Skip to Content


Notice of Request for Extension of Time To Commence and Complete Project Construction and Soliciting Comments

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble June 18, 2004.

Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:

a. Type of Application: Request for Extension of Time.

b. Project No: 11509-014.

c. Date Filed: April 12, 2004.

d. Applicant: City of Albany, Oregon.

e. Name of Project: City of Albany Hydroelectric Project.

f. Location: The project is located on the Albany-Santiam Canal system in Linn County, Oregon.

g. Pursuant to: Public Law 107-376, H.R. 5436.

h. Applicant Contact: Peter Harr, P.E., City of Albany, City Hall, 333 Broadalbin SW, P.O. Box 490, Albany, OR 97321-0144, (541) 917-7500.

i. FERC Contact: Any questions on this notice should be addressed to Mr. Lynn R. Miles, Sr. at (202) 502-8763.

j. Deadline for filing comments and or motions: July 23, 2004.

All documents (original and eight copies) should be filed with: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426. Comments, protests and interventions may be filed electronically via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's web site under the “e-Filing” link. Please include the project number (P-11509-014) on any comments or motions filed.

The Commission's Rules of Practice and Procedure require all interveners filing documents with the Commission to serve a copy of that document on each person in the official service list for the project. Further, if an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.

k. Description of Project: The licensee requests a two-year extension of time from the existing amended deadline of October 23, 2004 to October 23, 2006, to commence project construction of the City of Albany Hydroelectric Project. If granted, this would be the licensee's second two-year extension of the three authorized by Public Law No. 107-376, H.R. 5436.

l. Locations of Applications: A copy of the application is available for inspection and reproduction at the Commission in the Public Reference Room, located at 888 First Street NE, Room 2A, Washington DC 20426, or by calling (202) 502-8371. This filing may also be viewed on the Commission's Web site at using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call toll-free (866) 208-3676 or e-mail For TTY, call (202) 502-8659. A copy is also available for inspection and reproduction at the address in item h. above.

m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.

n. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

o. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title “COMMENTS”, “PROTEST”, or “MOTION TO INTERVENE”, as applicable, and the Project Number of the particular application to which the filing refers. Any of the above-named documents must be filed by providing the original and the number of copies provided by the Commission's regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. An additional copy must be sent to Director, Division of Hydropower Administration and Compliance, Federal Energy Regulatory Commission, at the above-mentioned address. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application.

p. Agency Comments—Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representatives.

Start Signature

Magalie R. Salas,


End Signature End Preamble

[FR Doc. E4-1420 Filed 6-25-04; 8:45 am]