Notice

Published Document: E4-2730 (69 FR 61649)

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

ACTION:

Notice of extension of time limit for final results of antidumping duty administrative review.

SUMMARY:

The Department of Commerce (“the Department”) is extending the time limit for the final results of the review of stainless steel butt-weld pipe fittings from Taiwan. This review covers the period June 1, 2002, through May 31, 2003.

EFFECTIVE DATE:

October 20, 2004.

FOR FURTHER INFORMATION CONTACT:

Irene Gorelik, AD/CVD Operations, Office 9, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington, DC 20230; telephone (202) 482-6905.

Background

On July 7, 2004, the Department published the preliminary results of the administrative review of the antidumping duty order on stainless steel butt-weld pipe fittings from Taiwan. See Certain Stainless Steel Butt-Weld Pipe Fittings From Taiwan: Preliminary Results of Antidumping Duty Administrative Review and Notice of Intent To Rescind in Part,69 FR 40859 (July 7, 2004). The final results of this administrative review are currently due no later than November 4, 2004.

Extension of Time Limit for Final Results

Section 751(a)(3)(A) of the Act states that if it is not practicable to complete the review within the time specified, the administering authority may extend the 120-day period, following the date of publication of the preliminary results, to issue its final results by an additional 60 days. Completion of the final results within the 120-day period is not practicable for the following reasons: (1) This review involves certain complex constructed export price (“CEP”) adjustments including, but not limited to CEP profit and CEP offset; and (2) this review involves a complex affiliation issue.

Therefore, in accordance with section 751(a)(3)(A) of the Act, the Department is extending the time period for issuing the final results of review by 45 days until no later than December 20, 2004.

Dated: October 14, 2004.

Jeffrey A. May,

Deputy Assistant Secretary for Import Administration.

[FR Doc. E4-2730 Filed 10-19-04; 8:45 am]

BILLING CODE 3510-DS-P