Skip to Content

Notice

Dynamic Random Access Memory Semiconductors from the Republic of Korea: Extension of Time Limit for Preliminary Results of the Countervailing Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce

EFFECTIVE DATE:

April 7, 2008.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Shane Subler at (202) 482-0189 or David Neubacher at (202) 482-5823; AD/CVD Operations, Office 1, Import Administration, International Trade Administration, U.S. Department of Commerce, 14th Street and Constitution Avenue, NW, Washington, DC 20230.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Background

On September 25, 2007, the Department published a notice of initiation of administrative review of the countervailing duty order on dynamic random access memory semiconductors from the Republic of Korea, covering the period January 1, 2006 through December 31, 2006. See Initiation of Antidumping and Countervailing Duty Administrative Reviews and Requests for Revocation in Part, 72 FR 54428 (September 25, 2007). On December 14, 2007, the petitioner alleged that Hynix Semiconductor, Inc., received new subsidies.

Statutory Time Limits

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (“the Act”), requires the Department of Commerce (“the Department”) to issue the preliminary results of an administrative review within 245 days after the last day of the anniversary month of an order for which a review is requested and the final results of review within 120 days after the date on which the preliminary results are published. If it is not practicable to complete the review within the time period, section 751(a)(3)(A) of the Act allows the Department to extend these deadlines to a maximum of 365 days and 180 days, respectively.

Extension of Time Limits for Preliminary Results

This administrative review is extraordinarily complicated due to the complexity of the countervailable Start Printed Page 18772subsidy practices found in the investigation and the new subsidy allegations. Because the Department requires additional time to review, analyze, and possibly verify the information, and to issue supplemental questionnaires, if necessary, it is not practicable to complete this review within the originally anticipated time limit (i.e., by May 2, 2008). Therefore, the Department is extending the time limit for completion of the preliminary results by 90 days to not later than July 31, 2008, in accordance with section 751(a)(3)(A) of the Act.

We are issuing and publishing this notice in accordance with sections 751(a)(1) and 777(i)(1) of the Act.

Start Signature

Dated: March 31, 2008.

Stephen J. Claeys,

Deputy Assistant Secretary for Import Administration.

End Signature End Supplemental Information

[FR Doc. E8-7212 Filed 4-4-08; 8:45 am]

BILLING CODE 3510-DS-S