Skip to Content

Notice

Notice of Availability for the Draft Environmental Impact Statement for Hemet/San Jacinto Integrated Recharge and Recovery Project, Riverside County, CA; Correction

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Department of the Army—U.S. Army Corps of Engineers, DoD.

ACTION:

Notice of Availability; correction.

SUMMARY:

The U.S. Army Corps of Engineers, Los Angeles District (Regulatory Branch), in coordination with the Eastern Municipal Water District (EMWD), announced availability of a Draft Environmental Impact Statement (EIS) for the Hemet/San Jacinto Integrated Recharge and Recovery Project. The announced deadline for submittal of comments has been corrected in order to meet the statutory 45-day requirement. The new deadline is October 31, 2006.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Dr. Daniel P. Swenson, Regulatory Branch, U.S. Army Corps of Engineers, P.O. Box 532711, Los Angeles, CA 90053, (213) 452-3414.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

None.

Start Signature

David J. Castanon,

Chief, Regulatory Branch.

End Signature End Supplemental Information

[FR Doc. 06-7977 Filed 9-21-06; 8:45 am]

BILLING CODE 3710-KF-P