Skip to Content

Notice

Brazos Electric Power Cooperative, Inc.; Notice Granting Motion To Suspend Compliance Obligations

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble April 13, 2007.

On March 15, 2007, the Commission issued an Order Directing Interconnection and Transmission Services and Approving Settlement Agreement in Brazos Electric Power Cooperative, Inc., 118 FERC ¶ 61,199 (2007) (March 15 Order).

On March 30, 2007, Brazos Electric Power Cooperative, Inc. filed a motion requesting suspension of the obligations the Commission imposed in the March 15 Order, pending final Commission action in this proceeding.

Upon consideration, the obligations the Commission imposed in the March 15 Order are suspended pending further Commission action in this proceeding.

Start Signature

Kimberly D. Bose,

Secretary.

End Signature End Preamble

[FR Doc. E7-7576 Filed 4-19-07; 8:45 am]

BILLING CODE 6717-01-P