Skip to Content

Notice

Preclosure Safety Analysis-Level of Information and Reliability Estimation; Availability of Final Interim Staff Guidance Document

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Nuclear Regulatory Commission.

ACTION:

Notice of issuance; correction.

SUMMARY:

This document corrects a notice, appearing in the Federal Register on March 22, 2007 (72 FR 13534), that announces the availability of a final interim staff guidance document on “Preclosure Safety Start Printed Page 19554Analysis—Level of Information and Reliability Estimation.” This action is necessary to correct typographical errors.

Start Further Info

FOR FURTHER INFORMATION, CONTACT:

Jon Chen, Project Manager, Division of High-Level Waste Repository Safety, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001 [Telephone: (301) 415-5526; fax number: (301) 415-5399; e-mail: jcc2@nrc.gov.]

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

On page 13534, in the middle column, in the first paragraph, last sentence, “waste at a geologic repository” is changed to “waste geologic repository.”

On page 13536, in the middle column, in the fourth complete paragraph, lines 4-5, “DOE should to consider” is changed to read “DOE should consider.”

On page 13536, in the middle column, in the fourth complete paragraph, lines 7-8, “DOE should to provide” is changed to read “DOE should provide.”

On page 13537, in the third column, in the eighth complete paragraph, lines 1-2, “Lines 445: Though 453: λ was changed to, to distinguish this quantity” is changed to “Lines 445 through 453: λ was changed to p to distinguish this quantity.”

Start Signature

Dated at Rockville, Maryland, this 11th day of April, 2007.

For the Nuclear Regulatory Commission.

N. King Stablein,

Chief Project-Management Branch B, Division of High-Level Repository Safety, Office of Nuclear Material Safety and Safeguards.

End Signature End Supplemental Information

[FR Doc. E7-7373 Filed 4-17-07; 8:45 am]

BILLING CODE 7590-01-P