Skip to Content

Notice

Hot-Rolled Carbon Steel Products From India: Extension of Time Limit for Preliminary Results of Countervailing Duty Administrative Review

Document Details

Information about this document as published in the Federal Register.

Published Document

This document has been published in the Federal Register. Use the PDF linked in the document sidebar for the official electronic format.

Start Preamble

AGENCY:

Import Administration, International Trade Administration, Department of Commerce.

EFFECTIVE DATE:

July 30, 2008.

Start Further Info

FOR FURTHER INFORMATION CONTACT:

Gayle Longest, AD/CVD Operations, Office 3, Import Administration, International Trade Administration, U.S. Department of Commerce, Room 4014, 14th Street and Constitution Ave., NW., Washington, DC 20230, telephone: (202) 482-3338.

End Further Info End Preamble Start Supplemental Information

SUPPLEMENTARY INFORMATION:

Background

On January 28, 2008, the U.S. Department of Commerce (“the Department”) published a notice of initiation of the administrative review of the countervailing duty order on hot-rolled carbon steel products from India covering the period January 1, 2007, through December 31, 2007. See Initiation of Antidumping and Countervailing Duty Administrative Reviews and Request for Revocation in Part, 73 FR 4829 (January 28, 2008). The preliminary results are currently due no later than September 1, 2008.

Extension of Time Limit for Preliminary Results

Section 751(a)(3)(A) of the Tariff Act of 1930, as amended (“the Act”), requires the Department to make a preliminary determination within 245 days after the last day of the anniversary month of an order for which a review is requested. Section 751(a)(3)(A) of the Act further states that if it is not practicable to complete the review within the time period specified, the administering authority may extend the 245-day period to issue its preliminary results to up to 365 days.

Due to the complexity of the issues in this administrative review, such as the absence of exports during the POR and the petitioners' request for verification, we have determined that it is not practicable to complete the preliminary results within the 245-day period. Therefore, in accordance with section 751(a)(3)(A) of the Act, we are partially extending the time period for issuing the preliminary results of the review by 109 days. The preliminary results are now due no later than December 19, 2008. The final results continue to be due 120 days after publication of the preliminary results.

This notice is issued and published in accordance with sections 751(a)(3)(A) and 777(i) of the Act.

Start Signature

Dated: July 24, 2008.

Stephen J. Claeys,

Deputy Assistant Secretary for Import Administration.

End Signature End Supplemental Information

[FR Doc. E8-17483 Filed 7-29-08; 8:45 am]

BILLING CODE 3510-DS-P