This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
Certain Polyethylene Terephthalate Film, Sheet and Strip from India: Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Review
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Notice of extension of time limit for the preliminary results of antidumping duty administrative review.
Certain Polyethylene Terephthalate Film, Sheet and Strip from India: Extension of Time Limit for Preliminary Results of Antidumping Duty Administrative Review
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
19
as of
10/17/2026 at 2:15 pm EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Import Administration, International Trade Administration, Department of Commerce.
ACTION:
Notice of extension of time limit for the preliminary results of antidumping duty administrative review.
SUMMARY:
The Department of Commerce (the Department) is extending the time limit for the preliminary results of the administrative review of the antidumping duty order on certain polyethylene terephthalate film, sheet and strip from India until July 30, 2004. This extension applies to the sole respondent in the case, Jindal Polyester Limited. The period of review is December 21, 2001, through June 30, 2003.
( printed page 17645)
EFFECTIVE DATE:
April 5, 2004.
FOR FURTHER INFORMATION CONTACT:
Drew Jackson or John Conniff, AD/CVD Enforcement, Office 4, Group II, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW, Washington, DC 20230; telephone (202) 482-4406 or (202) 482-1009, respectively.
Background
On August 22, 2003, the Department published a notice of initiation of an administrative review of the antidumping duty order on certain polyethylene terephthalate film, sheet and strip from India, covering the period December 21, 2001 through June 30, 2003.
See Initiation of Antidumping and Countervailing Duty Administrative Reviews and Request for Revocation in Part, 68 FR 50750. The preliminary results of review are currently due no later than April 1, 2004.
Statutory Time Limits
Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (the Act), requires the Department to make a preliminary determination within 245 days after the last day of the anniversary month of an order or finding for which a review is requested and a final determination within 120 days after the date on which the preliminary determination is published. However, if it is not practicable to complete the review within these time periods, section 751(a)(3)(A) of the Act allows the Department to extend the 245-day time limit for the preliminary determination to a maximum of 365 days and the time limit for the final determination to 180 days (or 300 days if the Department does not extend the time limit for the preliminary determination) from the date of publication of the preliminary determination.
Extension of Time Limit for Preliminary Results of Review
We determine that it is not practicable to complete the preliminary results of this review within the original time limit. See Decision Memorandum from Thomas F. Futtner, Acting Office Director to Holly A. Kuga, Acting Deputy Assistant Secretary for Import Administration, Group II, dated concurrently with this notice, which is on file in the Central Records Unit, room B-099 of the Department's main building. The Department is therefore extending the time limit for the completion of the preliminary results by 120 days. We intend to issue the preliminary results no later than July 30, 2004.
This notice is published in accordance with section 751(a)(3)(A) of the Act.
Dated: March 22, 2004.
Holly A. Kuga,
Acting Deputy Assistant Secretary for Import Administration, Group II.