Pelham Bay railroad bridge will not open for vessel traffic from 10 a.m. on April 18, 2002 through 5 a.m. on April 19, 2002, and from 10 a.m. on April 22, 2002 through 5 a.m. on April 23, 2002.

This deviation from the operating regulations is authorized under 33 CFR 117.35, and will be performed with all due speed in order to return the bridge to normal operation as soon as possible.

Start Signature

Dated: March 21, 2002.

G.N. Naccara,

Rear Admiral, Coast Guard, Commander, First Coast Guard District.

End Signature End Supplemental Information

[FR Doc. 02-8182 Filed 4-3-02; 8:45 am]

BILLING CODE 4910-15-P