Notice of Extension of Time To Commence Project Construction and Soliciting Comments, Motions To Intervene, and Protests

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble July 8, 2004.

Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:

a. Application Type: Amendment of License.

b. Project No.: 7115-035.

c. Date Filed: June 21, 2004.

d. Applicant: Homestead Energy Resources, LLC.

e. Name of Project: George W. Andrews.

f. Location: At the Corps of Engineers' George W. Andrews Lock and Dam on the Chattahoochee River in Houston County, Alabama and Early County, Georgia.

g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).

h. Applicant Contact: Charles B. Mierek, Homestead Energy Resources, LLC., 5250 Clifton-Glendale Rd., Spartanburg, SC 29307-4618, (864) 579-4405.

i. FERC Contact: Regina Saizan, (202) 502-8765.

j. Deadline for filing comments and or motions: August 9, 2004.

All documents (original and eight copies) should be filed with: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site under the “e-Filing” link. The Commission strongly encourages electronic filings. Please include the project number (P-7115-035) on any comments or motions filed.

The Commission's Rules of Practice and Procedure require all interveners filing a document with the Commission to serve a copy of that document on each person in the official service list for the project. Further, if an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.

k. Description of Amendment: Pursuant to Sections 4.200(c) and 4.202(a) of the Commission's regulations Start Printed Page 42157and Public Law 106-213, the applicant requests that its license be amended to extend the deadline for commencement of construction until September 21, 2006. The applicant also requests that completion of construction be extended by an additional four years from any extended commencement of construction date that the Commission grants.

l. Locations of Application: A copy of the application is available for inspection and reproduction at the Commission in the Public Reference Room, located at 888 First Street NE., Room 2A, Washington, DC 20426, or by calling (202) 502-8371. This filing may also be viewed on the Commission's Web site at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call toll-free 1-866-208-3676 or e-mail FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659. A copy is also available for inspection and reproduction at the address in item h. above.

m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.

n. Comments, Protests, or Motions to Intervene—Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

o. Filing and Service of Responsive Documents—Any filings must bear in all capital letters the title “COMMENTS”, “PROTEST”, OR “MOTION TO INTERVENE”, as applicable, and the Project Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application.

p. Agency Comments—Federal, State, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representatives.

Start Signature

Magalie R. Salas,

Secretary.