This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
The comment period ends December 31, 2003. Comments received after this date will be considered if it is practical to do so, but the staff is able to assure consideration only for comments received on or before this date.
Table of Contents
Enhanced Content - Table of Contents
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
25
as of
11/15/2026 at 4:15 am EST
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Nuclear Regulatory Commission.
ACTION:
Notice of Availability for comment and voluntary, trial use.
SUMMARY:
The Nuclear Regulatory Commission (NRC) has issued for public comment and voluntary use, on a trial basis, Draft Revision 9 of NUREG-1021, “Operator Licensing Examination Standards for Power Reactors.” The Commission uses NUREG-1021 to provide policy and guidance for the development, administration, and grading of written examinations and operating tests used to determine the qualifications of individuals who apply for reactor operator (RO) and senior reactor operator (SRO) licenses at nuclear power plants pursuant to the Commission's regulations in 10 CFR Part 55, “Operators' Licenses.” NUREG-1021 also provides guidance for verifying the continued qualifications of licensed operators when the staff determines that NRC requalification examinations are necessary.
The draft revision includes a number of changes that the NRC staff believes will reduce the regulatory burden on facility licensees and improve efficiency, while maintaining operational safety and public confidence: Notably, the RO written examination has been shortened from 100 to 75 questions, the design of the 100-question SRO written examination has been clarified and simplified, the administrative and systems portions of the walk-through operating test have been combined and reapportioned, and the grading criteria for the simulator operating test have been clarified to enhance consistency. A number of additional changes have been made to address questions raised since Revision 8, Supplement 1, was issued in April 2001 and to conform with other regulatory activities. The changes are outlined in the Executive Summary of the draft revision and are identified with highlights and strikeouts for ease of review.
The draft revision is available for review via the NRC's Public Electronic Reading Room (
http://www.nrc.gov/public-involve/doc-comment.html), on the NRC's Operator Licensing Web site (
http://www.nrc.gov/reactors/operator-licensing.html), and in the NRC's Public Document Room located at 11555 Rockville Pike, Rockville, Maryland. If you do not have electronic access to NRC documents, you may request a single copy of the draft revision by writing to the Office of the Chief Information Officer, Reproduction and Distribution Services Branch, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001 (Facsimile: 301-512-2289). Telephone requests cannot be accommodated. NUREG documents are not copyrighted, and Commission approval is not required to reproduce them.
Draft Revision 9 is being immediately implemented on a voluntary, trial basis. The NRC will evaluate any comments and recommendations that are received and any lessons that are learned during the trial period, incorporate any additional changes, as appropriate, and, thereafter, publish final Revision 9 for general use. Minor changes and clarifications that may become necessary during the trial period will be promulgated, without formal notice, via the NRC's Operator Licensing Web site (
http://www.nrc.gov/reactors/operator-licensing.html).
( printed page 5313)
DATES:
The comment period ends December 31, 2003. Comments received after this date will be considered if it is practical to do so, but the staff is able to assure consideration only for comments received on or before this date.
ADDRESSES:
Written comments may be submitted to the Rules and Directives Branch, Division of Administrative Services, Office of Administration, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. You may also provide comments via the NRC's Operator Licensing Web site (
http://www.nrc.gov/reactors/operator-licensing.html) or the NRC's Public Electronic Reading Room (
http://www.nrc.gov/reading-rm/doc-collections/nuregs/ #comments). Copies of comments received may be examined at the NRC's Public Document Room, 11555 Rockville Pike, Rockville, Maryland.
FOR FURTHER INFORMATION CONTACT:
Mr. S. Guenther by telephone at (301) 415-1056, or by e-mail at sxg@nrc.gov.
Dated at Rockville, Maryland, this 23rd day of January 2003.
For the Nuclear Regulatory Commission.
Theodore R. Quay,
Chief, Equipment and Human Performance Branch, Division of Inspection Program Management, Office of Nuclear Reactor Regulation.