Skip to Content

Notice

Notice of Extension of Time Limit for the Final Results of the Antidumping Administrative Review of Polyvinyl Alcohol from the People's Republic of China

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

EFFECTIVE DATE:

March 29, 2006.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Lilit Astvatsatrian, AD/CVD Operations, Office 8, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW, Washington, DC 20230; telephone: (202) 482-6412.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Background

On November 7, 2005, the Department of Commerce (“the Department”) published the preliminary results of the administrative review of the antidumping duty order on polyvinyl alcohol (“PVA”) from the People's Republic of China (“PRC”), covering the period August 11, 2003, through September 30, 2004. See Polyvinyl Alcohol from the People's Republic of China: Preliminary Results of Antidumping Duty Administrative Review, 70 FR 67434 (November 7, 2005) (“Preliminary Results”). In the Preliminary Results, we stated that we would make our final determination for the antidumping duty review no later than 120 days after the date of publication of the preliminary results (i.e., March 7, 2006). On February 27, 2006, the Department published in the Federal Register a notice extending the time limit for the final results of the administrative review from March 7, 2006, to April 6, 2006. See Notice of Extension of Time Limit for the Antidumping Duty Administrative Review of Polyvinyl Alcohol from the People's Republic of China, 71 FR 9781 (February 27, 2006).

Extension of Time Limit of Final Results

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (“the Act”), requires the Department to issue the final results in an administrative review within 120 days of the publication date of the preliminary results. However, if it is not practicable to complete the review within this time period, the Department may extend the time limit for the final results to 180 days. Completion of the final results within the 120-day period is not practicable because this review involves certain complex issues, including examination of the co-product allocation methodology, application of by-products, and the valuation of certain factors.

Therefore, in accordance with section 751(a)(3)(A) of the Act, the Department is extending the time period for issuing these final results of review by an additional 15 days until April 21, 2006.

Start Signature

Dated: March 22, 2006.

Stephen J. Claeys,

Deputy Assistant Secretary for Import Administration.

End Signature End Supplemental Information

[FR Doc. E6-4574 Filed 3-28-06; 8:45 am]

BILLING CODE 3510-DS-S