This site displays a prototype of a “Web 2.0” version of the daily
Federal Register. It is not an official legal edition of the Federal
Register, and does not replace the official print version or the official
electronic version on GPO’s govinfo.gov.
The documents posted on this site are XML renditions of published Federal
Register documents. Each document posted on the site includes a link to the
corresponding official PDF file on govinfo.gov. This prototype edition of the
daily Federal Register on FederalRegister.gov will remain an unofficial
informational resource until the Administrative Committee of the Federal
Register (ACFR) issues a regulation granting it official legal status.
For complete information about, and access to, our official publications
and services, go to
About the Federal Register
on NARA's archives.gov.
The OFR/GPO partnership is committed to presenting accurate and reliable
regulatory information on FederalRegister.gov with the objective of
establishing the XML-based Federal Register as an ACFR-sanctioned
publication in the future. While every effort has been made to ensure that
the material on FederalRegister.gov is accurately displayed, consistent with
the official SGML-based PDF version on govinfo.gov, those relying on it for
legal research should verify their results against an official edition of
the Federal Register. Until the ACFR grants it official status, the XML
rendition of the daily Federal Register on FederalRegister.gov does not
provide legal notice to the public or judicial notice to the courts.
Notice
Enter a search term or FR citation e.g.
88 FR 38230 FR 78782024-13208USDA09/05/24RULE0503-AA39SORN
Choosing an item from
full text search results
will bring you to those results. Pressing enter in the search box
will also bring you to search results.
Choosing an item from
suggestions
will bring you directly to the content.
This table of contents is a navigational tool, processed from the
headings within the legal text of Federal Register documents.
This repetition of headings to form internal navigation links
has no substantive legal effect.
Document page views are updated periodically throughout the day and are
cumulative counts for this document. Counts are subject to sampling,
reprocessing and revision (up or down) throughout the day.
Page views
7
as of
09/12/2026 at 12:15 am EDT
Other Formats
Enhanced Content - Other Formats
This document is also available in the following formats:
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
AGENCY:
Import Administration, International Trade Administration, Department of Commerce.
ACTION:
Notice of extension of time limit for the final results of antidumping duty administrative review.
EFFECTIVE DATE:
April 6, 2004.
SUMMARY:
The Department of Commerce (“the Department”) is extending the time limit for the final results of the review of stainless steel wire rods from India. This review covers the period December 1, 2001 through November 30, 2002.
FOR FURTHER INFORMATION CONTACT:
Eugene Degnan, Jonathan Herzog, or Kit Rudd, AD/CVD Enforcement, Group III, Office 9, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington DC 20230; telephone: (202) 482-0414, (202) 482-4271 and (202) 482-1385 respectively.
Background
On January 22, 2003, the Department published a notice of initiation of an antidumping duty administrative review of stainless steel wire rods (“SSWR”) from India covering the period December 1, 2001 through November 30, 2002.
See Initiation of Antidumping and Countervailing Duty Administrative Reviews and Request for Revocation in Part,68 FR 3009 (January 22, 2003). On August 5, 2003, the Department published a notice extending the time limit for the preliminary results by 60 days to December 1, 2003.
See Stainless Steel Wire Rods from India: Notice of Extension of Time Limit for the Preliminary Results of Antidumping Duty Administrative Review,68 FR 46164 (August 5, 2003). On November 21, 2003, the Department published a notice extending the time limit for the preliminary results by 11 days to
( printed page 18054)
December 12, 2003.
See Stainless Steel Wire Rods from India: Notice of Extension of Time Limit for the Preliminary Results of Antidumping Duty Administrative Review,68 FR 65680 (November 21, 2003). On December 19, 2003, the Department published the preliminary determination in this administrative review.
See Stainless Steel Wire Rods from India: Preliminary Results and Partial Rescission of Antidumping Duty Administrative Review,68 FR 70765 (December 19, 2003).
Extension of Time Limit of Final Results
Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (“the Act”), requires the Department to issue the final results of an antidumping duty review within 120 days of the date on which the preliminary results are published. However, if the Department concludes that it is not practicable to issue the results by the original deadline, it may extend the 120-day period to 180 days. Completion of the final results of this review within the 120-day period is not practicable because information critical to the review has recently been brought to the attention of the Department. As a result, the official record of the review is being reopened so this information can be entered into the record. Additionally, allowance of sufficient time for parties to submit comments and rebuttals on the augmented official record makes issuance of the final results of the review within the 120-day period impracticable.
Therefore, we are extending the time period for issuing the final results of the review by 30 days until May 17, 2004. This notice is issued and published in accordance with section 751(a)(3)(A) of the Act, and section 351.213(h)(2) of the Department's regulations.
Barbara E. Tillman,
Acting Deputy Assistant Secretary for Import Administration, Group III.