Skip to Content

Notice

Battle Creek Salmon and Steelhead Restoration Project, Tehama and Shasta Counties, CA

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Bureau of Reclamation, Interior.

ACTION:

Notice of change to public hearing date for the Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR).

SUMMARY:

The Bureau of Reclamation (Reclamation), the lead Federal agency; the Federal Energy Regulatory Commission, a cooperating Federal agency and the State Water Resources Control Board (SWRCB), the State lead agency, are changing the public hearing date for the Draft EIS/EIR from August 12, 2003, to August 27, 2003. The notice of availability of the Draft EIS/EIR and notice of public workshop and notice of public hearing was published in the Federal Register on July 18, 2003 (68 FR 42758-42759).

DATES:

The public hearing for the Draft EIS/EIR will be held on August 27, 2003, from 6 p.m. to 8:30 p.m. at the address below.

ADDRESSES:

The public hearing will be held at the Manton Grange, 31557 Forward Road, Manton, California.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Ms. Mary Marshall, Reclamation, at 916-978-5248, TDD 916-978-5608, e-mail: mmarshall@mp.usbr.gov or Mr. Jim Canaday, SWRCB, at 916-341-5308, e-mail: jcanaday@waterrights.swrcb.ca.gov.

Start Signature

Dated: August 6, 2003.

Kenneth Lentz,

Chief, Scientific Support Branch, Mid-Pacific Region.

End Signature End Further Info End Preamble

[FR Doc. 03-20572 Filed 8-12-03; 8:45 am]