Skip to Content

Rule

Drawbridge Operation Regulations: Newtown Creek, Dutch Kills, English Kills, and Their Tributaries, NY

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Coast Guard, DHS.

ACTION:

Notice of temporary deviation from regulations.

SUMMARY:

The Commander, First Coast Guard District, has issued a temporary deviation from the drawbridge operation regulations for the Metropolitan Avenue Bridge, mile 3.4, across English Kills at New York City, New York. Under this temporary deviation the bridge may remain closed from 7 a.m. on April 26, 2004 through 4 p.m. on May 1, 2004, and from 7 a.m. on June 9, 2004 through 4 p.m. on June 12, 2004, to facilitate necessary bridge maintenance.

DATES:

This deviation is effective from April 26, 2004 through June 12, 2004.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Joe Arca, Project Officer, First Coast Guard District, at (212) 668-7069.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

The New York City Department of Transportation (NYCDOT) Metropolitan Avenue Bridge has a vertical clearance in the closed position of 10 feet at mean high water and 15 feet at mean low water. The existing drawbridge operation regulations are listed at 33 CFR 117.801(e).

NYCDOT, requested a temporary deviation from the drawbridge operation regulations to facilitate repairs to the electrical controls at the bridge. The bridge must remain in the closed position to perform these repairs.

Start Printed Page 21065

Under this temporary deviation the NYCDOT Metropolitan Avenue Bridge may remain in the closed position from 7 a.m. on April 26, 2004 through 4 p.m. on May 1, 2004 and from 7 a.m. on June 9, 2004 through 4 p.m. on June 12, 2004.

This deviation from the operating regulations is authorized under 33 CFR 117.35, and will be performed with all due speed in order to return the bridge to normal operation as soon as possible.

Start Signature

Dated: April 7, 2004.

John L. Grenier,

Captain, U.S. Coast Guard , Acting Commander, First Coast Guard District.

End Signature End Supplemental Information

[FR Doc. 04-8862 Filed 4-19-04; 8:45 am]

BILLING CODE 4910-15-P