Certain Frozen Fish Fillets from the Socialist Republic of Vietnam: Extension of Time Limits for the Preliminary Results of the New Shipper Reviews

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

EFFECTIVE DATE:

March 25, 2008.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Javier Barrientos and Matthew Renkey, AD/CVD Operations, Office 9, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW., Washington, DC 20230; telephone: (202) 482-2243 and (202) 482-2312, respectively.

Background

On October 9, 2007, the Department published a notice of initiation of new shipper reviews of certain frozen fish fillets from Vietnam covering the period August 1, 2006, through July 31, 2007. See Certain Frozen Fish Fillets from the Socialist Republic of Vietnam: Initiation of Antidumping Duty New Shipper Reviews, 72 FR 57296 (October 9, 2007). The preliminary results of these new shipper reviews are currently due no later than March 24, 2008.

Statutory Time Limits

Section 751(a)(2)(B)(iv) of the Tariff Act of 1930, as amended (the “Act”), provides that the Department will issue the preliminary results of a new shipper review of an antidumping duty order within 180 days after the day on which the review was initiated. See also 19 CFR 351.214(i)(1). The Act further provides that the Department may extend that 180-day period to 300 days if it determines that the case is extraordinarily complicated. See 19 CFR 351.214(i)(2).

Extension of Time Limit of Preliminary Results

The Department determines that these new shipper reviews involve extraordinarily complicated methodological issues such as the use of intermediate input methodology, potential affiliation issues, and the evaluation of the bona fide nature of each company's sales. Therefore, in accordance with section 751(a)(2)(B)(iv) of the Act and 19 CFR 351.214(i)(2), the Department is extending the time limit for these preliminary results by 120 days, until no later than July 22, 2008. The final results continue to be due 90 days after the publication of the preliminary results.

We are issuing and publishing this notice in accordance with sections 751(a)(2)(B)(iv) and 777(i) of the Act.

Start Signature

Dated: March 14, 2008.

Stephen J. Claeys,

Deputy Assistant Secretary for Import Administration.

End Signature End Further Info End Preamble

[FR Doc. E8-6081 Filed 3-24-08; 8:45 am]