FirstEnergy Nuclear Operating Company, Davis-Besse Nuclear Power Station, Unit 1, Withdrawal of Exemption
A Notice by the Nuclear Regulatory Commission on
Document Details
Information about this document as published in the Federal Register.
- Printed version:
- Publication Date:
- 07/06/2004
- Agency:
- Nuclear Regulatory Commission
- Document Type:
- Notice
- Document Citation:
- 69 FR 40668
- Page:
- 40668 (1 page)
- Agency/Docket Number:
- Docket No. 50-346
- Document Number:
- 04-15171
Document Details
-
Enhanced Content - Table of Contents
This tables of contents is a navigational tool, processed from the headings within the legal text of Federal Register documents. This repetition of headings to form internal navigation links has no substantive legal effect.
Enhanced Content - Table of Contents
-
Enhanced Content - Submit Public Comment
- This feature is not available for this document.
Enhanced Content - Submit Public Comment
-
Enhanced Content - Read Public Comments
- This feature is not available for this document.
Enhanced Content - Read Public Comments
-
Enhanced Content - Sharing
- Shorter Document URL
- https://www.federalregister.gov/d/04-15171 https://www.federalregister.gov/d/04-15171
Enhanced Content - Sharing
-
Enhanced Content - Document Tools
These tools are designed to help you understand the official document better and aid in comparing the online edition to the print edition.
-
These markup elements allow the user to see how the document follows the Document Drafting Handbook that agencies use to create their documents. These can be useful for better understanding how a document is structured but are not part of the published document itself.
Display Non-Printed Markup Elements
Enhanced Content - Document Tools
-
-
Enhanced Content - Developer Tools
This document is available in the following developer friendly formats:
- JSON: Normalized attributes and metadata
- XML: Original full text XML
- MODS: Government Publishing Office metadata
More information and documentation can be found in our developer tools pages.
Enhanced Content - Developer Tools
Published Document
This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.
1.0 Background
The FirstEnergy Nuclear Operating Company (the licensee) is the holder of Facility Operating License No. NPF-3 which authorizes operation of the Davis-Besse Nuclear Power Station, Unit 1 (DBNPS). The license provides, among other things, that the facility is subject to all rules, regulations, and orders of the Nuclear Regulatory Commission (NRC, the Commission) now or hereafter in effect.
The facility consists of a pressurized-water reactor located in Ottawa County in Ohio.
2.0 Request
Title 10 of the Code of Federal Regulations (10 CFR), part 50, appendix R, subsection III.L.1 requires that alternative or dedicated shutdown capability be able to achieve cold shutdown conditions within 72 hours. The NRC granted an exemption to this requirement by letter dated August 20, 1984, for DBNPS.
In summary, the licensee now concludes that DBNPS meets the requirement and the exemption is no longer required; therefore, the licensee requests that the exemption be withdrawn.
3.0 Evaluation
Two issues caused the licensee to originally request the exemption. They were the ability to depressurize the reactor coolant system and a limitation on cooldown rate. The licensee has recently performed an evaluation and determined that alternate pressurizer spray from the high pressure injection pumps could be used for depressurization and the limit on cooldown rate can be increased. The licensee concluded that DBNPS can now comply with the regulation and the exemption is no longer required.
Based upon the licensee's recent evaluation determining that DBNPS alternative shutdown capability can achieve cold shutdown within 72 hours, the staff concludes that the exemption can be withdrawn.
4.0 Conclusion
Accordingly, the Commission hereby grants FirstEnergy Nuclear Operating Company withdrawal of the exemption from the requirements of CFR part 50, appendix R, subsection III.L.1, granted by letter dated August 20, 1984, for DBNPS.
Pursuant to 10 CFR 51.32, the Commission has determined that the granting of this exemption withdrawal will not have a significant effect on the quality of the human environment (69 FR 28951).
This exemption withdrawal is effective upon issuance.
Start SignatureDated at Rockville, Maryland, this 24th day of June, 2004.
For the Nuclear Regulatory Commission.
Ledyard B. Marsh,
Director, Division of Licensing Project Management, Office of Nuclear Reactor Regulation.